![](/html/89/8905/89053167ee760a665d814a33b160cca1a8b55c75833325b155ed894025657d9e/bg1.png)
MobiApps m200 Installation Guide
May 2009
m200 Installation Guide 1
![](/html/89/8905/89053167ee760a665d814a33b160cca1a8b55c75833325b155ed894025657d9e/bg2.png)
List of Equipment
This section lists the equipment required to install the m200. The complete equipment kit includes the following:
• m200 Dual-Mode Telematics Platform
• Mounting bracket
• Power cable
• GPS antenna
• GSM antenna
• Satellite antenna
No Serviceable Parts
Note: The m200 contains no user serviceable parts and therefore must be returned to the manufacturer
for service. The SIM card must be supplied to MobiApps during manufacturing. Opening the case will
void the warranty. The only part with a finite life is the internal lead battery, with an expected life of 3
years.
m200 Placement Rules and Recommendations
Care must be taken to ensure that the supplied cable can reach from the m200 to the power supply and the
ignition switch (if used).
Device Image Description
The m200 contains the satellite data
m200
Mounting Bracket
Power Cable
communications transceiver, GPS receiver,
GSM transceiver, application processor and
internal backup battery.
The mounting bracket holds the m200 to a
flat mounting surface.
The power cable is 3 feet (90 cm) in length.
At one end, the cable connects to the
ignition switch and the main power source.
The terminal end connects to the 20-pin
connector on the m200 unit.
m200 Installation Guide 2