B.1Communications settings for the ticket printer ........................................................................103
Index ................................................................................................................................................105
iiMicro Motion® Marine Bunker Transfer Package
1Orientation and planning
Topics covered in this chapter:
•About this application manual
•Overview of the Micro Motion Certified Marine Bunker Measurement Solution
•System types and requirements for the Marine Bunker Transfer Package
•Additional documentation
1.1About this application manual
This application manual provides information required to install and operate the
Series 3000 transmitter with the Marine Bunker Transfer Package.
This application manual is designed for use with the following manual: Micro MotionSeries 3000 MVD Transmitters and Controllers: Configuration and Use Manual .
Orientation and planning
This application manual assumes that the transmitter display is used as the primary
configuration and operation method. However, ProLink II can be used for most
configuration and operation tasks. ProLink II also provides additional reporting and history
features. Use of ProLink II is documented in Chapter 6.
Important
Use this application manual as your main guide for installation, configuration, and operation. You
will be referred to other documentation for specific tasks and information.
1.2Overview of the Micro Motion Certified Marine
Bunker Measurement Solution
The Micro Motion Certified Marine Bunker Measurement Solution is a system that provides
a complete solution for the measurement of marine fuel delivery. The system monitors
aeration (entrained gas or entrained air), and supplies a bunker ticket with time and date,
total amount transferred, and other relevant data.
The Certified Marine Bunker Measurement Solution includes an approved sensor, a
Series 3000 transmitter, the Marine Bunker Transfer Package application running on the
transmitter, the appropriate components from the Marine Bunker Instruments offering,
and Micro Motion field services.
Application Manual 1
Orientation and planning
1.2.1Marine Bunker Transfer Package
The Marine Bunker Transfer Package is a software application installed on a Series 3000
transmitter. The Marine Bunker Transfer Package manages the specialized measurement,
monitoring, and ticket printing functions of the Certified Marine Bunker Measurement
Solution. For Profile and Profile/MID systems, the Marine Bunker Transfer Package also
handles communication with ProLink II.
Measurement
The Marine Bunker Transfer Package provides flow measurement data that complies with
OIML R117-1 and MID 2004/22/EC Annex MI-005. If the appropriate security hardware is
installed, the system has been accredited by a certified technician, and OIML/MIDapproved procedures are followed, the bunker ticket can be used as a legal
(Weights & Measures) document.
OIML R117-1 compliance
The Marine Bunker Transfer Package is designed to comply with measurement and
operational requirements established by OIML. After the initial startup and certification,
OIML R117-1 compliance includes four factors, or checks. For bunker transfer
measurement data to meet OIML R117-1 requirements, the bunker transfer must pass all
four checks.
The four checks are as follows:
•MMQ check: The size of the bunker transfer is above the threshold defined by
Minimum Measured Quantity (MMQ). MMQ is specified during system certification.
•Max Aeration check: The potential measurement error due to aeration (entrained
gas or entrained air), in combination with other sources of measurement error, is
within MID limits as defined in MID 2004/22/EC Annex MI-005. The Aeration Limit
diagnostic is used to monitor this factor.
•Power check: Power was continuous during the transfer (no power interrupt).
•Alarm check: No “bunker-critical” alarms have occurred since the last time a bunker
ticket was printed.
If the bunker transfer fails one or more of these checks, the bunker transfer measurement
data does not meet OIML R117-1 requirements and the ticket will show Overall OIML R117-1:Fail.
Note
Aeration Limit is always calculated and the four checks are always applied, whether or not an OIML/
MID-compliant system was purchased and installed. If the system is not OIML/MID-compliant, there
is no system performance traceability regardless of overall bunker pass/fail results.
Minimum Measured Quantity (MMQ)
Minimum Measured Quantity (MMQ) defines the minimum quantity of fuel in a bunker
transfer that is necessary to meet OIML/MID requirements.
2Micro Motion® Marine Bunker Transfer Package
Orientation and planning
MMQ is used to ensure that the bunker is sized appropriately for the sensor, and also to
ensure that various factors related to starting and stopping flow do not have a significant
effect on measurement accuracy. During initial system configuration, the service
technician calculates and configures a site-specific value for MMQ. This value is typically
not changed unless the piping is changed.
Tip
If you need to change the value of MMQ, contact Micro Motion customer service.
If the mass total of a bunker transfer meets or exceeds MMQ, the bunker transfer passes
the MMQ check.
Aeration and Aeration Limit
Aeration refers to entrained gas or entrained air in the process fluid. Aeration Limit is a realtime diagnostic that monitors the potential measurement error due to aeration and other
factors, and compares the real-time value to the maximum allowable measurement error
as defined by MID 2004/22/EC Annex MI-005. Aeration Limit is expressed as a percentage of
the MID limit. If the value of Aeration Limit at the end of the bunker transfer is below 100%,
the bunker measurement passes the Max Aeration check.
Aeration Limit is calculated continuously. During a bunker transfer, Aeration Limit can
increase, decrease, or even exceed 100%. The current value of Aeration Limit is reported as
follows:
•When the transfer total reaches 20% of Minimum Measured Quantity (MMQ), the
display reports:
Medium Aeration Limit: <On> or <Off>
High Aeration Limit: <On> or <Off>
The thresholds for medium and high aeration are determined by the HI PV values
assigned to Discrete Event 1 and Discrete Event 2. Default settings are 20 and 75
(i.e., 20% of the maximum allowable aeration and 75% of the maximum allowable
aeration).
•When the transfer total reaches 100% of MMQ, the display reports one of the
following:
-Aeration Limit Pass (xxx%)
-Aeration Limit Fail (xxx%)
where xxx is the current value of Aeration Limit.
The display is updated continuously, allowing the operator to take corrective action as
required.
Bunker-critical alarms
If a bunker-critical alarm occurs during a bunker transfer, the transfer fails the Alarm check
and the measurement cannot be used to meet OIML/MID requirements. Not all alarms are
bunker-critical.
ProLink II v2.94 or higher
(Micro Motion Part PLK****)
RS-485 connection to relay (converter
included)
System printer (customer-supplied)
Configuration toolLocal display
ProLink II v2.94 or higher
(Micro Motion Part PLK****)
Operator interfaceLocal display
ProLink II v2.94 or higher
(Micro Motion Part PLK****)
Additional devices (Marine Bunker Instruments)
Pressure instrumentIncluded automatically with order.
Temperature instrumentIncluded automatically with order.
Not available with the Model 3300 or
Model 3350 controller.
For marine approvals, Model 3700 required.
Printer Interface Component. Includes:
• NEMA-approved enclosure
• Factory-mounted relay and relay
power supply
Includes:
• MID-approved ticket printer
• MID-approved RS-485 to RS-232
signal converter
Used only to correct volume measurements to reference temperature, and
not required for MID approval.
8Micro Motion® Marine Bunker Transfer Package
Orientation and planning
System requirements: Profile/MID system (continued)Table 1-6:
RequirementComponentNotes
Level switchesOne or two, depending on sensor ori-
entation. Included automatically with
order.
Check valveIncluded automatically with order if
Vessel option is selected.
MID calibration for sensorMID Calibration order option (BB ap-
pended to sensor model code).
Micro Motion field services• MID-specific site survey
• MID-specific startup services (in-
clude system check and sealing)
1.4Additional documentation
Table 1-7:
Required and recommended documentation for the Certified Marine Bunker Measurement
Solution
DocumentUseNotes
Sensor installation manualBasic installation instructions for the
sensor
Quick Reference Guide for your
Series 3000 transmitter
Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration
and Use Manual
ProLink II manualGeneral installation, connection, and
Vendor documentation for auxiliary
devices
Basic installation instructions for the
transmitter
Additional installation information for
the transmitter
General configuration, operation, and
maintenance information
operation information
General installation, configuration,
and operation information
Provides information on configuring
and operating the Series 3000 transmitter that is not specific to the Marine Bunkering Transfer Package.
Provides information on installing
ProLink II and connecting to the transmitter. Also provides general information on using the ProLink II interface.
Application Manual 9
Orientation and planning
10Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
2Install the Series 3000 transmitter
with the Marine Bunker Transfer
Package
Topics covered in this chapter:
•System options and installation instructions
•Install the Basic system
•Install the Basic/MID system
•Install the Profile system
•Install the Profile/MID system
•Install ferrite beads in transmitter wiring (if required)
2.1System options and installation instructions
The Series 3000 transmitter with the Marine Bunker Transfer Package is available in four
system options. Follow the installation instructions for your system.
2.2Install the Basic system
This procedure provides installation instructions for a system that measures the bunker
delivery and prints bunker tickets. The bunker tickets are not OIML/MID-approved. If you
do not need to print bunker tickets, the ticket printer is not required.
Schematic of Basic systemFigure 2-1:
RS-485 to RS-232 signal converter
Ticket printer
Note
Model 3700 transmitter shown. If marine approvals are not required, the Model 3500 transmitter may also
be used.
Application Manual 11
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Prerequisites
Ensure that the sensor is correctly installed and ready for wiring.
Ensure that the auxiliary devices (level switches, pressure transmitter, and temperature
transmitter) are correctly installed and ready for wiring to the Series 3000 transmitter.
Have the following available:
•Documentation:
-Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and Use
Manual
-The Quick Reference Guide for your transmitter
-Vendor documentation for all components
•Cable:
-Power cable
-Standard twisted-pair shielded signal cable
Locate all components to meet the following requirements:
•The maximum distance between the sensor and the core processor is 60 feet
(20 meters). In a typical installation, the core processor is mounted directly on the
sensor.
•The maximum distance between the core processor and the transmitter is 1000 feet
(300 meters).
•The maximum length of an RS-485 connection is 3600 feet (1000 meters) at
9600 baud.
•The maximum length of an RS-232 connection is 15 feet (5 meters).
•The ticket printer and signal converter must be installed in a safe area.
Review power requirements for all components and ensure that you will be able to supply
enough power.
Important
For marine approvals (available only with the Model 3700 transmitter, and only if the Marine
Approvals option was ordered), additional requirements apply to the following:
•Wiring between the sensor and the transmitter
•Transmitter I/O wiring
•Transmitter power wiring
See Section 2.6 and incorporate the additional steps into your installation tasks.
Important
During installation, refer to the appropriate integrated wiring diagram. See Section A.1:
•For sensors mounted in a vertical pipe (Flag orientation), see page 84.
•For sensors mounted in a horizontal pipe (Tubes-down orientation), see page 86.
12Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Procedure
1.Follow the instructions in Micro Motion Series 3000 MVD Transmitters and Controllers:
Configuration and Use Manual and the appropriate Quick Reference Guide to perform
the following installation tasks:
a. Mount the transmitter.
b. Wire the transmitter to the sensor.
c. Wire the transmitter’s secondary mA output and frequency output (if they will be
used).
d. Wire power to the transmitter.
e. Ground the transmitter.
2.Wire the level switch (or switches) to Discrete Input 1 and to power.
When Discrete Input 1 is assigned to Start/Stop Totalizers (during configuration), it will
start totalizers when there is liquid in the pipeline, and stop totalizers when there is
no liquid in the pipeline.
3.(Optional) Set up an integrity detection loop and wire it to Discrete Input 2.
The integrity detection loop may be used to detect leaks, cable breakage, short
circuits, and so on. Any preferred method or device can be used.
4.Set up a HART loop that connects the primary mA output to the external pressure
transmitter and the external temperature transmitter.
Notes
• The temperature transmitter is used only to correct volume measurements to reference
temperature. It may not be required in your installation.
• The Field Communicator can be connected to this loop.
5.(Optional) Follow the instructions in Micro Motion Series 3000 MVD Transmitters andControllers: Configuration and Use Manual to wire Discrete Output 1 and Discrete
Output 2 to signal devices such as lights or horns.
Tip
When the Marine Bunker Transfer Package is installed, a special default configuration is
implemented for Discrete Output 1, Discrete Output 2, Discrete Event 1, and Discrete Event
2:
• Discrete Event 1 is activated if Aeration Limit reaches 20% (medium aeration).
• Discrete Event 2 is activated if Aeration Limit reaches 75% (high aeration).
• Discrete Output 1 is assigned to Discrete Event 1.
• Discrete Output 2 is assigned to Discrete Event 2.
If this default configuration is retained and Discrete Output 1 and Discrete Output 2 are wired
to signal devices, the signal devices will alert the operator if Aeration Limit reaches the 20% or
75% threshold. You can change the thresholds defined for medium and high aeration by
changing the HI PV values for Discrete Event 1 and Discrete Event 2.
Application Manual 13
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
6.(Optional) Follow the instructions in Micro Motion Series 3000 MVD Transmitters andControllers: Configuration and Use Manual and the appropriate Quick Reference Guide
to wire Discrete Output 3 as desired.
7.Install the ticket printer.
a. Connect the printer to power according to the instructions in the vendor
documentation.
b. Set the DIP switches on the printer as shown in the following table.
