
FrameMaker Ver.5.5E(PC) EP1054/EP1085/EP2030 MAINTENANCE SCHEDULE
98.09.25
EP1054/EP1085/EP2030 MAINTENANCE SCHEDULE
This Maintenance Schedule is intended to be used as reference information for establishing effective field service activities. To k e ep the copier in as optimum a condition as possible, it is recommended that the maintenance jobs described in
this schedule be carried out.
It should be noted, however, that frequency of maintenance jobs determined by the number of copies is simply a guideline. Therefore, service management personnel can revise or amend this schedule by taking into account their own individual field experiences. We feel that this will ensure more effective copier maintenance for your customers.
* The time interval (the number of copiers produced) at which each component is cleaned or replaced is determined
based on the average service life of the component. More or less frequent cleaning or replacement will be necessary
depending on the actual image quality and paper passage performance.
NOTE: All information in this Maintenance Schedule is subject to change without prior notice.
C : Cleaning R : Replacement Unit: 1000 Copies

FrameMaker Ver.5.5E(PC) EP1054/EP1085/EP2030 MAINTENANCE SCHEDULE
98.09.25
PM Parts List
●PAPER TAKE-UP SECTION
●OPTICAL SECTION K=1,000 copies
PM Parts
Paper Take-Up Roll
Multi Bypa ss Table ∗
Paper Take-Up Roll
Feed Roll
Separator Roll
1st Mirror
2nd Mirro r
3rd Mirror
4th Mirror
Lens
Cooling Fan Filter
Slider
1 Inch Area: 4
∗
Metric Area: 5
: 15/18 cpm copier: OPTION.
∗
Maintenance Cycle ( 60K)
Clean Replace
❍
❍
❍
❍
❍
❍
❍
❍
❍
❍
❍
300 1151-3001-01 ∗1D-11
–1D-15
–1D-15
–1D-15
–1D-30
–1D-30
–1D-30
–1D-30
–1D-30
–1D-30
–1
Parts No. QTY Disassembly Page

FrameMaker Ver.5.5E(PC) EP1054/EP1085/EP2030 MAINTENANCE SCHEDULE
98.09.25
●IMAGEING UNIT
PM Parts
Starter 180 1
PC Drum 60 1 D-31
Toner Scattering Preventi on Plate
Cleaning Blade 60 1139-5711-17 1 D-32
PC Drum Paper Separator Fingers
Ds Position Collar (Front)
Ds Position Collar (Rear)
Paper Dust Remover
To ner Antispill Mylar – 1 D-33
Upper Pre-Image Transfer Guid e Pl at e
Magnet Roller Lower Fi lt er
Maintenance Cycle ( 60K)
Clean Replace
❍
❍
❍
❍
❍
❍
❍
300 1174-5222-01 1 D-31
–2D-33
300 1174-5204-02 1 D-33
300 1174-5206-02 1 D-33
120 1139-3253-01 1 D-33
–1D-34
–1D-34
Parts No. QTY Disassembly Page

FrameMaker Ver.5.5E(PC) EP1054/EP1085/EP2030 MAINTENANCE SCHEDULE
98.09.25
●DRUM CHARGE/IMAGE TRANSFER CORONAS
PM Parts
PC Drum Charge Corona Housing
PC Drum Charge Corona Grid Mesh
PC Drum Charge Corona Comb Electrode
Image Transfer/Paper Separator Corona Wire
Image Transfer /Pape r Separator Cor ona
Housing
Lower Pre-Image Transfer Guide Plate
Suction Belt
Ozone Filter – 60 1151-4509-01 1 D-39
Maintenance Cycle ( 60K)
Clean Replace
❍
❍
❍
❍
❍
❍
❍
–1D-37
–1D-38
300 1139-4253-02 1 D-38
120 1139-0756-01 2 D-38
–1D-39
–1D-39
–4D-13
Parts No. QTY Disassembly Page

FrameMaker Ver.5.5E(PC) EP1054/EP1085/EP2030 MAINTENANCE SCHEDULE
98.09.25
●FUSING UNIT
PM Parts
Pre-Fusing Guide Plate
Fusing Thermistor
Fusing Thermostat
Upper Fusing Roller
Lower Fusin g Roller
Upper Separator Finger
Lower Sepa ra t or Finger
Maintenance Cycle ( 60K)
Clean Replace
❍
❍
❍
❍
❍
❍
❍
–1D-41
300 9372-2610-11 1 D-43
–1
300 1174-5521-01 1 D-41
300 1174-5522-01 1 D-43
300 1054-4753-01 4 D-43
–5D-44
Parts No. QTY Disassembly Page

FrameMaker Ver.5.5E(PC) EP1054/EP1085/EP2030 MAINTENANCE SCHEDULE
98.09.25
Copyright
1998 MINOLTA CO., LTD.
Printed in Japan
Use of this manual should
be strictly supervised to
avoi d disclosure of
confidential information.
MINOLTA CO., LTD.
1174-7993-11 98113500
18605