1
Wire Bead Roll
User Instructions
#201-062-WBS 1/16β
#201-125-WBS 1/8β
1-800-467-2464
STEP #1
Install Hem #1 Roll Set #201-059-S
(Male roll on top)
To create ΒΌβ long 90-degree flange in metal edge
Push metal edge against edge-guide stop in female roll to create 90-degree
flange.
Hold metal at same angle as long leg of female roll
to prevent placing any unwanted marking on metal.
\\Mbserver01\Engineering\Product\Product Documentation\201 Rolls\1-8 Wire Bead Instructionsl.doc Rev. 6.00 4/8/05 JEP
2
STEP #2
Install J-Channel Roll Set #201-081-J
(Male roll on top)
Hold metal as vertical as possible to upper male roll (see above)
Push edge of 90-degree flange against edge-guide stop in female roll
as metal travels through roll pinch point to form J-Channel
but leave flat outside surface
A second pass through the J-Channel rolls may help to create
the good shape required
\\Mbserver01\Engineering\Product\Product Documentation\201 Rolls\1-8 Wire Bead Instructionsl.doc Rev. 6.00 4/8/05 JEP