DIP switch settings for Epson TM-U295 printerTable 2-1:
DIP switchSettingPrinter communication parameters
1OFFBaud: 9600
2OFF
3OFF
4OFF
5ON
6ON
7OFF
8OFF
9OFF
10OFF
Parity: Even
Data bits: 8
Stop bits: 1
Characters per second: 32
Buffer size: 512
c. Attach the adapter to the signal converter.
An RS-485 to RS-232 signal converter and a DB9 to DB25 adapter were supplied
with the system.
d. Plug the adapter into the terminal block on the printer.
e. Connect the RS-485 terminals on the signal converter to the RS-485 terminals on
the transmitter.
RS-485 connections between signal converter and transmitterTable 2-2:
Transmitter terminals
Model 3500 with
Signal converter ter-
RS-485 terminal
RS-485/ATerminal 112a3225
RS-485/BTerminal 211c3224
minals
Model 3700
screw-type or solder
terminals
Model 3500 with I/O
cables
14Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
2.3Install the Basic/MID system
This procedure provides installation instructions for a system that measures the bunker
delivery and prints bunker tickets. The bunker tickets are OIML/MID-approved.
Schematic of Basic/MID systemFigure 2-2:
RS-485 to RS-232 signal converter
MID-approved
ticket printer
Note
Model 3700 transmitter shown. If marine approvals are not required, the Model 3500 transmitter may also
be used.
Prerequisites
Ensure that the sensor is correctly installed and ready for wiring.
Ensure that the auxiliary devices (level switches, pressure transmitter, and temperature
transmitter) are correctly installed and ready for wiring to the Series 3000 transmitter.
Have the following available:
•Documentation:
-Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and Use
Manual
-The Quick Reference Guide for your transmitter
-Vendor documentation for all components
•Cable:
-Power cable
-Standard twisted-pair shielded signal cable
Locate all components to meet the following requirements:
•The maximum distance between the sensor and the core processor is 60 feet
(20 meters). In a typical installation, the core processor is mounted directly on the
sensor.
•The maximum distance between the core processor and the transmitter is 1000 feet
(300 meters).
•The maximum length of an RS-485 connection is 3600 feet (1000 meters) at
9600 baud.
Application Manual 15
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
•The maximum length of an RS-232 connection is 15 feet (5 meters).
•The ticket printer and signal converter must be installed in a safe area.
Review power requirements for all components and ensure that you will be able to supply
enough power.
Important
For marine approvals (available only with the Model 3700 transmitter, and only if the Marine
Approvals option was ordered), additional requirements apply to the following:
•Wiring between the sensor and the transmitter
•Transmitter I/O wiring
•Transmitter power wiring
See Section 2.6 and incorporate the additional steps into your installation tasks.
Important
During installation, refer to the appropriate integrated wiring diagram. See Section A.2:
•For sensors mounted in a vertical pipe (Flag orientation), see page 89.
•For sensors mounted in a horizontal pipe (Tubes-down orientation), see page 91.
Procedure
1.Follow the instructions in Micro Motion Series 3000 MVD Transmitters and Controllers:
Configuration and Use Manual and the appropriate Quick Reference Guide to perform
the following installation tasks:
a. Mount the transmitter.
b. Wire the transmitter to the sensor.
c. Wire the transmitter’s secondary mA output and frequency output (if they will be
used).
d. Wire power to the transmitter.
e. Ground the transmitter.
2.Wire the level switch (or switches) to Discrete Input 1 and to power.
When Discrete Input 1 is assigned to Start/Stop Totalizers (during configuration), it will
start totalizers when there is liquid in the pipeline, and stop totalizers when there is
no liquid in the pipeline.
3.(Optional) Set up an integrity detection loop and wire it to Discrete Input 2.
The integrity detection loop may be used to detect leaks, cable breakage, short
circuits, and so on. Any preferred method or device can be used.
4.Set up a HART loop that connects the primary mA output to the external pressure
transmitter and the external temperature transmitter.
16Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Notes
• The temperature transmitter is used only to correct volume measurements to reference
temperature. It may not be required in your installation.
• The Field Communicator can be connected to this loop.
5.(Optional) Follow the instructions in Micro Motion Series 3000 MVD Transmitters andControllers: Configuration and Use Manual to wire Discrete Output 1 and Discrete
Output 2 to signal devices such as lights or horns.
Tip
When the Marine Bunker Transfer Package is installed, a special default configuration is
implemented for Discrete Output 1, Discrete Output 2, Discrete Event 1, and Discrete Event
2:
• Discrete Event 1 is activated if Aeration Limit reaches 20% (medium aeration).
• Discrete Event 2 is activated if Aeration Limit reaches 75% (high aeration).
• Discrete Output 1 is assigned to Discrete Event 1.
• Discrete Output 2 is assigned to Discrete Event 2.
If this default configuration is retained and Discrete Output 1 and Discrete Output 2 are wired
to signal devices, the signal devices will alert the operator if Aeration Limit reaches the 20% or
75% threshold. You can change the thresholds defined for medium and high aeration by
changing the HI PV values for Discrete Event 1 and Discrete Event 2.
6.(Optional) Follow the instructions in Micro Motion Series 3000 MVD Transmitters andControllers: Configuration and Use Manual and the appropriate Quick Reference Guide
to wire Discrete Output 3 as desired.
7.Install the ticket printer.
a. Connect the printer to power according to the instructions in the vendor
documentation.
b. Set the DIP switches on the printer as shown in the following table.
CAUTION!
The DIP switches are on the bottom of the printer, under the DIP switch cover. Power
down the printer before removing the DIP switch cover.
DIP switch settings for Epson TM-T88V printerTable 2-3:
Switch bankDIP switch settingsPrinter communication parameters
DSW1Switch 1-1OFFBaud: 38400
Switch 1-2OFF
Switch 1-3OFF
Switch 1-4OFF
Switch 1-5ON
Switch 1-6ON
Parity: Even
Data bits: 8
Stop bits: 1
Characters per second: 400
Buffer size: 1024
Application Manual 17
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
DIP switch settings for Epson TM-T88V printer (continued)Table 2-3:
Switch bankDIP switch settingsPrinter communication parameters
Switch 1-7ON
Switch 1-8ON
DSW2Switch 2-1OFF
Switches 2-2
through 2-8
c. Attach the adapter to the signal converter.
An RS-485 to RS-232 signal converter and a DB9 to DB25 adapter were supplied
with the system.
d. Plug the adapter into the terminal block on the printer.
e. Connect the RS-485 terminals on the signal converter to the RS-485 terminals on
the transmitter as shown in the following table.
RS-485 connections between signal converter and transmitterTable 2-4:
As desired
Transmitter terminals
Model 3500 with
Signal converter ter-
RS-485 terminal
RS-485/ATerminal 112a3225
RS-485/BTerminal 211c3224
minals
Model 3700
screw-type or solder
terminals
2.4Install the Profile system
This procedure provides installation instructions for a system that measures the bunker
delivery and prints bunker tickets and profile reports. The bunker tickets are not OIML/
MID-approved. The profile report is not OIML/MID-approved. If you do not need to print
bunker tickets, the ticket printer is not required.
Model 3500 with I/O
cables
18Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Schematic of Profile systemFigure 2-3:
Printer Interface
Component
RS-485 to RS-232 signal converter
Ticket printer
RS-485
Relay
Power
supply for
relay
RS-485 to USB signal converter
PC with
ProLink II
Existing
connection
Default printer
Note
Model 3700 transmitter shown. If marine approvals are not required, the Model 3500 transmitter may also be used.
Prerequisites
Ensure that the sensor is correctly installed and ready for wiring.
Ensure that the auxiliary devices (level switches, pressure transmitter, and temperature
transmitter) are correctly installed and ready for wiring to the Series 3000 transmitter.
Ensure that ProLink II v2.94 is installed on the PC you will use for bunkering, and that you
have the appropriate ProLink II installation kit.
Have the following available:
•Documentation:
-Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and Use
Manual
-The Quick Reference Guide for your transmitter
-Vendor documentation for all components
•Cable:
-Power cable
-Standard twisted-pair shielded signal cable
Locate all components to meet the following requirements:
Application Manual 19
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
•The maximum distance between the sensor and the core processor is 60 feet
(20 meters). In a typical installation, the core processor is mounted directly on the
sensor.
•The maximum distance between the core processor and the transmitter is 1000 feet
(300 meters).
•The maximum length of an RS-485 connection is 3600 feet (1000 meters) at
9600 baud.
•The maximum length of an RS-232 connection is 15 feet (5 meters).
•The Printer Interface Component must be installed in a safe area.
•The ticket printer and signal converter must be installed in a safe area.
•The PC and system printer must be installed in a safe area.
Review power requirements for all components and ensure that you will be able to supply
enough power.
Important
For marine approvals (available only with the Model 3700 transmitter, and only if the Marine
Approvals option was ordered), additional requirements apply to the following:
•Wiring between the sensor and the transmitter
•Transmitter I/O wiring
•Transmitter power wiring
See Section 2.6 and incorporate the additional steps into your installation tasks.
Important
During installation, refer to the appropriate integrated wiring diagram. See Section A.3:
•For sensors mounted in a vertical pipe (Flag orientation), see page 94.
•For sensors mounted in a horizontal pipe (Tubes-down orientation), see page 96.
Procedure
1.Follow the instructions in Micro Motion Series 3000 MVD Transmitters and Controllers:
Configuration and Use Manual and the appropriate Quick Reference Guide to perform
the following installation tasks:
a. Mount the transmitter.
b. Wire the transmitter to the sensor.
c. Wire the transmitter’s secondary mA output and frequency output (if they will be
used).
d. Wire power to the transmitter.
e. Ground the transmitter.
2.Mount the Printer Interface Component to any flat surface. See the following figure
for mounting dimensions.
20Micro Motion® Marine Bunker Transfer Package
A
B
C
D
E
F
G
H
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Mounting dimensions for Printer Interface ComponentFigure 2-4:
A. Front view, width: 7.464 in (189.58 mm)
B. Front view, height: 9.360 in (237.73 mm)
C. Side view, width: 6.199 in (157.45 mm)
D. Mounting plate, width: 2× 0.250 in (6.35 mm)
E. Back view, height: 9.625 in (244.48 mm)
F. Back view, space between mounting holes: 8.875 in (225.42 mm)
G. Back view, width: 4.000 in (101.60 mm)
H. Back view, space between mounting holes: 5.000 in (127.00 mm)
∅
I. Back view, size of mounting holes: 4×
0.308 in thru (7.81 mm)
3.Wire the level switch (or switches) to Discrete Input 1 and to power.
When Discrete Input 1 is assigned to Start/Stop Totalizers (during configuration), it will
start totalizers when there is liquid in the pipeline, and stop totalizers when there is
no liquid in the pipeline.
4.(Optional) Set up an integrity detection loop and wire it to Discrete Input 2.
The integrity detection loop may be used to detect leaks, cable breakage, short
circuits, and so on. Any preferred method or device can be used.
5.Set up a HART loop that connects the primary mA output to the external pressure
transmitter and the external temperature transmitter.
Notes
• The temperature transmitter is used only to correct volume measurements to reference
temperature. It may not be required in your installation.
• The Field Communicator can be connected to this loop.
6.(Optional) Follow the instructions in Micro Motion Series 3000 MVD Transmitters andControllers: Configuration and Use Manual to wire Discrete Output 1 and Discrete
Output 2 to signal devices such as lights or horns.
Application Manual 21
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Tip
When the Marine Bunker Transfer Package is installed, a special default configuration is
implemented for Discrete Output 1, Discrete Output 2, Discrete Event 1, and Discrete Event
2:
• Discrete Event 1 is activated if Aeration Limit reaches 20% (medium aeration).
• Discrete Event 2 is activated if Aeration Limit reaches 75% (high aeration).
• Discrete Output 1 is assigned to Discrete Event 1.
• Discrete Output 2 is assigned to Discrete Event 2.
If this default configuration is retained and Discrete Output 1 and Discrete Output 2 are wired
to signal devices, the signal devices will alert the operator if Aeration Limit reaches the 20% or
75% threshold. You can change the thresholds defined for medium and high aeration by
changing the HI PV values for Discrete Event 1 and Discrete Event 2.
7.Install the ticket printer.
a. Connect the printer to power according to the instructions in the vendor
documentation.
b. Set the DIP switches on the printer as shown in the following table.
DIP switch settings for Epson TM-U295 printerTable 2-5:
DIP switchSettingPrinter communication parameters
1OFFBaud: 9600
2OFF
3OFF
4OFF
5ON
6ON
7OFF
8OFF
9OFF
10OFF
Parity: Even
Data bits: 8
Stop bits: 1
Characters per second: 32
Buffer size: 128
c. Attach the adapter to the signal converter.
