Mira Sport 7.5, Mira Sport 9.8, J95B, Mira Sport 9.0, J95V Installation Manual

...
1
These instructions must be left with the user
Installation Guide
Mira Sport
7.5, 9.0 & 9.8 kW
2
If you experience any difculty with the installation or operation of your new Electric
CONTENTS
Introduction .............................................................................................3
Guarantee ............................................................................................3
Patents and Design Registration ..........................................................3
Important Safety Information .................................................................4
Pack Contents Checklist ........................................................................5
Wiring Diagram ........................................................................................ 6
Specications .......................................................................................... 7
Plumbing ..............................................................................................7
Electrical ............................................................................................... 7
Dimensions ...........................................................................................7
Installation Requirements ......................................................................8
Plumbing ..............................................................................................8
Electrical ............................................................................................. 10
Installation ............................................................................................. 11
Commissioning .....................................................................................13
User Instructions ................................................................................... 15
User Safety Information ........................................................................ 17
Fault Diagnosis ......................................................................................19
User Maintenance ..................................................................................23
Cleaning .............................................................................................23
De-scaling the Showerhead ...............................................................23
Servicing ................................................................................................24
Inlet Filter - Cleaning/Renewing .........................................................24
Spare Parts ............................................................................................25
Accessories ...........................................................................................27
Customer Service .................................................................................. 28
3
INTRODUCTION
Thank you for purchasing a quality Mira product. To enjoy the full potential of your new product, please take time to read this guide thoroughly. Having done so, keep it handy for future reference.
The Mira Sport is an electric shower with separate controls for power selection and
temperature/ow adjustment. A unique ow regulator stabilises temperature changes caused by water pressure uctuations. These can result from taps being turned on or off or toilets being ushed. Individual lights indicate "POWER" and "LOW FLOW".
Mira Sport models covered by this guide:
Product Model Number Colour
Mira Sport 7.5 J95A White/Chrome
Mira Sport 9.0 J95B/J95V White/Chrome & Chrome
Mira Sport 9.8 J95C/J95W White/Chrome & Chrome
Guarantee
For domestic installations, Mira Showers guarantee the Mira Sport against any defect in materials or workmanship for a period of 2 years from the date of purchase
(shower ttings for one year).
For non-domestic installations, Mira Showers guarantee the Mira Sport against any defect in materials or workmanship for a period of 1 years from the date of purchase.
For Terms and Conditions refer to the back cover of this guide.
Patents and Design Registration
Design Registration: 000373543-002-004
Patents: GB: 2 341 667
Ireland: 82835
Patent Applications: UK: 2 427 460, 2 432 201
Ireland: 2006/0462, 2006/0818
4
IMPORTANT SAFETY INFORMATION
WARNING - This shower can deliver scalding temperatures if not operated, installed or maintained in accordance with the instructions, warnings and cautions contained in this guide and on or inside the appliance.
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR INJURY:
1. Installation of this shower must be carried out in accordance with these
instructions by qualied, competent personnel.
2. Isolate the electrical and water supplies before commencing installation. The electricity must be isolated at the consumer unit and the appropriate circuit fuse removed, if applicable. Mains connections are exposed when the cover is removed.
3. DO NOT install the shower in areas with high humidity and temperature (i.e.
steam rooms and saunas).
4. DO NOT install the shower where it may be exposed to freezing conditions.
Ensure that any pipework that could become frozen is properly insulated.
5. DO NOT switch the shower on if there is a possibility that the water in the shower is frozen.
6. DO NOT switch the shower on if water starts leaking from the shower case. Isolate the electrical supply to the shower immediately.
7. DO NOT connect the outlet of the shower to any tap, control valve, trigger
handset or showerhead other than those specied for use with this shower.
Only Kohler Mira recommended accessories should be used.
8. The water supplies to this product must be isolated if the product is not to be used for a long period of time. If the product or pipework is at risk of freezing during this period they should also be drained of water.
9. DO NOT perform any unspecied modications to the shower or it’s accessories. When servicing only use Genuine Kohler Mira replacement parts.
10. If the shower is dismantled during installation or servicing then upon completion the product must be inspected to ensure all electrical connections are tight and that there are no leaks.
11. Read all installation instructions before installing this shower.
12. Upon completion of the installation, make sure that the user is familiar with the operation of the shower, and leave this guide with the owner.
5
PACK CONTENTS CHECKLIST
Tick the appropriate boxes to familiarize yourself with the part names and to
conrm that the parts are included.
q 3 x Wall Plugs
q 1 x Compression Nut
q 3 x Fixing Screws
q 2 x Case Inserts
q 1 x Olive
q 1 x Mira Sport 7.5, 9.0 or 9.8
Documentation
q 1 x Installation Template q 1 x Installer Checklist q 1 x Guarantee Card
6
BROWN
BROWN
BROWN
BROWN
BLACK
BLACK
BLACK
BLUE
BLUE
GREEN
GREEN
BLACK
RED
RED
RED
Thermal Cutout Dual Disc
L
Solenoid Valve
Pressure/Power Selector Switch
Low Flow Neon
Power On Neon
N
E
Tank Connection
Inlet Connector
Internal Wiring Diagram
Load
WIRING DIAGRAM
START/STOP
7
SPECIFICATIONS
European Conformity Information
Mira Sport range of showers complies with the following European directives: 2006/95/EC Low Voltage Directive, 2004/108/EC EMC Directive.
