Middle Atlantic PCD-4-4-45SC Instructions

installation instructions
PCD SERIES
PLASTIC CABLE DUCTS
MOUNTING DUAL CABLE DUCT BETWEEN 2 OR 4 POST RACKS
Using supplied hardware, install Brackets as shown (four places). See FIGURE B for appropriate orientation.
NOTE: Installed Brackets can be used for additional ganging (FIGURE C)
HARDWARE USED
10-32 X .5” SCREW - 4 QTY
(38RU/45RU)
BRACKET - 4 QTY
(51RU)
NOTE: Brackets are pre-installed on one side
Two Screws and Nuts per Bracket
EXISTING BRACKET ATTACHED TO RACK
(FIGURE B)
INSTALLED BRACKET
FOR GANGING TO
ANOTHER RACK
(FIGURE A)
Available sized Cable Ducts
(FIGURE C)
Front View with existing and installed brackets
I-00464 Rev -
MOUNTING SINGLE CABLE DUCT BETWEEN 2 OR 4 POST RACKS
Using supplied hardware, install Brackets as shown (four places). See FIGURE B for appropriate orientation.
NOTE: Installed Brackets can be used for additional ganging (FIGURE C)
HARDWARE USED
10-32 X .5” SCREW - 8 QTY
(38RU/45RU)
NOTE: Brackets are pre-installed on one side
BRACKET - 4 QTY
(51RU)
(FIGURE B)
Rear View showing
Two Screws and Nuts per Bracket
(FIGURE A)
Available sized Cable Ducts
EXISTING BRACKET ATTACHED TO RACK
Front View with existing and installed brackets
Page 2
INSTALLED BRACKET
FOR GANGING TO
ANOTHER RACK
(FIGURE C)
Loading...
+ 2 hidden pages