An RS-485 to RS-232 signal converter and a DB9 to DB25 adapter were supplied
with the system.
d. Plug the adapter into the terminal block on the printer.
8.Wire the Printer Interface Component.
a. Open the Printer Interface Component.
b. Wire power to the relay power supply according to the instructions in the vendor
documentation.
c. Wire the relay to Discrete Output 3 on the transmitter.
22Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
d. Wire one set of RS-485 terminals on the relay to the RS-485 terminals on the
transmitter.
RS-485 connections between transmitter and relayTable 2-6:
Transmitter terminals
Model 3500 with
screw-type or solder
RS-485 terminalRelay terminals
RS-485/ATerminal 2112a3225
RS-485/BTerminal 1111c3224
Model 3700
terminals
Model 3500 with I/O
cables
e. Wire one set of RS-485 terminals on the relay to the RS-485 terminals on the
signal converter.
RS-485 connections between signal converter and relayTable 2-7:
9.Ensure that the PC is connected to the printer that you will use to print the profile
report, and that this printer is defined as the default printer.
2.5Install the Profile/MID system
This procedure provides installation instructions for a system that measures the bunker
delivery and prints bunker tickets and profile reports. The bunker tickets are OIML/MIDapproved. The profile reports are not OIML/MID-approved.
Application Manual 23
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Schematic of Profile/MID systemFigure 2-5:
Printer Interface
Component
RS-485 to RS-232 signal converter
MID-approved
ticket printer
RS-485
Relay
Power
supply for
relay
RS-485 to USB signal converter
PC with
ProLink II
Default printer
Note
Model 3700 transmitter shown. If marine approvals are not required, the Model 3500 transmitter may also be used.
Prerequisites
Ensure that the sensor is correctly installed and ready for wiring.
Ensure that the auxiliary devices (level switches, pressure transmitter, and temperature
transmitter) are correctly installed and ready for wiring to the Series 3000 transmitter.
Existing
connection
Ensure that ProLink II v2.94 is installed on the PC you will use for bunkering, and that you
have the appropriate ProLink II installation kit.
Have the following available:
•Documentation:
-Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and Use
Manual
-The Quick Reference Guide for your transmitter
-Vendor documentation for all components
•Cable:
-Power cable
-Standard twisted-pair shielded signal cable
Locate all components to meet the following requirements:
24Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
•The maximum distance between the sensor and the core processor is 60 feet
(20 meters). In a typical installation, the core processor is mounted directly on the
sensor.
•The maximum distance between the core processor and the transmitter is 1000 feet
(300 meters).
•The maximum length of an RS-485 connection is 3600 feet (1000 meters) at
9600 baud.
•The maximum length of an RS-232 connection is 15 feet (5 meters).
•The Printer Interface Component must be installed in a safe area.
•The ticket printer and signal converter must be installed in a safe area.
•The PC and system printer must be installed in a safe area.
Review power requirements for all components and ensure that you will be able to supply
enough power.
Important
For marine approvals (available only with the Model 3700 transmitter, and only if the Marine
Approvals option was ordered), additional requirements apply to the following:
•Wiring between the sensor and the transmitter
•Transmitter I/O wiring
•Transmitter power wiring
See Section 2.6 and incorporate the additional steps into your installation tasks.
Important
During installation, refer to the appropriate integrated wiring diagram. See Section A.4:
•For sensors mounted in a vertical pipe (Flag orientation), see page 99.
•For sensors mounted in a horizontal pipe (Tubes-down orientation), see page 101.
Procedure
1.Follow the instructions in Micro Motion Series 3000 MVD Transmitters and Controllers:
Configuration and Use Manual and the appropriate Quick Reference Guide to perform
the following installation tasks:
a. Mount the transmitter.
b. Wire the transmitter to the sensor.
c. Wire the transmitter’s secondary mA output and frequency output (if they will be
used).
d. Wire power to the transmitter.
e. Ground the transmitter.
2.Mount the Printer Interface Component to any flat surface. See the following figure
for mounting dimensions.
Application Manual 25
A
B
C
D
E
F
G
H
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Mounting dimensions for Printer Interface ComponentFigure 2-6:
A. Front view, width: 7.464 in (189.58 mm)
B. Front view, height: 9.360 in (237.73 mm)
C. Side view, width: 6.199 in (157.45 mm)
D. Mounting plate, width: 2× 0.250 in (6.35 mm)
E. Back view, height: 9.625 in (244.48 mm)
F. Back view, space between mounting holes: 8.875 in (225.42 mm)
G. Back view, width: 4.000 in (101.60 mm)
H. Back view, space between mounting holes: 5.000 in (127.00 mm)
∅
I. Back view, size of mounting holes: 4×
0.308 in thru (7.81 mm)
3.Wire the level switch (or switches) to Discrete Input 1 and to power.
When Discrete Input 1 is assigned to Start/Stop Totalizers (during configuration), it will
start totalizers when there is liquid in the pipeline, and stop totalizers when there is
no liquid in the pipeline.
4.(Optional) Set up an integrity detection loop and wire it to Discrete Input 2.
The integrity detection loop may be used to detect leaks, cable breakage, short
circuits, and so on. Any preferred method or device can be used.
5.Set up a HART loop that connects the primary mA output to the external pressure
transmitter and the external temperature transmitter.
Notes
• The temperature transmitter is used only to correct volume measurements to reference
temperature. It may not be required in your installation.
• The Field Communicator can be connected to this loop.
6.(Optional) Follow the instructions in Micro Motion Series 3000 MVD Transmitters andControllers: Configuration and Use Manual to wire Discrete Output 1 and Discrete
Output 2 to signal devices such as lights or horns.
26Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Tip
When the Marine Bunker Transfer Package is installed, a special default configuration is
implemented for Discrete Output 1, Discrete Output 2, Discrete Event 1, and Discrete Event
2:
• Discrete Event 1 is activated if Aeration Limit reaches 20% (medium aeration).
• Discrete Event 2 is activated if Aeration Limit reaches 75% (high aeration).
• Discrete Output 1 is assigned to Discrete Event 1.
• Discrete Output 2 is assigned to Discrete Event 2.
If this default configuration is retained and Discrete Output 1 and Discrete Output 2 are wired
to signal devices, the signal devices will alert the operator if Aeration Limit reaches the 20% or
75% threshold. You can change the thresholds defined for medium and high aeration by
changing the HI PV values for Discrete Event 1 and Discrete Event 2.
7.Install the ticket printer.
a. Connect the printer to power according to the instructions in the vendor
documentation.
b. Set the DIP switches on the printer as shown in the following table.
CAUTION!
The DIP switches are on the bottom of the printer, under the DIP switch cover. Power
down the printer before removing the DIP switch cover.
DIP switch settings for Epson TM-T88V printerTable 2-8:
Switch bankDIP switch settingsPrinter communication parameters
DSW1Switch 1-1OFFBaud: 38400
Switch 1-2OFF
Switch 1-3OFF
Switch 1-4OFF
Switch 1-5ON
Switch 1-6ON
Switch 1-7ON
Switch 1-8ON
DSW2Switch 2-1OFF
Switches 2-2
through 2-8
As desired
Parity: Even
Data bits: 8
Stop bits: 1
Characters per second: 400
Buffer size: 1024
c. Attach the adapter to the signal converter.
An RS-485 to RS-232 signal converter and a DB9 to DB25 adapter were supplied
with the system.
d. Plug the adapter into the terminal block on the printer.
Application Manual 27
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
8.Wire the Printer Interface Component.
a. Open the Printer Interface Component.
b. Wire power to the relay power supply according to the instructions in the vendor
documentation.
c. Wire the relay to Discrete Output 3 on the transmitter.
d. Wire one set of RS-485 terminals on the relay to the RS-485 terminals on the
transmitter.
RS-485 connections between transmitter and relayTable 2-9:
Transmitter terminals
Model 3500 with
screw-type or solder
RS-485 terminalRelay terminals
RS-485/ATerminal 2112a3225
RS-485/BTerminal 1111c3224
Model 3700
terminals
Model 3500 with I/O
cables
e. Wire one set of RS-485 terminals on the relay to the RS-485 terminals on the
signal converter.
RS-485 connections between signal converter and relayTable 2-10:
9.Ensure that the PC is connected to the printer that you will use to print the profile
report, and that this printer is defined as the default printer.
2.6Install ferrite beads in transmitter wiring (if
required)
To comply with the RF (radio frequency) emissions limits specified in IACS E10 and Lloyd's
Register Test Specification Number 1 (2002), ferrite beads must be installed on all cables
connected to the Model 3700 transmitter. If the Marine Approvals option is ordered,
Micro Motion supplies a set of ferrite beads to be used for this purpose.
Restriction
This requirement applies only to installations that require marine approvals [i.e., Lloyd's Register,
Bureau Veritas (BV), Det Norske Veritas (DNV), American Bureau of Shipping (ABS)]. For these
installations, the Model 3700 transmitter is required.
28Micro Motion® Marine Bunker Transfer Package
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Prerequisites
•The set of four ferrite beads supplied with the Marine Approvals option: three small
beads and one large bead
•Heat shrink (optional)
Procedure
1.When wiring the transmitter to the sensor, loop all four wires through the large
ferrite bead, and repeat, so that the wires form two complete loops around the
bead. Position the bead close to the conduit openings on the transmitter, while
leaving some slack in the wires.
Large ferrite bead in sensor-to-transmitter wiringFigure 2-7:
2.When wiring the transmitter to the power supply, loop all wires (two or three,
depending on installation) through one of the small ferrite beads, so that the wires
form one complete loop around the bead. Position the bead close to the conduit
openings on the transmitter, while leaving some slack in the wires.
Small ferrite bead in power wiringFigure 2-8:
3.When wiring the transmitter to inputs and outputs, pass the I/O wires through one
of the small ferrite beads. You may use one or two beads, as convenient. Position
the bead close to the conduit openings on the transmitter, while leaving some slack
in the wires.
Tip
Micro Motion recommends looping the I/O wires, but loops are not required in this location.
Application Manual 29
Install the Series 3000 transmitter with the Marine Bunker Transfer Package
Small ferrite beads in I/O wiringFigure 2-9:
4.(Optional) Apply heat shrink to stabilize the wires in the beads.
5.Tuck the beads and wires into the available space inside the transmitter wiring
compartment.
Ferrite beads in transmitter wiring compartmentFigure 2-10:
30Micro Motion® Marine Bunker Transfer Package
3Start up the system
Topics covered in this chapter:
•Power up the system
•Perform optional startup tasks
3.1Power up the system
You must power up the transmitter, the ticket printer, and the relay power supply in the
Printer Interface Component (when applicable).
1.Follow the instructions in Micro Motion Series 3000 MVD Transmitters and Controllers:
Configuration and Use Manual to power up the transmitter.
After the standard start-up sequence, the transmitter displays the Marine Bunkering
dashboard. The Security Breach banner is displayed at the top of the screen.
Start up the system
2.Follow the instructions in the vendor documentation to power up the ticket printer.
3.(Optional) Power up the relay power supply in the Printer Interface Component.
3.1.1Marine Bunkering dashboard at system startup
The Marine Bunkering dashboard contains the display menus and controls that are used to
configure the bunker ticket, perform a bunker transfer, and print the bunker ticket.
Options on the Marine Bunkering dashboard at system
startup
If the Marine Bunker Transfer Package is installed, the transmitter automatically displays
the Marine Bunkering dashboard when the system is first powered up.
The Marine Bunkering dashboard offers the following menu options:
•Bunker Operations
•Bunker Ticket Log (not displayed until a bunker transfer has been performed)
•Format Ticket
Exiting and returning to the Marine Bunkering dashboard
To access other areas of the display and menu system from the Marine Bunkering
dashboard:
•Press the Exit button to access the View menu.
•Press the Security button to access the Management menu.
Application Manual 31
Start up the system
3.2Perform optional startup tasks
Zeroing the flowmeter can be used to adjust measurement to local conditions. Testing the
inputs and outputs ensures that signals are being sent and received. Trimming the mA
outputs calibrates the mA output to the mA receiving device.
Tip
In most cases, these tasks will be performed by the service technician who performs the system
startup.
Prerequisites
To perform these tasks, the transmitter must be unsecured.
Important
If you send the transmitter to a calibration facility to perform a water calibration, either during
startup or any time thereafter, LD Optimization must be disabled. To do this: Navigate to the
Management menu, then select Configuration > Inputs > Core Processor > Sensor Cal Data . Scroll to LDOptimization and disable the feature (change Yes to No). When you have completed the calibration, reenable LD Optimization.
Procedure
1.At the transmitter, navigate to the Management menu.
Tip
If you are at the Marine Bunkering dashboard, press the Security button.
2.Follow the instructions in Micro Motion Series 3000 MVD Transmitters and Controllers:
Configuration and Use Manual to perform these tasks, if appropriate.
a. Zero the flowmeter.
b. Perform loop tests on the mA outputs, frequency output, discrete outputs, and
discrete inputs.
c. Trim the mA outputs.