Mira Sport range of showers are high power appliance and are subject to conditional connection. If the main electrical supply fuse is rated less than 80
Amps, the local electricity supply company must be contacted to conrm if the
electrical supply is adequate.
Mira Sport range of showers complies with the requirements of the UK’s water
regulations.
Dimensions
Height 340 mm
Width 204 mm
Depth 80 mm
Electrical
Variant
Sport 7.5 Sport 9.0 Sport 9.8
Nominal Power at 230 V ac 6.9 kW 8.3 kW 9.0 kW
Nominal Power at 240 V ac 7.5 kW 9.0 kW 9.8 kW
Recommended MCB Rating 40 A 40 A 45 A
Maximum Supply Cable Size 16 mm²
Recommended RCD Rating 30 mA tripping current
Recommended Isolator Switch 45 A double-pole with 3 mm contact separation
Appliance Sealing Rating IP X4 - Suitable for installation in Zone 1
Maximum Ambient Temperature 30°C
Minimum Ambient Temperature 2°C
Plumbing
Variant
Sport 7.5 Sport 9.0 Sport 9.8
Minimum Dynamic Pressure 70 kPa
(0.7 bar)
70 kPa
(0.7 bar)
70 kPa
(0.7 bar)
Maximum Static Pressure 1000 kPa (10 bar)
Minimum Static Pressure 20 kPa (0.2 bar)
Maximum Inlet Temperature 30°C
Minimum Inlet Temperature 2°C
Inlet Connection 1/2” BSP Male / 15 mm Compression Fitting
Maximum Water Hardness 200 ppm CaCO
3
Outlet Connection 1/2” BSP Male
8
Please read the Important Safety Information and specications sections at
the front of this guide, and the requirements detailed in this section before installing the shower.
WARNING - TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR INJURY:
Plumbing
1. The plumbing installation must comply with all national or local water regulations and all relevant building regulations, or any particular regulation or practice
specied by the local water supply company.
2. Do not install the product in a position in which service access is limited.
3. Decide on a suitable position for the shower (minimum distance of 200 mm from
the ceiling to allow for cover t and removal).
4. The position of the shower and shower ttings must provide a minimum gap of 25 mm between the showerhead and the spill over level of any bath, shower tray or basin and a minimum gap of 30 mm between the showerhead and the spill over level of any toilet, bidet or other appliance with a Fluid Category 5
backow risk (see diagram on page 9).
5. The shower is suitable for installation within the shower area and is tted with a pressure relief valve. It must be positioned over a water catchment area with the controls at a convenient height for the user.
6. The shower must be tted to a waterproof at and even wall surface.
7. DO NOT t the shower to the wall and tile up to the case.
8. DO NOT seal the gap between the shower and the wall surface.
9. The showerhead should be positioned so that it discharges down the centre line of the bath or across the opening of a shower cubicle.
10. The showerhead must be directed away from the shower unit, during normal use the showerhead must not spray directly on to the shower unit.
11. DO NOT apply excessive force to plumbing connections; always provide
mechanical support when making plumbing connections. Any soldered joints
should be made before connecting the shower.
12. This shower is not designed to be plumbed directly from the rear. For rear-entry supply, add an elbow to the supply pipe and connect as a rising or a falling supply.
13. If pipework and/or electrical cables enter the shower from the rear through a hole in the wall provision must be made to prevent water ingress back into the wall structure.
14. Only use the inlet connector supplied with the shower. DO NOT use any other
type of tting.
INSTALLATION REQUIREMENTS
9
Hose Retaining Ring tted and shower ttings xed at a suitable height preventing dirty water backow.
Note! There will be occasions when the hose retaining ring will not provide a suitable solution for Fluid Category 3 installations, in these instances an outlet double
checkvalve must be tted, this will increase the required supply pressure typically by 10kPa (0.1 bar). Double checkvalves tted in the inlet supply to the appliance
cause a pressure build up, which could exceed the maximum static inlet pressure
for the appliance and must not be tted. For Fluid category 5 double checkvalves
are not suitable.
Zone of
Backow Risk
30 mm
Minimum
Toilet or Bidet
FC5
Hand Basin
FC3
Bath or Shower
Tray FC3
Electric
Shower
25 mm
Minimum
25 mm Minimum
15. A full bore/non restrictive servicing valve must be tted in a readily accessible
position adjacent to the shower to facilitate maintenance of the shower.
DO NOT use a valve with a loose washer plate (jumper) as this can lead to a
build up of static pressure.
16. A water treatment device should be installed where the water hardness may
exceed 200 ppm. Malfunctions caused by excessive limescale formation are
not covered by this shower’s guarantee (see back page for details).
17. The installation must not cause the hose to be sharply kinked during normal
use.
18. DO NOT perform the electrical installation until the plumbing has been
completed and checked for leaks.
Loading...
+ 19 hidden pages