Mira Azora Installation Manual

1
These instructions are to be left with the user
Installation and User Guide
ELECTRIC SHOWER
MIRA AZORA
2
If you experience any difculty with the installation or operation of your new Electric Shower, please refer to ‘Fault Diagnosis’, before contacting Kohler Mira Ltd. Our telephone and fax numbers can be found in the back of this guide.
CONTENTS
Patents and Design Registration ........................................................... 2
Introduction .............................................................................................3
Guarantee .................................................................................................3
Important Safety Information .................................................................4
Pack Contents Checklist ........................................................................6
Specications .......................................................................................... 7
1. Plumbing .......................................................................................... 7
2. Electrical ...........................................................................................7
3. Standards and Approvals ................................................................. 7
Installation Requirements ......................................................................7
1. Plumbing .......................................................................................... 7
2. Electrical ...........................................................................................9
Installation .............................................................................................10
Installation of Mira Azora ....................................................................10
Commissioning .....................................................................................14
User Instructions ................................................................................... 16
Fault Diagnosis ......................................................................................20
Maintenance ...........................................................................................22
Dimensions ............................................................................................ 24
Spare Parts ............................................................................................25
Wiring Diagram ...................................................................................... 27
Customer Service .................................................................................. 28
PATENTS AND DESIGN REGISTRATION
Design Registration: 000578463-001-002
Patents: GB: 2 341 667, 2 404 000, 2 428 286
Ireland: 82835, 85128, 85163
Patent Applications: GB: 2 427 460
Ireland: 2006/0462
3
INTRODUCTION
Thank you for purchasing a quality Mira product. To enjoy the full potential of your new product, please take time to read this guide thoroughly. Having done so, keep it handy for future reference.
The Mira Azora is a thermostatic electric shower with separate controls for power selection and temperature/ow adjustment. A unique thermostatic valve stabilises temperature changes caused by water pressure uctuations. These can result from taps being turned on or off, or a toilet being ushed. An individual light indicates “START/STOP”.
The Mira Azora comes complete with a set of Mira Energise Shower Fittings.
Mira Azora 9.8 kW
A 9.8 kW 240 V AC (9.0 kW 230 V AC) heater with Mira Energise adjustable spray handset with four different spray actions (start, soothe, force and eco*). Supplied complete with exible hose, clamp bracket assembly, slide bar, supports, hose retaining ring and soap dish. Available in the following nishes: frosted glass, blue glass, grape glass, white ock, stripes, ag, stones and dots.
* The eco setting reduces the water ow to give economical use of water, whilst
still giving an adequate shower performance. This setting performs best with most gravity, pumped, and mains pressure unvented systems. On electric showers and some combination boiler systems the economy setting will have no effect, and will give the same spray action as the start setting.
Recommended Usage
Domestic
ü
Light Commercial
ü
Heavy Commercial
û
Healthcare
û
GUARANTEE
For domestic installations, Mira Showers guarantee the Mira Azora 9.8kW against any defect in materials or workmanship for a period of two years from the date of purchase (shower ttings for one year).
For non-domestic installations, Mira Showers guarantee the Mira Azora 9.8kW against any defect in materials or workmanship for a period of one year from the date of purchase.
For terms and conditions refer to section “Customer Services”.
4
IMPORTANT SAFETY INFORMATION
Installation must be carried out in accordance with these instructions, and must be conducted by designated, qualied and competent personnel.
Warnings!
Follow all warnings, cautions and instructions contained in this guide, and on or inside the appliance.
1 Products manufactured by us are safe and risk-free, provided that they are
installed, used and maintained in good working order, in accordance with our instructions and recommendations.
2. Isolate the electrical and water supplies before commencing installation. The electricity must be turned off at the mains and the appropriate circuit fuse removed, if applicable.
3. Mains connections are exposed when the cover is removed.
4. Refer to the wiring diagram before making any electrical connections (refer to
the wiring diagram at the back of this guide).
5. Make sure that any pipework that could become frozen is properly insulated.
6. Having completed the installation, make sure that the user is familiar with the
operation of the appliance.
7. Make sure that this guide is left with the user.
8. DO NOT commission this appliance if water leaks from the unit or the heater
tank pressure relief valve.