3.Press the Exit button to return to the Marine Bunkering dashboard.
32Micro Motion® Marine Bunker Transfer Package
Configure the system using the transmitter display
4Configure the system using the
transmitter display
Topics covered in this chapter:
•Configure auxiliary devices
•Configure basic flowmeter parameters
•Configure bunker ticket options using the transmitter display
•Configure communications
•Secure and seal the transmitter
Tip
In most cases, these tasks will be performed by the service technician who performs the system
startup.
4.1Configure auxiliary devices
The pressure transmitter, temperature transmitter, level switches, and integrity detection
devices (if present) must be configured for use by the Series 3000 transmitter.
1.At the pressure transmitter:
a. Define a HART tag for polling.
b. Set the pressure unit to the unit to be used by the Series 3000 transmitter.
2.At the temperature transmitter:
a. Define a HART tag for polling.
b. Set the temperature unit to the unit to be used by the Series 3000 transmitter.
3.At the level switch (or switches):
a. Set Mode Switch to Wet On.
b. Set Switching Time Delay to 0.3 seconds.
4.(Optional) If your installation includes an integrity detection loop, configure the
integrity detection devices as required to report leakage, broken cables, short
circuits, or other malfunction.
Application Manual 33
Configure the system using the transmitter display
4.2Configure basic flowmeter parameters
Basic flowmeter parameters include the parameters that are part of standard transmitter
configuration. Some parameters are configured automatically by the Marine Bunker
Transfer Package. Some parameters are not applicable to systems with the Marine Bunker
Transfer Package. You can configure the remaining parameters as appropriate for your
installation.
Prerequisites
Refer to Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and Use
Manual for detailed configuration instructions and access to menus.
To configure the transmitter, the transmitter must be unsecured.
When the Marine Bunker Transfer Package is installed, certain parameters are set
specifically for marine bunkering installations (see Section 4.2.1). All other parameters are
set to the transmitter defaults.
Procedure
1.At the transmitter, navigate to the Management menu.
Tip
If you are at the Marine Bunkering dashboard, press the Security button.
2.Configure security and language.
a. Configure the maintenance and configuration passwords, and enable or disable
them as desired.
b. Configure the language used on the display.
Restriction
The language selection does not apply to the Marine Bunker Transfer Package menus and
displays. English is used for all Marine Bunker Transfer Package screens.
c. Do not configure the Weights & Measures application.
d. Do not enable write-protection.
3.Configure system data and alarm severity.
4.Enable core processor inputs.
5.Configure process variables as desired.
6.Configure sensor calibration data and sensor information for your sensor.
7.Set Flow Direction.
34Micro Motion® Marine Bunker Transfer Package
Configure the system using the transmitter display
OptionDescription
Forward OnlyBunker transfers will be measured in one direction only: either loading or
unloading. The Flow Direction arrow on the sensor matches the direction
of flow.
Negate Forward
Only
Bi-DirectionalBunker transfers will be measured in two directions: both loading and un-
Tip
Forward Only and Negate Forward Only are typically used by shore facilities and vessels. BiDirectional is used only by barges.
Important
If you set Flow Direction to Bi-Directional, ensure that the Mass Total value shown at the beginning
of each transfer is 0.0. If it is not, contact Micro Motion.
Bunker transfers will be measured in one direction only: either loading or
unloading. The Flow Direction arrow on the sensor is opposite to the direction of flow.
loading.
8.Configure Discrete Input 1 for use with the level switch or switches.
a. Set Discrete Input 1 Polarity to Active Low.
b. Assign Start/Stop Totalizers to Discrete Input 1.
If the system is wired as recommended, totalizers will start when liquid is detected in
the pipeline, and stop when no liquid is detected.
9.(Optional) Configure Discrete Input 2 for use in the integrity detection loop, if
present in your installation.
a. Set Discrete Input 2 Polarity as required by the integrity detection device and the
wiring.
b. Assign Integrity Breach to Discrete Input 2.
The transmitter will post Alarm 133: Integrity Detection if a problem with flow or wiring is
detected.
10.(Optional) Configure Discrete Events 3, 4, and 5.
11.Configure polling for temperature.
Set External Tag to the tag defined at the temperature device.
12.Configure polling for pressure.
Set External Tag to the tag defined at the pressure device.
13.Configure other input parameters as desired.
14.Configure outputs.
Application Manual 35
Configure the system using the transmitter display
a. If Discrete Output 3 is wired to a relay to enable printing both bunker tickets and
profile reports (Profile or Profile/MID systems), set the source variable to RS485Dual Function.
b. Configure all other outputs as desired.
Tip
When the Marine Bunker Transfer Package is installed, a special default configuration is
implemented for Discrete Output 1, Discrete Output 2, Discrete Event 1, and Discrete
Event 2:
• Discrete Event 1 is activated if Aeration Limit reaches 20% (medium aeration).
• Discrete Event 2 is activated if Aeration Limit reaches 75% (high aeration).
• Discrete Output 1 is assigned to Discrete Event 1.
• Discrete Output 2 is assigned to Discrete Event 2.
If this default configuration is retained and Discrete Output 1 and Discrete Output 2 are
wired to signal devices, the signal devices will alert the operator if Aeration Limit reaches
the 20% or 75% threshold. You can change the thresholds defined for medium and high
aeration by changing the HI PV values for Discrete Event 1 and Discrete Event 2.
15.(Optional) Follow the instructions in Micro Motion Series 3000 MVD Transmitters and
Controllers: Configuration and Use Manual to configure the process monitor.
Tip
You can configure Aeration Limit as a display variable. Use this approach if you want to
monitor Aeration Limit along with other variables that are not on the Marine Bunkering
dashboard.
16.Press the Exit button to return to the Marine Bunkering dashboard.
4.2.1Default parameter settings for the Marine Bunker
Transfer Package
When the Marine Bunker Transfer Package is installed, the default values for certain
parameters are different from the standard transmitter defaults.
Parameters that have different default values are listed in the following table. All other
parameters have the standard defaults.
Parameters for Marine Bunker Transfer PackageTable 4-1:
ParameterDefault values set by Marine Bunker
Transfer Package
Mass Flow Cutoff8 tonnes/hr to 36 tonnes/hr, depend-
ing on sensor
Mass Flow Measurement Unitmetric tonnes per hourAs desired.
Volume Flow TypeLiquidAs desired.
Volume Flow Measurement Unitm3/hrAs desired.
User configuration
As desired.
36Micro Motion® Marine Bunker Transfer Package
Configure the system using the transmitter display
Parameters for Marine Bunker Transfer Package (continued)Table 4-1:
ParameterDefault values set by Marine Bunker
Transfer Package
Volume Flow Cutoff8 m3/hr to 37.5 m3/hr, depending on
Discrete Output 3Assignment = None• For Basic and Basic/MID systems,
ProtocolPrinter
PrinterEpson TMT88As appropriate for installed ticket
Baud Rate38400As appropriate for installed ticket
ParityEvenMicro Motion recommends leaving
Data Bits8Micro Motion recommends leaving
Stop Bits1Micro Motion recommends leaving
Characters Per Second400As appropriate for installed ticket
Print Buffer Size1024As appropriate for installed ticket
23BAs desired.
Type = HI
HI PV = 20
Type = HI
HI PV = 75
User configuration
Micro Motion recommends leaving
this at the default.
Micro Motion recommends leaving
this at the default.
this at the default.
this at the default.
available for customer assignment.
• For Profile and Profile/MID sys-
tems, must be set to RS485 DualFunction.
printer.
printer.
this at the default.
this at the default.
this at the default.
printer.
printer.
Application Manual 37
Configure the system using the transmitter display
Parameters for Marine Bunker Transfer Package (continued)Table 4-1:
ParameterDefault values set by Marine Bunker
Transfer Package
Print ConditionNo FlowRequired setting. Do not change.
User configuration
4.3Configure bunker ticket options using the
transmitter display
The bunker ticket contains a standard set of process and bunker data, and can be
configured to include additional process and bunker data. You can print one, two, or three
tickets automatically.
Prerequisites
To configure bunker ticket options, the transmitter must be unsecured.
Procedure
1.Navigate to the Format Ticket menu.
2.Define Header 1, Header 2, and Footer as desired.
Tip
You can change the header and footer parameters while the transmitter is secured. This
allows you to use them for bunker-specific information if desired (for example, vessel name,
purchaser name, and so on).
3.Choose Item Display Options and select the items to be printed on the ticket.
Important
If you will be measuring bunker transfers in both directions (loading and unloading), you must
enable Mass Inventory.
OptionDescription
Mass Inventory Total mass of all bunkers transferred since the last inventory reset, plus the
two forward inventories and the two reverse inventories. Labels and values
depend on the setting of the Mass In Air option.
Average Temperature
Average API
Density
Aeration LimitValue of Aeration Limit at the end of the bunker transfer.
Temperature of the process fluid, averaged across the entire bunker and expressed as a batch-weighted average with the configured volume unit used
as the batch.
Average density of the bunker, at reference temperature.
38Micro Motion® Marine Bunker Transfer Package
Configure the system using the transmitter display
OptionDescription
Bunker Re-
(1)
sult
Bunker Result
Details
Pass: The bunker transfer passed all four OIML/MID checks.
Fail: The bunker transfer failed one or more of the four OIML/MID checks.
Individual results for the four OIML/MID checks:
• MMQ check
• Max Aeration check
• Alarm check
• Power check
These are printed only if Bunker Result = Fail.
Mass In AirOFF: The total and inventory values on the ticket represent “true mass,” or
“mass in vacuum.” The following labels are used:
• Mass Total
• Bunker Begin Fwd Inv
• Bunker End Fwd Inv
• Bunker Begin Rev Inv
• Bunker End Rev Inv
ON: The total and inventory values on the ticket represent “mass in air,” and
the Mass in Air conversion factor is printed on the ticket. The following labels
are used:
• Mass in Air
• Begin Fwd Inv Air
• End Fwd Inv Air
• Begin Rev Inv Air
• End Rev Inv Air
Gross Volume
Total
Total volume of the bunker, calculated from the mass total and the average
density of the bunker at process temperature. The mass total is based on
both aerated and non-aerated flow. The average density is based on non-aerated flow. For this calculation, aerated flow is defined as any flow occurring
while drive gain exeeds a preset limit or density exceeds preset limits.
Net Volume
Total
Total volume of the bunker, calculated from the mass total and the average
density of the bunker, corrected to 15 °C. The mass total is based on both
aerated and non-aerated flow. The average density is based on non-aerated
flow. For this calculation, aerated flow is defined as any flow occurring while
drive gain exeeds a preset limit or density exceeds preset limits.
Application Manual 39
Configure the system using the transmitter display
OptionDescription
SPRING TC
Parameters
(1) For Basic/MID and Profile/MID systems, Bunker Results is enabled and cannot be disabled.
ON: All ticket data is printed as configured.
OFF: The following items are not printed, whether or not they were configured:
• “Approved Measurement” banner
• Gross Volume Total
• Net Volume Total
• Average API Density
• Average Temperature
• Aeration Limit
• Bunker Result
• Bunker Result Details
• MID Certificate Number
• Measurement accuracy statement
If SPRING TC Parameters is set to OFF, the bunker ticket cannot be used as a
legal receipt.
Note
Certain items are always included on the ticket, and cannot be disabled.
4.Set Number of Tickets to the number of tickets to be printed by a single PRINT
command.
The default value is 3. The range is 1 to 3.
On the first ticket, the word “Original” is printed at the bottom of the ticket. On the
second and third tickets, the word “Copy” is printed at the bottom of the ticket.
Tip
You can change the Number of Tickets setting while the transmitter is secured.
4.3.1Mass in air
Micro Motion flowmeters provide a “true mass” or “mass in vacuum” value for mass
measurement. Weigh scales provide a “mass in air” value. Due to the buoyancy effect of
the air around the object being weighed, the “mass in air” value is lower than the “mass in
vacuum” value.
If Mass In Air is enabled, the transmitter will calculate the “mass in air” value, and print the
“mass in air” total on the bunker ticket instead of the Mass Total (“mass in vacuum”) value.
To calculate “mass in air”, the transmitter multiplies the Mass Total value by the Mass in Air
conversion factor: 0.998925. This constant is based on environmental conditions at sea
level.
40Micro Motion® Marine Bunker Transfer Package
Configure the system using the transmitter display
Note
The actual conversion factor varies according to current environmental conditions. However, the
effect of this variability is extremely small and can be ignored for all practical purposes.
4.4Configure communications
If you have a Basic or Basic/MID system, you must configure communications between the
transmitter and the ticket printer. If you have a Profile or Profile/MID system, you must
configure communications between the transmitter and the ticket printer and between
the transmitter and ProLink II.
4.4.1Configure communications for a Basic or Basic/MID
system
This configuration allows you to print bunker tickets on the ticket printer.
