09/05 AWA1230-1917
Montageanweisung
Installation Instructions
Notice d’installation
Istruzioni per il montaggio
NZM2(-4)-160-XKC
+NZM2(-4)-160-XKCO
+NZM2(-4)-160-XKCU
Instrucciones de montaje
Инструкция по монтажу
+NZM2(-4)-250-XKCO
+NZM2(-4)-250-XKCU
NZM2(-4)-XKS
NZM2(-4)-250-XKC
...XKC Pressure Clamp Connector Kits for NZM2 Molded Case Circuit Breakers and Switches
-NA, -CNA
(UL/CSA models)
push
ON
Trip
The barrier (shown shaded in the diagrams) is held tightly into
grooves on top and bottom sides of the breaker or switch and
must be removed in order to mount NZM2-XKC pressure
clamp connectors.
To remove:
From the back of the device, use thumb pressure to push, or
an appropriate tool to gently tap each side of the barrier to
help slide it out.
Note:
Do not discard!
It will be necessary to re-install the barrier once the XKC
connectors are mounted.
Refer to instructions and diagrams which follow.
A
Lebensgefahr durch elektrischen Strom!
Nur Elektrofachkräfte und elektrotechnisch
unterwiesene Personen dürfen die im Folgenden beschriebenen Arbeiten ausführen.
Electric current! Danger to life!
Only skilled or instructed persons may carry out the
following operations.
Tension électrique dangereuse !
Seules les personnes qualifiées et averties doivent
exécuter les travaux ci-après.
Tensione elettrica: Pericolo di morte!
Solo persone abilitate e qualificate possono eseguire
le operazioni di seguito riportate.
¡Corriente eléctrica! ¡Peligro de muerte!
El trabajo a continuación descrito debe ser realizado
por personas cualificadas y advertidas.
Электрический ток! Опасно для жизни!
Только специалисты или проинструктированные
лица могут выполнять следующие операции.
Vorsicht!
Für die Durchführung der beschriebenen Arbeiten kann das Entfernen oder der
Austausch von Teilen notwendig sein.
Bitte alle Installations-Anweisungen beachten, um die erforderlichen Luft- und
Kriechstrecken nach dem Zusammenbau zu gewährleisten.
Caution!
The removal or exchange of parts during mounting may become necessary.
Refer to installation instructions for proper assembly and to maintain electrical
clearances.
Attention !
L’enlèvement où l’échange de certaines pièces pendant le montage est parfois
nécessaire.
Consultez l’instruction d’assemblage pour assurer une installation conforme aux
normes.
Attenzione!
Per l'esecuzione degli interventi descritti potrebbe essere necessaria la rimozione o
sostituzione di alcuni pezzi.
Attenersi alle istruzioni d'installazione per garantire dopo l'assemblaggio le vie di dispersione necessarie.
1 2
ON
Trip
Trip
Atención!
Con el fin de llevar a cabo los trabajos descritos, puede ser necesario eliminar o cambiar alguna pieza.
Le rogamos tenga en cuenta todas las instrucciones de instalación para así garantizar
las líneas de fuga y efluvio necesarias tras el montaje.
Осторожно!
При проведении описанных процедур может возникнуть необходимость
демонтировать или заменить детали.
Для обеспечения надлежащих зазоров и вывода тока утечки, соблюдайте
все инструкции по монтажу.
3
2
ON
1
Trip
Z 2
Removal of XKS Screw termination Connectors
from NZM2.
5 mm
Removal of XKS Screw termination Connectors
as shown in the diagrams will enable mounting of XKC pressure Clamp Connector kits.
1/3
4
5 6
3
2
ON
7
1
Trip
8
2 x M4 x 85/20
f 35 – 185 mm
f AWG 2 – 350 kcmil
10
F 25 mm
9
f AWG 4
ON
22
1 x 4 – 185 mm
2 x 4 – 70 mm
1 x AWG 12 – 350 kcmil
UL/CSA = Cu only, Ampacity per 75° C Table.
2
2
2
F 15
f 2 x 9 x 0.8 mm
22
18
F
Nm lb-in
14 > 10 mm
5 F 10 mm
2
1
ON
5 mm
2
, > AWG 8 123 > AWG 8
2
, F AWG 8 44 F AWG 8
2
09/05 AWA1230-1917
1
ON
ON
On larger cable cross-sections, clamp can be removed and re-inserted as shown to better facilitate wiring.
2/3
ON
Nm lb-in
2
14 > 10 mm
, > AWG 8 123 > AWG 8
2
5 mm