9. DO NOT t any form of outlet control (e.g. Trigger handset) as the outlet acts as a vent for the tank body. Only Mira recommended outlet ttings should be used.
10. Make sure all electrical connections are tight, to prevent overheating.
11. The water supplies to this product must be isolated if the product is not to be
used for a long period of time. If the product or pipework is at risk of freezing during this period they should also be drained of water.
12. Warning! DO NOT operate this appliance if it is frozen. Allow the appliance to thaw before using. The shower unit must not be tted where it may be exposed to freezing conditions.
13. This product is not suitable for areas with high humidity (i.e steam rooms). Please consult your installer.
14. THIS APPLIANCE MUST BE EARTHED. MAKE SURE SUPPLEMENTARY BONDING
COMPLIES WITH THE “REQUIREMENTS FOR ELECTRICAL INSTALLATIONS”.
The installation must be in accordance with the current edition of ’The Plugs
and Sockets etc. (Safety) Regulations’ in force at the time of installation, this appliance is intended to be permanently connected to the xed electrical wiring of the mains system.
15. If the wiring layout is changed or amended, the product functionally and safety may be affected.
5
Caution!
1. Read all of these instructions and retain this guide for later use.
2. The electrical installation must comply to “BS 7671 - Requirements for Electrical
Installations”, commonly referred to as the IEE Wiring Regulations - Part 7, or any particular regulations and practices, specied by the local electricity supply company.
3. The plumbing installation must comply with the requirements of UK Water Regulations/Bye-laws (Scotland), Building Regulations or any particular regulations and practices, specied by the local water company or water undertakers.
4. Make sure that you fully understand how to operate this shower and make sure that it is properly maintained in accordance with the instructions given in this manual.
5. Anyone who may have difculty understanding or operating the controls of any shower should be attended whilst showering. Particular consideration should be given to:
(a) The young. (b) The elderly. (c) The inrm. (d) The disabled. (e) Anyone who suffers from a medical condition that can result in
temporary incapacity (e.g. epilepsy or blackouts).
(f) Anyone inexperienced in the correct operation of the controls. (g) Children should be supervised to ensure that they do not play with the
appliance.
6. Sunburn or skin conditions can increase your sensitivity to hot water. Make sure that you set the shower to a cooler temperature.
7. If any of the following conditions occur, isolate the electricity and water supplies and refer to ”To contact us”, on the back page of this guide.
(a) If the cover is not correctly tted and water has entered the appliance
case.
(b) If the case is damaged. (c) If the appliance begins to make an odd noise, smell or smoke.
16. If pipework and/or electical cables enter the shower from the rear through a
hole in the wall . Provision must be made to prevent water ingress back into the wall structure.
17. If the shower is dismantled during installation or servicing then upon completion the product must be inspected to ensure there are no leaks
18. DO NOT Position the handset to spray water directly on to the appliance. Eg.When cleaning shower control.
6
Mira Azora
PACK CONTENTS CHECKLIST
Tick the appropriate boxes to familiarise yourself with the part names and to conrm that the parts are included.
3 x Wall Plugs
3 x Fixing Screws
Documentation
1 x Installation Template 1 x Installer Checklist
1 x Guarantee Card
1 x Olive
1 x Compression Nut
1 x Mira Azora
8. When this appliance has reached the end of its serviceable life, it should be disposed of in a safe manner, in accordance with current local authority recycling, or waste disposal policy.
(d) If the appliance shows signs of a distinct change in performance,
indicating a need for maintenance.
(e) DO NOT operate this appliance if water leaks from this appliance.
7
SPECIFICATIONS
1. Plumbing
Minimum maintained inlet pressure 70 kPa (0.7 bar).
100 kPa (1.0 bar) recommended for satisfactory operation.
Maximum static inlet pressure 1000 kPa (10 bar).
Minimum static pressure 20 kPa (0.2 bar) to keep the inlet valve closed.
2. Electrical
The Mira Azora 9.8 kW requires a 45 Amp fuse.
The terminal block will accept cable up to 16 mm
2
.
The Mira Azora is suitable for installation in Zone 1 and is rated IPX4.