Prerequisites
The transmitter must be unsecured.
Procedure
1.At the transmitter, navigate to the Management menu.
Tip
If you are at the Marine Bunkering dashboard, press the Security button.
2.Choose Configuration > Digital Communication .
3.Set Protocol to Printer.
4.Choose Configure Printer and set Printer Selection as required:
OptionDescription
Epson TMU295 Standard ticket printer. Does not meet OIML/MID requirements. Use this op-
tion for Basic or Profile systems.
Epson TMT88MID-approved ticket printer. Use this option for Basic/MID or Profile/MID
systems.
5.Set other parameters as shown in the following table.
Basic and Profile sys-
Parameter
Baud Rate960038400
ParityEvenEven
Data Bits88
Application Manual 41
temsBasic/MID and Profile/MID systems
Configure the system using the transmitter display
Parameter
Stop Bits11
Characters Per Second32400
Print Buffer Size1281024
Lines Per Page25 (not configurable)25 (not configurable)
Note
Header Line 1, Header Line 2, and Footer were configured during ticket configuration. The display
shows the configured values.
6.(Optional) To test ticket printing, press EXIT to return to the previous menu, then
press Printer Test.
Need help? If the ticket fails to print:
• Verify that the communications parameters in the transmitter are set appropriately for
your printer.
• Verify that the DIP switches on the printer are set as recommended. See Appendix B.
• Verify that the DIP switches on the signal converter are set as recommended. See
Appendix B.
• Verify all wiring between the transmitter and the printer. See Appendix A.
Basic and Profile systemsBasic/MID and Profile/MID systems
4.4.2Configure communications for a Profile or Profile/MID
system
This configuration allows you to print bunker tickets on the ticket printer, to send data to
the ProLink II bunkering database, and to print profile reports on the PC printer.
Prerequisites
The transmitter must be unsecured.
Procedure
1.At the transmitter, navigate to the Management menu.
Tip
If you are at the Marine Bunkering dashboard, press the Security button.
2.Choose Configuration > Digital Communication .
3.Set Protocol to Printer.
4.Choose Configure Printer and set Printer Selection as required:
42Micro Motion® Marine Bunker Transfer Package
Configure the system using the transmitter display
OptionDescription
Epson TMU295 Standard ticket printer. Does not meet OIML/MID requirements. Use this op-
tion for Basic or Profile systems.
Epson TMT88MID-approved ticket printer. Use this option for Basic/MID or Profile/MID
systems.
5.Set other parameters as shown in the following table.
Basic and Profile sys-
Parameter
Baud Rate960038400
ParityEvenEven
Data Bits88
Stop Bits11
Characters Per Second32400
Print Buffer Size1281024
Lines Per Page25 (not configurable)25 (not configurable)
temsBasic/MID and Profile/MID systems
Note
Header Line 1, Header Line 2, and Footer were configured during ticket configuration. The display
shows the configured values.
6.(Optional) To test ticket printing, press EXIT to return to the previous menu, then
press Printer Test.
Need help? If the ticket fails to print:
• Verify that the communications parameters in the transmitter are set appropriately for
your printer.
• Verify that the DIP switches on the printer are set as recommended. See Appendix B.
• Verify that the DIP switches on the signal converter are set as recommended. See
Appendix B.
• Verify all wiring between the transmitter and the printer. See Appendix A.
7.Set Protocol to Modbus RTU.
This is required because the ProLink II connection will be made before any tickets are
printed. The system runs in RS-485 mode, and switches to Printer protocol
automatically when printing tickets. After the ticket has printed, the system
switches back to RS-485 mode.
8.(Optional) If you want to change the transmitter’s address from the default (1),
choose Configure Protocol and set Polling Address to the desired address.
9.(Optional) To test the connection from ProLink II:
a. Start ProLink II and choose Connection > Connect to Device.
Application Manual 43
Configure the system using the transmitter display
b. In the ProLink II Connection dialog box, set Baud Rate, Parity, Stop Bits, and Address
to the values that you set in the transmitter. Set Serial Port to the PC port that you
are using for the connection. Then click Connect.
c. Using the transmitter display, fix Discrete Output 3 ( Management > Maintenance >
The ProLink II connection will be broken, as shown in the ProLink II menu bar.
d. Using the transmitter display, unfix Discrete Output 3.
ProLink II should reconnect automatically.
10.At the PC where ProLink II is installed, change the power options so that Windows
will not turn off the monitor or the hard disks or go into standby mode during a
bunker transfer.
To change the power options, use the Windows Control Panel.
Tip
Micro Motion recommends setting the PC power options to Never.
4.5Secure and seal the transmitter
Securing the transfer protects it from accidental or unauthorized configuration changes.
To meet Weights & Measures requirements (Basic/MID or Profile/MID systems), the
transmitter must be sealed after it is secured.
Prerequisites
Before securing the transmitter, ensure that all parameters are configured correctly, all
required tests and calibrations have been performed, and that the system is performing
correctly. After the transmitter has been secured, only basic operational procedures can be
performed.
If you are setting up a Basic/MID or Profile/MID system, review the sealing instructions in
Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and Use Manual
and arrange for a site visit from a certified Weights & Measures inspector.
Procedure
1.To secure the transmitter, set the security switch on the transmitter to ON.
See Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and UseManual for detailed instructions on securing the transmitter.
Note
Although you can perform bunker transfers while the transmitter is unsecured, the ticket will
contain a Security Breach banner, and the transfer will not meet OIML/MID requirements.
44Micro Motion® Marine Bunker Transfer Package
Configure the system using the transmitter display
2.(Optional) To seal the transmitter, a wire seal must be installed in the designated
location on the transmitter housing.
See Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and UseManual for detailed instructions on sealing the transmitter. This function is typically
performed by the Micro Motion service technician.
Note
You do not need to seal the transmitter to perform bunker transfers. Sealing the transmitter is
required only if the bunker transfer must meet Weights & Measures requirements (Basic/MID
or Profile/MID systems).
Application Manual 45
Configure the system using the transmitter display
46Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
5Operate the system from the
transmitter display
Topics covered in this chapter:
•Transfer a bunker and print a ticket
•Transfer a bunker, collect profile data, and print a ticket and/or a profile report
•Marine Bunkering dashboard during bunker transfer
•Process variables during a bunker transfer
•Process noise due to vibration
•Contents of bunker ticket for Basic and Profile systems
•Contents of bunker ticket for Basic/MID and Profile/MID systems
•Retrieve and reprint bunker tickets using the transmitter display
5.1Transfer a bunker and print a ticket
This procedure guides you through transferring a bunker and printing a bunker ticket. For
Basic systems, ticket printing is optional. For Basic/MID systems, ticket printing is required.
Tip
If you want to print bunker-specific information on the bunker ticket, e.g., the vessel name, you can
change the settings of Header 1, Header 2, and Footer while the transmitter is secured. You can also
change the setting of Number of Tickets while the transmitter is secured.
Prerequisites
Ensure that the transmitter is secured.
Ensure that you are complying with all other applicable procedures, e.g., procedures for
your barge or vessel, procedures for OIML/MID compliance, etc.
Ensure that Mass Flow Rate is 0.0.
Check startup values:
•Shore facilities and vessels: Ensure that Mass Total is 0.0, or the site-specific Systemic
Holdup value that was configured for your system during commissioning. If it is not,
press the Print button to reset the totals.
•Barges: Ensure that Mass Total is 0.0. If it is not, press the Print button to reset the
totals. If this does not correct the problem, contact Micro Motion.
Tip
If your system does not include a ticket printer, a Reset button is displayed instead of the Print button.
Press Reset to reset the totals.
Application Manual 47
Operate the system from the transmitter display
Take appropriate precautions to ensure that flow occurs in only one direction during the
bunker transfer. Small amounts of backflow due to valve action or other mechanical issues
are insignificant, but larger amounts will affect measurement accuracy.
During the bunker transfer, take appropriate steps to ensure that Mass Flow Rate does not
hover around 0. Very low values for Mass Flow Rate can affect measurement accuracy. Low
values for Mass Flow Rate at the beginning and end of the bunker transfer have insignificant
effects.
Procedure
1.At the Marine Bunkering dashboard, select Bunker Operations.
Tip
If you are not at the Marine Bunkering dashboard, press the Exit button as required until the
Marine Bunkering dashboard is displayed.
2.Start flow and totalizers.
If you have installed and configured the system as recommended, totalizers will be
started automatically when liquid is detected in the pipeline. If a transmitter power
cycle has occurred, totalizing does not begin until system startup procedures are
complete.
3.At the Marine Bunkering dashboard, monitor bunker delivery and aeration. If
necessary, take appropriate steps to reduce aeration.
Tips
• At 20% of Maximum Measured Quantity (MMQ), the display reports conditions of medium
and high aeration. At 100% of MMQ, the display reports the current value of Aeration Limit.
• During the bunker transfer, you can stop and restart flow as required. If you have installed
and configured the system as recommended, totalizers will be stopped and restarted
automatically.
4.To end the bunker transfer:
a. Stop flow.
b. Press the Print button on the transmitter.
Important
• For systems without a ticket printer, a Reset button is displayed instead of the Print
button. Use the Reset button to end the transfer.
• The Print button (or Reset button) is not available until Mass Flow Rate is 0 and the totals
are non-zero.
• If the ticket queue in the transmitter contains unprinted tickets, transfer data will be
lost when additional tickets are printed. Print the current ticket, then print all
unprinted tickets before performing another bunker transfer. If this is the case, the
transmitter displays an informational message.
48Micro Motion® Marine Bunker Transfer Package
• If the value Mass Total contains more digits than the display can handle, the transmitter
shows 0 R (where “R” is the rollover indicator). However, because the underlying value
is non-zero, the Print button is available.
The bunker ticket is printed on the ticket printer. If you have configured the system
for multiple tickets, all tickets are printed at this time. All totals are automatically
reset in preparation for the next bunker transfer. If Systemic Holdup is non-zero, it is
applied now.
5.To view transfer data, see the bunker ticket. To determine the total amount
transferred, see the following table.
Bunker transfer total from bunker ticketTable 5-1:
Flow Direction set-
Installation
Shore facility or
vessel
BargeBi-directionalTransfer in same
tingBunker transfer total
Forward Only or
Negate Forward
Any of the following:
• Mass Total
• Mass in Air
• Bunker End Forward Inv − Bunker Begin Forward Inv
• End Fwd Inv Air − Begin Fwd Inv Air
direction as Flow
Direction arrow
on sensor
Transfer in opposite direction
from Flow Direction arrow on sensor
Operate the system from the transmitter display
Bunker End Forward Inv−Bunker Begin Forward Inv
or
End Fwd Inv Air − Begin Fwd Inv Air
Bunker End Reverse Inv − Bunker Begin Reverse Inv
or
End Rev Inv Air−Begin Rev Inv Air
5.1.1Systemic Holdup
Systemic Holdup is a site-specific value that is calculated and configured during
commissioning by the Micro Motion technician. It represents the amount of process fluid
that may exist between the meter and the transfer point, or in the pipeworks, that cannot
be measured by the meter because it has not flowed through the sensor.
When totals are reset at the end of a bunker transfer, in preparation for the next transfer,
the Mass Total value is adjusted by the configured value of Systemic Holdup. Therefore, the
value of Mass Total at the beginning of the transfer may not be 0.0.
Restriction
Systemic Holdup is not applicable to installations that use bi-directional measurement. These
installations are typically barges. For all installations of this type, the value of Mass Total at the
beginning of the transfer should always be 0.0.
Application Manual 49
Operate the system from the transmitter display
The need for Systemic Holdup can be eliminated by good bunkering practices: Always have
the pipeworks in the same state before and after the bunker transfer: either full/full or
empty/empty.
Important
If you need to change the setting of Systemic Holdup, or if you want to change your bunkering
procedures in a way that affects the fullness of the pipeworks before or after a bunker transfer,
contact Micro Motion.
5.2Transfer a bunker, collect profile data, and
print a ticket and/or a profile report
This procedure guides you through transferring a bunker, collecting profile data, and
printing a bunker ticket and/or a profile report, using the transmitter display. For Profile
systems, ticket printing is optional. For Profile/MID systems, ticket printing is required.
Tip
If you want to print bunker-specific information on the bunker ticket, e.g., the vessel name, you can
change the settings of Header 1, Header 2, and Footer while the transmitter is secured. You can also
change the setting of Number of Tickets while the transmitter is secured.
Prerequisites
To print a bunker ticket, your system must include a ticket printer.
Ensure that the transmitter is secured.
Ensure that you are complying with all other applicable procedures, e.g., procedures for
your barge or vessel, procedures for OIML/MID compliance, etc.
Ensure that Mass Flow Rate is 0.0.
Check startup values:
•Shore facilities and vessels: Ensure that Mass Total is 0.0, or the site-specific Systemic
Holdup value that was configured for your system during commissioning. If it is not,
press the Print button to reset the totals.
