Midea FLOOR TYPE, CEILING TYPE Installation Manual

INSTALLATION MANUAL
For correct installation, read this manual before starting installation. This manual may be subject to change without notice for purpose of improvement.
CEILING AND FLOOR TYPE
AIR CONDITIONER
CONTENT
Installation place
Indoor unit installation..........................................................................4
Outdoor unit installation......................................................................8
Install the connecting pipe...................................................................9
Connect the drain pipe
......................................................................................1
Accessories..................................................................................................3
...........................................................................11
Wiring.............................................................................................................12
Test operation...........................................................................................16
There is enough room for installation and maintenance. The ceiling is horizontal, and its structure can endure the weight of the indoor unit. The air outlet and the air inlet are not impeded, and the influence of external air is the least. The air flow can reach throughout the room. The connecting pipe and drainpipe could be extracted out easily. There is no direct radiation from heaters
1
To install properly, please read this manual at first. The air conditioner must be installed by qualified persons. When installing the indoor unit or its tubing, please follow this manual as strictly as possible. When all the installation work is finished, please turn on the power only after a thorough check. No further announcement if there is any change of this manual caused by product improv­ement.
Note: The installor should illustrate to users how to correctly use and maintain the air-condi­ tioner, as well as remind users to carefully read and keep both Installation Manual and Owner's Manual well.
INSTALLATION PRECAUTION
The Indoor Unit
The Outdoor Unit
INSTALLATION PLACE
Location in the following places may cause malfunction of the machine. (If unavoidable, please consult your local dealer.)
a. There exists petrolatum. b. There is salty air surrounding(near the coast). c. There is caustic gas(the sulfide, for example) existing in the air (near a hot spring). d. The Volt vibrates violently(in the factories).
Cautions
There is enough room for installation and maintenance. The air outlet and the air inlet are not impeded, and can not be reached by strong wind. The place is dry and ventilative. The support is flat and horizontal and can stand the weight of the outdoor unit. And no additional noise or vibration. Your neighborhood will not feel uncomfortable with the noise or expelled air. There is no leakage of combustible gas. It is easy to install the connecting pipe or cables.
2
Notes Before Installation
1. Select the correct carry-in path.
2. Move this unit as originally packaged as possible.
3. If the air conditioner is installed on a metal part of the building, it must be electrically insulated according to the relevant standards to electrical appliances.
e. In buses or cabinets. f. In kitchen where it is full of oil gas. g. There is strong electromagnetic wave existing. h. There are inflammable materials or gas. i. There is acid or alkaline liquid evaporating. j. Other special conditions.
NOTE:
Remark per EMC Directive 89/336/EEC For to prevent flicker impressions during the start of the compressor (technical process), following installation conditions apply.
1. The power connection for the air conditioner has to be done at the main power distribution. The distribution has to be of a low impedance, normally the required impedance reaches a 32A fusing point.at
2. No other equipment has to be connected with this power line.
3. For detailed installation acceptance, please refer to your contract with the power supplier restrictions do apply for products like washing machines, air conditioners or electrical if ovens.
4. For power details of the air conditioner, refer to the rating plate of the product.
5. For any question contact your local dealer.
1. Remote controller..................1
2. Frame...................................1
3. Mounting screw
(ST2.9x10-C-H).....................2
4. Alkaline dry batteries(AM4)
...............................................2
Remote controller & Its Frame
1
2
3
Remote controller
Remote controller holder
Mounting screw B ST2.9x10-C-H
Never throw or beat the controller. Before installation, operate the remote controller to determine its location in a reception range. Keep the remote controller at least 1m apart from the nearest TV set or stereo equipment. (It is necessary to prevent image disturbances or noise interferences.) Do not install the remote controller in a place exposed to direct sunlight or close to a heating source, such as a stove. Note that the positive and negative poles are in right positions when loading batteries.
Cautions on remote controller installation
1 1 2
Name of Accessories Owner's manual Installation manual
Q'ty
(This manual)
Qutline
Usage
ACCESSORIES
3
Hook
For wall mounting installation
Hanging arm
2
For ceiling installation
4
INDOOR UNIT INSTALLATION
Carry out the pipe and line operation in the ceiling after finishing the installation of the main body. While choosing where to start the operation, determine the direction of the pipes to be drawn out. Especially in case there is a ceiling, position the refrigerant pipes, drain pipes, indoor & outdoor lines to the connection places before hanging up the machine. The installation of hanging screw bolts.
Wooden construction
Installing f10 hanging screw bolts. (4 bolts)
Please refer to the following figure for the distance measurement between the screw bolts. Please install with f10 hanging screw bolts.
The handling to the ceiling varies from the constructions, consult the construction personn­els for the specific procedures.
1. The size of the ceiling to be handled ... ... do keep the ceiling flat. Consolidate the roof
beam for possible vibration.
2. Cut off the roof beam.
3. Strengthen the place cut off, and consolidate the roof beam.
Put the square timber traversely over the roof beam, then install the hanging screw bolts. (Refer to Chart 1)
Chart 1
Timber over the beam
Roof beam
Hanging screw bolts
Ceiling
New concrete bricks
(Blade shape insertion)
(Slide insertion)
Chart 2
Inlaying or embedding the screw bolts. (Refer to Chart 2)
Install and use directly the supporting angle steel. (Refer to chart 4)
For Original concrete bricks
Use embedding screw bold, crock and stick harness. (Refer to Chart 3)
Steel roof beam structre
Steel bar
Hanging screw bolt
Hanging bolts
Supporting angle steel
Embedding screw bolt
Chart 3
Chart 4
(Pipe hanging and embedding screw bolt)
Loading...
+ 13 hidden pages