Midor M6-IK-00011 Schematics

Q:\25655-411 - MIDOR Revamp 2015\David Markup Files\Final Mark Ups for Ali Check\0020-08 Details and Instrumentation of Coke Drums Valves and Emergency Isolation Valves.pdf
BHTS NOTES: GENERAL:
1. ALL EXISTING PIPING/EQUIPMENT ARE NOT IN BHTS SCOPE EXCEPT AS REDLINED/CLOUDED.
2. MARKUP LEGEND: ADD/MODIFY DEMOLISH/ABANDON
FOR VALVE MOV­FOR VALVE MOV­FOR VALVE MOV­FOR VALVE MOV-
FOR VALVE MOV­FOR VALVE MOV­FOR VALVE MOV­FOR VALVE MOV-
BECHTEL CONFIDENTIAL. (C)2015 BECHTEL HYDROCARBON TECHNOLOGY SOLUTIONS, INC. (BECHTEL). CONTAINS INFORMATION CONFIDENTAIL AND/OR PROPRIETARY TO BECHTEL AND ITS AFFILIATED COMPANIES THAT IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN ANY FORM BY ANY NON-BECHTEL PARTY WITHOUT BECHTEL'S PRIOR WRITTEN PERMISSION. ALL RIGHTS RESERVED.
SECURITY LEVEL 2. ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE UNCONTROLLED AND MAY BECOME OUTDATED. REFER TO ELECTRONIC DOCUMENT MANAGEMENT SYSTEM FOR THE CURRENT REVISIONS.
A
REV
2/10/15
DATE
Bechtel Hydrocarbon Technology Solutions, Inc. F-13450
ISSUED FOR
APPROVAL
BHTS DRAWING NO. M6-IK-00011
JGF JDW
PREP
CKD
JGF
APPR
1 of 1
Loading...