•Barges: Ensure that Mass Total is 0.0. If it is not, press the Print button to reset the
totals. If this does not correct the problem, contact Micro Motion.
Tip
If your system does not include a ticket printer, a Reset button is displayed instead of the Print button.
Press Reset to reset the totals.
Take appropriate precautions to ensure that flow occurs in only one direction during the
bunker transfer. Small amounts of backflow due to valve action or other mechanical issues
are insignificant, but larger amounts will affect measurement accuracy.
50Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
During the bunker transfer, take appropriate steps to ensure that Mass Flow Rate does not
hover around 0. Very low values for Mass Flow Rate can affect measurement accuracy. Low
values for Mass Flow Rate at the beginning and end of the bunker transfer have insignificant
effects.
The transmitter must be ready to accept a connection from ProLink II. If you have trouble
making the connection:
•Ensure that communications have been configured for a Profile or Profile/MID
system.
•Ensure that the RS-485 terminals are in RS-485 mode, rather than service port
mode.
Procedure
1.Connect from ProLink II to the transmitter.
a. Start ProLink II.
b. Click Connection > Connect to Device .
c. Set Protocol, Baud Rate, Parity, and Stop Bits to the values configured in the
transmitter.
d. Set Serial Port to the PC port you are using for the connection.
e. Set Address to the value configured for the transmitter. The default address is 1.
f. Click Connect.
If the connection is successful, the Marine Bunkering window is displayed.
Tip
To open the Marine Bunkering window, if you have closed it, choose Tools > Marine Bunker
Transfer.
Important
For best results, ensure that ProLink II is connected to the transmitter for the entire bunker
transfer. If the connection is dropped, data in the profile report and the ProLink II bunkering
database will be incomplete. Check the power options on the PC and ensure that Windows
will not turn off the monitor or the hard disks or go into standby mode during the bunker
transfer.
2.Start flow and totalizers.
If you have installed and configured the system as recommended, totalizers will be
started automatically when liquid is detected in the pipeline. If a transmitter power
cycle has occurred, totalizing does not begin until system startup procedures are
complete.
3.At the Marine Bunkering dashboard, monitor bunker delivery and aeration. If
necessary, take appropriate steps to reduce aeration.
Application Manual 51
Operate the system from the transmitter display
Tips
• At 20% of Maximum Measured Quantity (MMQ), the display reports conditions of medium
and high aeration. At 100% of MMQ, the display reports the current value of Aeration Limit.
• During the bunker transfer, you can stop and restart flow as required. If you have installed
and configured the system as recommended, totalizers will be stopped and restarted
automatically.
4.To end the bunker transfer:
a. Stop flow.
b. Press the Print button, then select Print Ticket or Print Ticket & Report.
Important
• For systems without a ticket printer, a Reset button is displayed instead of the Print
button. Use the Reset button to end the transfer.
• The Print button (or Reset button) is not available until Mass Flow Rate is 0 and the totals
are non-zero.
• If the ticket queue in the transmitter contains unprinted tickets, transfer data will be
lost when additional tickets are printed. Print the current ticket, then print all
unprinted tickets before performing another bunker transfer. If this is the case, the
transmitter displays an informational message.
• If the value Mass Total contains more digits than the display can handle, the transmitter
shows 0 R (where “R” is the rollover indicator). However, because the underlying value
is non-zero, the Print button is available.
The bunker ticket is printed on the ticket printer. If you have configured the system
for multiple tickets, all tickets are printed at this time. The profile report is printed
through ProLink II, and will appear on the default printer for the PC. All totals are
automatically reset in preparation for the next bunker transfer. If Systemic Holdup is
non-zero, it is applied now.
5.To view transfer data, see the bunker ticket. To determine the total amount
transferred, see the following table.
Bunker transfer total from bunker ticketTable 5-2:
Flow Direction set-
Installation
Shore facility or
vessel
BargeBi-directionalTransfer in same
tingBunker transfer total
Forward Only or
Negate Forward
Any of the following:
• Mass Total
• Mass in Air
• Bunker End Forward Inv − Bunker Begin Forward Inv
• End Fwd Inv Air − Begin Fwd Inv Air
direction as Flow
Direction arrow
on sensor
Bunker End Forward Inv − Bunker Begin Forward Inv
or
End Fwd Inv Air − Begin Fwd Inv Air
52Micro Motion® Marine Bunker Transfer Package
Bunker transfer total from bunker ticket (continued)Table 5-2:
Flow Direction set-
Installation
tingBunker transfer total
Transfer in opposite direction
from Flow Direction arrow on sensor
5.2.1Systemic Holdup
Systemic Holdup is a site-specific value that is calculated and configured during
commissioning by the Micro Motion technician. It represents the amount of process fluid
that may exist between the meter and the transfer point, or in the pipeworks, that cannot
be measured by the meter because it has not flowed through the sensor.
When totals are reset at the end of a bunker transfer, in preparation for the next transfer,
the Mass Total value is adjusted by the configured value of Systemic Holdup. Therefore, the
value of Mass Total at the beginning of the transfer may not be 0.0.
Operate the system from the transmitter display
Bunker End Reverse Inv − Bunker Begin Reverse Inv
or
End Rev Inv Air − Begin Rev Inv Air
Restriction
Systemic Holdup is not applicable to installations that use bi-directional measurement. These
installations are typically barges. For all installations of this type, the value of Mass Total at the
beginning of the transfer should always be 0.0.
The need for Systemic Holdup can be eliminated by good bunkering practices: Always have
the pipeworks in the same state before and after the bunker transfer: either full/full or
empty/empty.
Important
If you need to change the setting of Systemic Holdup, or if you want to change your bunkering
procedures in a way that affects the fullness of the pipeworks before or after a bunker transfer,
contact Micro Motion.
5.3Marine Bunkering dashboard during bunker
transfer
During a bunker transfer, the Marine Bunkering dashboard displays process variables that
track the transfer.
Process variables on Marine Bunkering dashboardTable 5-3:
ParameterDescriptionComments
Mass Flow RateCurrent value of the process variable
Application Manual 53
Operate the system from the transmitter display
Process variables on Marine Bunkering dashboard (continued)Table 5-3:
ParameterDescriptionComments
Mass TotalCurrent value of the process variableMeasured since the last time the totals
were reset (totals are reset automatically
when an original ticket is printed or the
Reset button is pressed).
Aeration Limit FailMeasurement accuracy value for the current mass to-
tal, expressed as a percentage of the maximum allowable measurement error as defined by OIML/MID
Medium Aeration
Limit
High Aeration Limit• ON: The current value of Aeration Limit is above 75%
API DensityCurrent value of the process variable
TemperatureCurrent value of the process variable
Drive GainCurrent value of the diagnostic variable
Field Verify ZeroCurrent value of the diagnostic variable
• ON: The current value of Aeration Limit is above 20%
• OFF: The current value of Aeration Limit is below 20%
• OFF: The current value of Aeration Limit is below 75%
Not displayed until the transfer reaches
Minimum Measured Quantity (MMQ).
20% is the default value. It can be
changed by changing the value of HI PV
defined for Discrete Event 1.
75% is the default value. It can be
changed by changing the value of HI PV
defined for Discrete Event 2.
5.4Process variables during a bunker transfer
Due to the algorithms used to calculate the marine bunkering process variables, the
transmitter may temporarily display values that do not reflect the current process.
Aeration Limit
Aeration Limit is not shown on the transmitter display until the transfer total reaches 20% of
MMQ.
At the beginning of the transfer, the end of the transfer, and any time that the flow rate is
near 0, Aeration Limit may be very high. The overall effect on measurement accuracy is
insignificant unless the flow rate was near 0 for extended periods.
Volume totals and inventories
Volume Inventory is calculated from the real-time density data, and the inventory starts
counting when the bunker starts.
Volume Total, Gross Volume Total, and Net Volume Total are calculated from average density
data. Average density data is not calculated until the first ton of fluid has been measured.
Until that time, these process variables are reported as 0. After one ton of fluid has been
measured, the totalizer starts counting, applying the average density data to the
measured mass and continuing forward.
54Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
5.5Process noise due to vibration
Vibration generated by an external influence (for example, a pump) can influence the
current meter measurement. Overall bunker accuracy and long-term measurement
accuracy are not affected.
There are isolated instances when a specific vibration generated from an external influence
(a pump, for instance) can influence the meter measurement. The interference causes a
sinusoidal noise on the meter signal, although it does not affect the long-term accuracy of
the meter.
If the interference is present, it is easily diagnosed by logging the mass flow rate using
ProLink II, ProLink III, or a similar tool. Instead of a very stable mass flow signal, you will see
a signal that has a very distinct sinusoidal characteristic. The amplitude of the noise will be
less than approximately 1% of nominal flow rate. (For nominal flow rates, refer to the
product data sheet for your sensor.)
If you observe measurement disturbances that may be caused by external vibration,
consult the factory for assistance.
5.6Contents of bunker ticket for Basic and Profile
systems
Note
Some items are optional and are printed only if selected during ticket configuration.
Contents of bunker ticket for Basic and Profile systemsTable 5-4:
Ticket itemDescription
Micro Motion Inc, Business Unit of EmersonBanner printed at top of ticket
Header 1User-defined text
Header 2User-defined text
Transmitter Tag NameUser-configured string
System IDHART software tag configured in the transmitter
BOL NumberBill of Lading number, assigned automatically by the transmitter
Reset TimeDate and time that totals were reset, either by printing an original ticket or by
pressing Reset
Print TimeDate and time that the original ticket was printed
Bunker Begin TimeDate and time that the transmitter started bunker measurement
Bunker End TimeDate and time that the transmitter stopped bunker measurement
Mass TotalTotal mass of bunker, as measured by transmitter
Mass in AirTotal mass of bunker multiplied by the Mass in Air conversion factor
Mass InventoryTotal mass of all bunkers transferred since the last inventory reset
Application Manual 55
Operate the system from the transmitter display
Contents of bunker ticket for Basic and Profile systems (continued)Table 5-4:
Ticket itemDescription
Bunker Begin Forward InventoryValue of Mass Forward Inventory at the beginning of the bunker transfer
Bunker End Forward InventoryValue of Mass Forward Inventory at the end of the bunker transfer
Bunker Begin Reverse InventoryValue of Mass Reverse Inventory at the beginning of the bunker transfer
Bunker End Reverse InventoryValue of Mass Reverse Inventory at the end of the bunker transfer
Begin Forward Inventory AirValue of Mass Forward Inventory at the beginning of the bunker transfer, multi-
plied by the Mass in Air conversion factor
End Forward Inventory AirValue of Mass Forward Inventory at the end of the bunker transfer, multiplied
by the Mass in Air conversion factor
Begin Reverse Inventory AirValue of Mass Reverse Inventory at the beginning of the bunker transfer, multi-
plied by the Mass in Air conversion factor
End Reverse Inventory AirValue of Mass Reverse Inventory at the end of the bunker transfer, multiplied
by the Mass in Air conversion factor
Gross Volume TotalTotal volume of the bunker, calculated from the mass total and the average
density of the bunker at process temperature. The mass total is based on both
aerated and non-aerated flow. The average density is based on non-aerated
flow. For this calculation, aerated flow is defined as any flow occurring while
drive gain exeeds a preset limit or density exceeds preset limits.
Net Volume TotalTotal volume of the bunker, calculated from the mass total and the average
density of the bunker, corrected to 15 °C. The mass total is based on both aerated and non-aerated flow. The average density is based on non-aerated flow.
For this calculation, aerated flow is defined as any flow occurring while drive
gain exeeds a preset limit or density exceeds preset limits.
Average TemperatureAverage temperature of bunker, calculated as batch-weighted average with
the configured volume unit used as the batch
Average API DensityAverage density of the bunker, corrected to reference temperature
Aeration LimitValue of Aeration Limit at the end of the bunker transfer
Alarm Occurred• Yes: One or more bunker-critical alarms was posted during the bunker
transfer
• No: No bunker-critical alarm was posted during the bunker transfer
Aeration Limit• Pass: The value of Aeration Limit at the end of the transfer was within good-
practice limits
• Fail: The value of Aeration Limit at the end of the transfer was not within
good-practice limits
Minimum Quantity• Pass: Mass Total ≥ MMQ (Minimum Measured Quantity)
• Fail: Mass Total < MMQ
No Power Interrupt• Pass: No power reset occurred during bunker transfer
• Fail: Power reset occurred during bunker transfer
Overall Bunker ResultsRepresents the combined results of the four OIML/MID checks:
• Pass: The bunker transfer measurement passed all four checks, and meets
good-practice requirements.
• Fail: The bunker transfer measurement failed one or more checks, and does
not meet good-practice requirements.
56Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
Contents of bunker ticket for Basic and Profile systems (continued)Table 5-4:
Ticket itemDescription
Mass in Air footerStatement of the Mass in Air conversion factor
IMPORTANT: Attach this ticket to BDN Report
FooterUser-defined text
OriginalPrinted automatically on the first printed ticket
CopyPrinted automatically on the second or third ticket
Duplicate ReceiptPrinted automatically on all duplicate (reprinted) tickets
SECURITY BREACH
Not A Legal Receipt
Banner printed at bottom of ticket
Banner printed at bottom of ticket if a security breach occurred during the
transfer
5.6.1Sample bunker tickets for Basic and Profile systems
These examples show bunker tickets for Basic and Profile systems, under different
configurations and different Pass/Fail conditions. The date and time values are based on
the transmitter date and time.
Example: Basic or Profile ticket: Print no optional items
In the following sample ticket, the system is configured to print no optional items. The
SPRING TC parameters are enabled.
Note
The ticket does not indicate whether the bunker transfer passed or failed any of the four checks. This
may or may not be significant in your installation.
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
26-MAR-2011 17:14:49
Print Time
26-MAR-2011 17:17:46
Bunker Begin Time
26-MAR-2011 17:15:21
Bunker End Time
26-MAR-2011 18:17:17
Application Manual 57
Operate the system from the transmitter display
Mass Total
32.9801 t
IMPORTANT: Attach this
ticket to BDN Report
[Footer]
Original
Example: Basic or Profile ticket: Print Mass Inventory
In the following sample ticket, the system is configured to print Mass Inventory. The SPRING
TC parameters are enabled. The forward and reverse inventories are printed automatically.
A small amount of reverse flow occurred.
Note
The ticket does not indicate whether the bunker transfer passed or failed any of the four checks. This
may or may not be significant in your installation.
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
26-MAR-2011 17:14:49
Print Time
26-MAR-2011 17:17:46
Bunker Begin Time
26-MAR-2011 17:15:21
Bunker End Time
26-MAR-2011 18:17:17
Mass Total
32.9801 t
Mass Inventory
1432.2420 t
Bunker Begin Fwd Inv
1420.3915 t
Bunker End Fwd Inv
1452.3817 t
Bunker Begin Rev Inv
1403.6547 t
Bunker End Rev Inv
1403.6710 t
IMPORTANT: Attach this
58Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
ticket to BDN Report
[Footer]
Original
Example: Basic or Profile ticket: Print all optional items; bunker transfer passed
In the following sample ticket, the system is configured to print all optional items. The
SPRING TC parameters are enabled. The bunker transfer passed all four checks.
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
26-MAR-2011 17:14:49
Print Time
26-MAR-2011 17:17:46
Bunker Begin Time
26-MAR-2011 17:15:21
Bunker End Time
26-MAR-2011 18:17:17
Mass in Air
32.9446 t
Mass Inventory
1432.2420 t
Begin Fwd Inv Air
1420.3915 t
End Fwd Inv Air
1452.3817 t
Begin Rev Inv Air
1403.6547 t
End Rev Inv Air
1403.6710 t
Gross Volume Total
32.9801 t
Net Volume Total
32.7492 t
Average Temperature
98.35 degF
Average API Density
0.93132 g/cm3
Aeration Limit
0.0029 %
Overall Bunker: Pass
The mass vacuum to mass air
conversion factor is: 0.998925
Application Manual 59
Operate the system from the transmitter display
IMPORTANT: Attach this
ticket to BDN Report
[Footer]
Original
Example: Basic or Profile ticket: Print all optional items; bunker transfer failed
In the following sample ticket, the system is configured to print all optional items. The
SPRING TC parameters are enabled. The bunker transfer failed one of the four checks (the
MMQ check).
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
The mass vacuum to mass air
conversion factor is: 0.998925
IMPORTANT: Attach this
ticket to BDN Report
[Footer]
Original
5.7Contents of bunker ticket for Basic/MID and
Profile/MID systems
Note
Some items are optional and are printed only if selected during ticket configuration.
Contents of bunker ticket for Basic/MID and Profile/MID systemsTable 5-5:
Ticket itemDescription
*Approved Measurement*Banner printed at top and bottom of ticket if Overall Bunker = Pass
Micro Motion Inc, Business Unit of EmersonBanner printed at top of ticket
Header 1User-defined text
Header 2User-defined text
Transmitter Tag NameUser-configured string
System IDHART software tag configured in the transmitter
BOL NumberBill of Lading number, assigned automatically by the transmitter
Reset TimeDate and time that totals were reset, either by printing an original ticket or by
pressing Reset
Print TimeDate and time that the original ticket was printed
Bunker Begin TimeDate and time that the transmitter started bunker measurement
Bunker End TimeDate and time that the transmitter stopped bunker measurement
Mass TotalTotal mass of bunker, as measured by transmitter
Mass in AirTotal mass of bunker multiplied by the Mass in Air conversion factor
Mass InventoryTotal mass of all bunkers transferred since the last inventory reset
Bunker Begin Forward InventoryValue of Mass Forward Inventory at the beginning of the bunker transfer
Bunker End Forward InventoryValue of Mass Forward Inventory at the end of the bunker transfer
Bunker Begin Reverse InventoryValue of Mass Reverse Inventory at the beginning of the bunker transfer
Bunker End Reverse InventoryValue of Mass Reverse Inventory at the end of the bunker transfer
Begin Forward Inventory AirValue of Mass Forward Inventory at the beginning of the bunker transfer, multi-
plied by the Mass in Air conversion factor
Application Manual 61
Operate the system from the transmitter display
Contents of bunker ticket for Basic/MID and Profile/MID systems (continued)Table 5-5:
Ticket itemDescription
End Forward Inventory AirValue of Mass Forward Inventory at the end of the bunker transfer, multiplied
by the Mass in Air conversion factor
Begin Reverse Inventory AirValue of Mass Reverse Inventory at the beginning of the bunker transfer, multi-
plied by the Mass in Air conversion factor
End Reverse Inventory AirValue of Mass Reverse Inventory at the end of the bunker transfer, multiplied
by the Mass in Air conversion factor
Gross Volume TotalTotal volume of the bunker, calculated from the mass total and the average
density of the bunker at process temperature. The mass total is based on both
aerated and non-aerated flow. The average density is based on non-aerated
flow. For this calculation, aerated flow is defined as any flow occurring while
drive gain exeeds a preset limit or density exceeds preset limits.
Net Volume TotalTotal volume of the bunker, calculated from the mass total and the average
density of the bunker, corrected to 15 °C. The mass total is based on both aerated and non-aerated flow. The average density is based on non-aerated flow.
For this calculation, aerated flow is defined as any flow occurring while drive
gain exeeds a preset limit or density exceeds preset limits.
Average TemperatureAverage temperature of bunker, calculated as batch-weighted average with
the configured volume unit used as the batch
Average API DensityAverage density of the bunker, corrected to reference temperature
Aeration LimitValue of Aeration Limit at the end of the bunker transfer
Alarm Occurred• Yes: One or more bunker-critical alarms was posted during the bunker
transfer
• No: No bunker-critical alarm was posted during the bunker transfer
Aeration Limit• Pass: The value of Aeration Limit at the end of the transfer was within OIML/
MID limits
• Fail: The value of Aeration Limit at the end of the transfer was not within
OIML/MID limits
Minimum Quantity• Pass: Mass Total ≥ MMQ (Minimum Measured Quantity)
• Fail: Mass Total < MMQ
No Power Interrupt• Pass: No power reset occurred during bunker transfer
• Fail: Power reset occurred during bunker transfer
Overall OIML R117-1 AccuracyRepresents the combined results of the four OIML/MID checks:
• Pass: The bunker transfer measurement passed all four checks, and meets
OIML/MID requirements.
• Fail: The bunker transfer measurement failed one or more checks, and does
not meet OIML/MID requirements.
"Accuracy within x.x%Statement of measurement accuracy for the bunker transfer
MID Certificate #Certificate number for this Micro Motion system, obtained and configured dur-
ing commissioning
Mass in Air footerStatement of the Mass in Air conversion factor
IMPORTANT: Attach this ticket to BDN Report
Banner printed at bottom of ticket
62Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
Contents of bunker ticket for Basic/MID and Profile/MID systems (continued)Table 5-5:
Ticket itemDescription
FooterUser-defined text
OriginalPrinted automatically on the first printed ticket
CopyPrinted automatically on the second or third ticket
Duplicate ReceiptPrinted automatically on all duplicate (reprinted) tickets
SECURITY BREACH
Not A Legal Receipt
Banner printed at bottom of ticket if a security breach occurred during the
transfer
5.7.1Sample bunker tickets for Basic/MID and Profile/MID
systems
These examples show bunker tickets for Basic/MID and Profile/MID systems, under
different configurations and different Pass/Fail conditions. The date and time values are
based on the transmitter date and time.
Example: Basic/MID and Profile/MID tickets: Print no optional items; bunker transfer
passed; no security breach occurred
In the following sample ticket, the system is configured to print no optional items. The
SPRING TC parameters are enabled. The bunker transfer met OIML/MID requirements, and
no security breach occurred.
*Approved Measurement*
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
10-JAN-2012 9:48:53
Print Time
10-JAN-2012 9:51:37
Bunker Begin Time
10-JAN-2012 9:51:14
Bunker End Time
10-JAN-2012 9:51:30
Mass Total
*7.1317 t*
MID Cert#: xxxx
Application Manual 63
Operate the system from the transmitter display
*Approved Measurement*
IMPORTANT: Attach this
ticket to BDN Report
[Footer]
Original
Example: Basic/MID and Profile/MID tickets: Print Mass Inventory; bunker transfer
passed; no security breach occurred
In the following sample ticket, the system is configured to print Mass Inventory. The SPRING
TC parameters are enabled. The forward and reverse inventories are printed automatically.
No reverse flow occurred. The bunker transfer met OIML/MID requirements, and no
security breach occurred.
*Approved Measurement*
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
10-JAN-2012 9:48:53
Print Time
10-JAN-2012 9:51:37
Bunker Begin Time
10-JAN-2012 9:51:14
Bunker End Time
10-JAN-2012 9:51:30
Mass Total
*6.2995 t*
Mass Inventory
6034.5977 t
Bunker Begin Fwd Inv
6218.1221 t
Bunker End Fwd Inv
6224.4219 t
Bunker Begin Rev Inv
196.3344 t
Bunker End Rev Inv
196.3344 t
MID Cert#: xxxx
*Approved Measurement*
IMPORTANT: Attach this
64Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
ticket to BDN Report
[Footer]
Original
Example: Basic/MID and Profile/MID tickets: Print no optional items; security breach
occurred
In the following sample ticket, the system is configured to print no optional items. The
SPRING TC parameters are enabled. A security breach occurred.
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
10-JAN-2012 9:51:49
Print Time
10-JAN-2012 9:52:40
Bunker Begin Time
10-JAN-2012 9:52:17
Bunker End Time
10-JAN-2012 9:52:33
Mass Total
7.2606 t
MID Cert#: xxxx
IMPORTANT: Attach this
ticket to BDN Report
[Footer]
Original
SECURITY BREACH
Not A Legal Receipt
Example: Basic/MID and Profile/MID tickets: Print all optional items; bunker transfer
passed; no security breach
In the following sample ticket, the system is configured to print all optional items. The
SPRING TC parameters are enabled. The bunker transfer met OIML/MID requirements and
no security breach occurred. No reverse flow occurred.
*Approved Measurement*
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
Application Manual 65
Operate the system from the transmitter display
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
10-JAN-2012 9:52:52
Print Time
10-JAN-2012 9:54:36
Bunker Begin Time
10-JAN-2012 17:15:21
Bunker End Time
10-JAN-2012 18:17:17
Mass in Air
6.2995 t
Mass Inventory
6034.5977 t
Begin Fwd Inv Air
6218.1221 t
End Fwd Inv Air
6224.4219 t
Begin Rev Inv Air
196.3344 t
End Rev Inv Air
196.3344 t
Gross Volume Total
0.0000 m3
Net Volume Total
6034.4111 m3
Average Temperature
98.63 degF
Average API Density
0.93132 g/cm3
Aeration Limit
71.42876 %
Overall OIML R117-1 Accuracy: Pass
*Accuracy within 0.5%
MID Cert#: xxxx
The mass vacuum to mass air
conversion factor is: 0.998925
*Approved Measurement*
IMPORTANT: Attach this
ticket to BDN Report
[Footer]
Original
66Micro Motion® Marine Bunker Transfer Package
Operate the system from the transmitter display
Example: Basic/MID and Profile/MID tickets: Print all optional items; bunker transfer
failed; no security breach
In the following sample ticket, the system is configured to print all optional items. The
SPRING TC parameters are enabled. No reverse flow occurred. The bunker transfer failed
one of the four checks (the MMQ check) and did not meet OIML/MID requirements.
