FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR EP1054/EP1085/EP2030
98.06.08
OPTIONS MAINTENANCE SCHEDULE FOR EP1054/EP1085/EP2030
This Maintenance Sch edu l e is inte nded to be used as reference information for establishing effective field service activities. To keep the copiers in as optimum a condition as possible, it is recommended that the maintenance jobs described in
this schedule be carried out.
It should be noted, however, that frequency of maintenance jobs determined by the number of copies is sim pl y a guide
line. Therefore, service managem ent personnel can revise or amend thi s sc hedule by taking into account their own ind ividual field experiences. We feel that this will ensure more effective copier maintenance for your customers.
* The maintenance cycl e num bers given below represent the readings on the PM Counter of the copie r.
C : Cleaning R : Replacement Unit : 1000 Copies
All information contained in this manual is subject to change.
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR EP1054/EP1085/EP2030
98.06.08
PF-112
PM Parts
Paper Take-Up Roll 60/75 180 4425-3009-01 1 D-8
Feed Roll 60/75 180 1052-5224-01 1 D-8
Separator Roll Assy. 60/75 180 4479-0152-01 1 D-8
Vertical Transport Roll er 1
(Drive)
Vertical Transport Roll er 1
(Driven)
Vertical Transport Roll er 2
(Drive)
Vertical Transport Roll er 2
(Driven)
NOTE: K = 1,000 copies
* Cleaning: 60K for 23 cpm copier.
75K for 30/31 cpm copier.
Maintenance Cycle (K)
C* R
60/75 — — 1 D-8
60/75 — — 6 D-8
60/75 — — 1 D-8
60/75 — — 6 D-8
Parts No. QTY Reference Page