3. Standards and Approvals
The Mira Azora complies with all relevant directives for CE marking.
INSTALLATION REQUIREMENTS
1. Plumbing
The appliance is designed to operate with a minimum maintained inlet pressure
of 0.7 bar up to a maximum static inlet pressure of 10 bar.
When installed in very hard water areas (above 200 ppm temporary hardness)
your installer may advise the installation of a water treatment device, to reduce the effects of limescale formation. Your local water company will be able to advise the hardness of water in your area.
It is recommended that a non-restrictive (free owing) isolating valve is tted in
the cold water supply pipe to allow the complete maintenance of the appliance. Do not use a valve with a loose washer plate (jumper) as this can lead to a build up of static pressures.
The appliance is suitable for installation within the shower area. It is tted with
a pressure relief device and must be positioned over a water catchment area with the controls at a convenient height for all users.
The appliance must be tted on to a nished at and even wall surface (this
wall surface should be tiled or waterproofed). DO NOT t the appliance to the wall and tile up to the case. For safety requirements, an air gap must be left behind the appliance.
8
Avoid layouts where the shower hose will be sharply kinked. This may reduce
the life of the hose.
A Hose Retaining Ring is supplied to prevent the handset from dropping below
the spill-over level of the bath or shower tray, which could lead to contamination from back-siphoning. The supplied Hose Retaining Ring should meet the majority of user requirements for shower installations with exible outlet ttings. However, there will be occasions when it will not provide a suitable solution. In these instances an outlet double checkvalve, e.g. a Mira DCV-H, MUST be tted. This will increase the required supply pressure typically by 10 kPa (0.1 bar). Refer to section “Accessories”.
Supply pipework MUST be ushed to clear debris before connecting to the
appliance.
To avoid damage to the case when soldered ttings are used, pre-solder
the pipework and ttings before connecting them to the inlet connector assembly.
To ensure the case and other components are not put under strain during
installation always provide mechanical support when making plumbing connections. Upon completion of the installation ensure connections and back case are not under any stress due to misaligned pipework or electrical cables.
Isolating Valve
Avoid Sharp Kinks
Convenient height for all the family
25 mm Min
Bath
Shower Tray
Fixed to nished wall surface
Minimum 200 mm from ceiling
Hose Retaining Ring
9
2. Electrical
In a domestic installation, the rating of the electricity supplier’s fuse and the
consumer unit must be adequate for the additional demand. All Mira electric showers are high power units, it is essential to contact your electricity supplier to ensure that the supply is adequate for the product.
Voltage drop due to local heavy demand will reduce the shower’s
performance.
The appliance MUST BE EARTHED by connecting the supply-cable earth
conductor to the earth terminal.
• SUPPLEMENTARY BONDING: Within the bathroom or shower room, all
accessible conductive parts of electrical equipment and extraneous conductive parts (metal parts) that are likely to introduce earth potential, must be electrically bonded to earth using a minimum cable size of 4.0 mm² if the cable is not mechanically protected, (2.5 mm² if mechanically protected).
The minimum cable size (cross-sectional area) required should be in
accordance with BS 7671.
As a guide only, and in accordance with BS 7671 we recommend close circuit
protection: i.e. 9.8 kW = 45 Amp
A 30 mA Residual Current Device (RCD) MUST be included in the electrical
circuit. This may be part of the consumer unit or a separate unit.
A separate, permanently connected supply must be taken from the consumer
unit to the appliance through a double-pole switch, which has at least 3 mm of contact separation. The switch can be a ceiling mounted pullcord type within the shower room, or a wall mounted switch in an adjacent room.
• DO NOT twist the individual cable cores of either the live or neutral conductors,
as this will prevent them from entering the terminal block.
• DO NOT exert strain on the terminal block. Ensure that the electrical
connections are tightly screwed down.
• DO NOT turn-on the electrical supply until the plumbing has been
completed.
The appliance is tted with a brass inlet compression assembly for connecting
to a 15 mm supply pipe from the top, bottom or back. Double checkvalves, if tted in the inlet supply to the appliance, can cause a pressure build-up, which could exceed the maximum static inlet pressure and damage the appliance.
Loading...
+ 19 hidden pages