Micro Motion Inc, Business Unit of Emerson
[Header 1]
[Header 2]
[Transmitter Tag]
System ID: [HART ID]
BOL Number: [xx]
Reset Time
10-JAN-2012 9:54:51
Print Time
10-JAN-2012 9:55:42
Bunker Begin Time
10-JAN-2012 o9:55:30
Bunker End Time
10-JAN-2012 9:55:35
Mass in Air
32.9446 t
Mass Inventory
6036.6841 t
Begin Fwd Inv Air
6224.4219 t
End Fwd Inv Air
6226.5063 t
Begin Rev Inv Air
196.3344 t
End Rev Inv Air
196.3344 t
Gross Volume Total
0.0000 m3
Net Volume Total
6036.4980 m3
Average Temperature
98.63 degF
Average API Density
0.93132 g/cm3
Aeration Limit
71.4286 %
Alarm Occurred: No
Aeration Limit: Pass
Minimum Quantity: Fail
No Power Interrupt: Pass
Overall OIML R117-1 Accuracy: Fail
Application Manual 67
Operate the system from the transmitter display
MID Cert#: xxxx
The mass vacuum to mass air
conversion factor is: 0.998925
IMPORTANT: Attach this
ticket to BDN Report
[Footer]
Original
5.8Retrieve and reprint bunker tickets using the
transmitter display
Ticket data for the five previous bunker transfers is stored on the transmitter. You can
retrieve the data for viewing, and you can print duplicate tickets. You can also use this
function to recover from print failures.
1.At the Marine Bunkering dashboard, choose Bunker Ticket Log.
Tip
If you are not at the Marine Bunkering dashboard, press the Exit button as required until the
Marine Bunkering dashboard is displayed.
Up to five tickets are listed, by BOL number. The most recent is listed first. For each
ticket:
• (P): The ticket has been printed successfully.
• (F): The ticket has not been printed successfully.
2.Select a ticket.
3.Use the Up Arrow and Down Arrow buttons to view all ticket data.
4.If desired, press Print to print the selected ticket. If profile data was collected during
the bunker transfer and ProLink II is currently connected, you can also print a
duplicate profile report.
If the ticket has previously been printed, the new ticket will be a duplicate ticket and
the “Duplicate Receipt” banner is automatically added to the ticket. If the ticket has
not been previously printed, the banner is not added to the ticket.
Important
• The ticket will be printed with the current settings for Header, Footer, and Number of Tickets.
• The ticket will be printed according to the currently configured bunker ticket options
(Bunker Result, Bunker Result Details, Mass In Air, etc.).
68Micro Motion® Marine Bunker Transfer Package
Use ProLink II with the Marine Bunkering Transfer Package
6Use ProLink II with the Marine
Bunkering Transfer Package
Topics covered in this chapter:
•Configure bunker ticket options using ProLink II
•Transfer a bunker using ProLink II
•Print or reprint a bunker ticket using ProLink II
•View bunker transfer history
•Contents of profile report
•Print or export bunker transfer data using ProLink II
•Maintain bunker transfer history
6.1Configure bunker ticket options using
ProLink II
You can use ProLink II to configure the bunker ticket contents and printing options. The
configuration parameters are stored in the transmitter, and will overwrite the existing
ticket configuration.
Tip
These parameters are typically set during system startup and should not require changing.
Prerequisites
To configure bunker ticket options, the transmitter must be unsecured.
The transmitter must be ready to accept a connection from ProLink II. If you have trouble
making the connection:
•Ensure that communications have been configured for a Profile or Profile/MID
system.
•Ensure that the RS-485 terminals are in RS-485 mode, rather than service port
mode.
Procedure
1.Connect from ProLink II to the transmitter.
a. Start ProLink II.
b. Click Connection > Connect to Device .
c. Set Protocol, Baud Rate, Parity, and Stop Bits to the values configured in the
transmitter.
Application Manual 69
Use ProLink II with the Marine Bunkering Transfer Package
d. Set Serial Port to the PC port you are using for the connection.
e. Set Address to the value configured for the transmitter. The default address is 1.
f. Click Connect.
If the connection is successful, the Marine Bunkering window is displayed.
Tip
To open the Marine Bunkering window, if you have closed it, choose Tools > Marine Bunker
Transfer.
2.Select the Configuration panel in the Marine Bunkering window.
3.In the Ticket Process Information group, select all items that you want to be
included on the ticket.
OptionDescription
Aeration LimitValue of Aeration Limit at the end of the bunker transfer.
Bunker Re-
(1)
sult
Gross Volume
Total
Mass Inventory Total mass of all bunkers transferred since the last inventory reset, plus the
Bunker Result
Details
Net Volume
Total
Average Temperature
Pass: The bunker transfer passed all four OIML/MID checks.
Fail: The bunker transfer failed one or more of the four OIML/MID checks.
Total volume of the bunker, calculated from the mass total and the average
density of the bunker at process temperature. The mass total is based on
both aerated and non-aerated flow. The average density is based on non-aerated flow. For this calculation, aerated flow is defined as any flow occurring
while drive gain exeeds a preset limit or density exceeds preset limits.
two forward inventories and the two reverse inventories. Labels and values
depend on the setting of the Mass In Air option.
Individual results for the four OIML/MID checks:
• MMQ check
• Max Aeration check
• Alarm check
• Power check
These are printed only if Bunker Result = Fail.
Total volume of the bunker, calculated from the mass total and the average
density of the bunker, corrected to 15 °C. The mass total is based on both
aerated and non-aerated flow. The average density is based on non-aerated
flow. For this calculation, aerated flow is defined as any flow occurring while
drive gain exeeds a preset limit or density exceeds preset limits.
Temperature of the process fluid, averaged across the entire bunker and expressed as a batch-weighted average with the configured volume unit used
as the batch.
70Micro Motion® Marine Bunker Transfer Package
Use ProLink II with the Marine Bunkering Transfer Package
OptionDescription
Mass In AirON: The total and inventory values on the ticket represent “mass in air,” and
the Mass in Air conversion factor is printed on the ticket. The following labels
are used:
• Mass in Air
• Begin Fwd Inv Air
• End Fwd Inv Air
• Begin Rev Inv Air
• End Rev Inv Air
OFF: The total and inventory values on the ticket represent “true mass,” or
“mass in vacuum.” The following labels are used:
• Mass Total
• Bunker Begin Fwd Inv
• Bunker End Fwd Inv
• Bunker Begin Rev Inv
• Bunker End Rev Inv
Average API
Density
SPRING TC
Parameters
Average density of the bunker, at reference temperature.
ON: All ticket data is printed as configured.
OFF: The following items are not printed, whether or not they were configured:
• “Approved Measurement” banner
• Gross Volume Total
• Net Volume Total
• Average API Density
• Average Temperature
• Aeration Limit
• Bunker Result
• Bunker Result Details
• MID Certificate Number
• Measurement accuracy statement
If SPRING TC Parameters is set to OFF, the bunker ticket cannot be used as a
legal receipt.
(1) For Basic/MID and Profile/MID systems, Bunker Results is enabled and cannot be disabled.
Note
Certain items are always included on the ticket, and cannot be disabled.
4.Configure headers, footers, and related parameters.
a. In the Header and Footer group, configure Header Line 1, Header Line 2, and Footer
to the text to be printed on the ticket.
b. Set Header Font Size and Footer Font Size to the font height to be used on the ticket.
Application Manual 71
Use ProLink II with the Marine Bunkering Transfer Package
Tip
You can change the header and footer parameters while the transmitter is secured. This
allows you to use them for bunker-specific information if desired (for example, vessel name,
purchaser name, and so on).
5.Set Number of Tickets to the number of tickets to be printed with one print command.
The default value is 3. The range is 1 to 3.
On the first ticket, the word “Original” is printed at the bottom of the ticket. On the
second and third tickets, the word “Copy” is printed at the bottom of the ticket.
Tip
You can change the Number of Tickets setting while the transmitter is secured.
6.2Transfer a bunker using ProLink II
This procedure guides you through transferring a bunker, collecting profile data, and
printing a bunker ticket and/or a profile report, using ProLink II. For Profile systems, ticket
printing is optional. For Profile/MID systems, ticket printing is required.You can also print a
line graph of four process variables.
Tip
If you want to print bunker-specific information on the bunker ticket, e.g., the vessel name, you can
change the settings of Header 1, Header 2, and Footer while the transmitter is secured. You can also
change the setting of Number of Tickets while the transmitter is secured.
Prerequisites
To print a bunker ticket, your system must include a ticket printer.
Ensure that the transmitter is secured.
Ensure that you are complying with all other applicable procedures, e.g., procedures for
your barge or vessel, procedures for OIML/MID compliance, etc.
Ensure that Mass Flow Rate is 0.0.
Check startup values:
•Shore facilities and vessels: Ensure that Mass Total is 0.0, or the site-specific Systemic
Holdup value that was configured for your system during commissioning. If it is not,
press the Print button to reset the totals.
•Barges: Ensure that Mass Total is 0.0. If it is not, press the Print button to reset the
totals. If this does not correct the problem, contact Micro Motion.
Tip
If your system does not include a ticket printer, a Reset button is displayed instead of the Print button.
Press Reset to reset the totals.
72Micro Motion® Marine Bunker Transfer Package
Use ProLink II with the Marine Bunkering Transfer Package
Take appropriate precautions to ensure that flow occurs in only one direction during the
bunker transfer. Small amounts of backflow due to valve action or other mechanical issues
are insignificant, but larger amounts will affect measurement accuracy.
During the bunker transfer, take appropriate steps to ensure that Mass Flow Rate does not
hover around 0. Very low values for Mass Flow Rate can affect measurement accuracy. Low
values for Mass Flow Rate at the beginning and end of the bunker transfer have insignificant
effects.
The transmitter must be ready to accept a connection from ProLink II. If you have trouble
making the connection:
•Ensure that communications have been configured for a Profile or Profile/MID
system.
•Ensure that the RS-485 terminals are in RS-485 mode, rather than service port
mode.
Procedure
1.Connect from ProLink II to the transmitter.
a. Start ProLink II.
b. Click Connection > Connect to Device .
c. Set Protocol, Baud Rate, Parity, and Stop Bits to the values configured in the
transmitter.
d. Set Serial Port to the PC port you are using for the connection.
e. Set Address to the value configured for the transmitter. The default address is 1.
f. Click Connect.
If the connection is successful, the Marine Bunkering window is displayed.
Tip
To open the Marine Bunkering window, if you have closed it, choose Tools > Marine Bunker
Transfer.
2.Start flow and totalizers.
If you have installed and configured the system as recommended, totalizers will be
started automatically when liquid is detected in the pipeline. If a transmitter power
cycle has occurred, totalizing does not begin until system startup procedures are
complete.
3.Use the Monitor panel in the Marine Bunkering window to observe process data.
The Monitor panel displays current values of six process variables, and a line graph of
four process variables.
Tip
You can use Drive Gain to track aeration (entrained gas or entrained air) during the bunker
transfer. Drive Gain is a measure of the energy required to vibrate the sensor tubes to full
amplitude. When aeration is present, more energy is required and the drive gain increases
Application Manual 73
Use ProLink II with the Marine Bunkering Transfer Package
dramatically. The maximum value of Drive Gain is 100%. Note that other process and
equipment conditions can cause result in higher Drive Gain values. For more information, see
Micro Motion Series 3000 MVD Transmitters and Controllers: Configuration and Use Manual .
4.(Optional) To print the line graph from the Marine Bunkering window while a bunker
transfer is in progress, click Print Graph.
5.To end the bunker transfer:
a. Stop flow.
b. Click the Print Ticket button on the Monitor panel.
If your system does not include a ticket printer, a Reset button is displayed
instead of the Print Ticket button. Click Reset to end the transfer.
The Print Ticket and Reset buttons in ProLink II have the same functions as the Print and
Reset buttons on the face of the transmitter. Totals are reset and a bunker ticket is
printed (if a ticket printer is available). If Systemic Holdup is non-zero, it is applied now.
6.(Optional) To preview or print a profile report, click the Preview button or the Print
Report button on the Monitor panel.
These buttons are not available until a ticket has been printed. You may need to wait
a few seconds after clicking Print Ticket.
6.3Print or reprint a bunker ticket using ProLink II
You can print or reprint the bunker ticket for any bunker transfer in the ProLink II bunkering
database. You can use this function to recover from print failures.
1.Connect ProLink II to the transmitter.
2.Select the History panel in the Marine Bunkering window.
3.Select the desired transfer record from Historical Transfer Log Index.
Transfer records are ordered by timestamp. Historical Transfer 1 is the most recent
bunker transfer.
4.Click Print Ticket to print or reprint a ticket.
If the ticket has previously been printed, the new ticket will be a duplicate ticket and the
“Duplicate Receipt” banner is automatically added to the ticket. If the ticket has not been
previously printed, the banner is not added to the ticket.
Important
•The ticket will be printed with the current settings for Header, Footer, and Number of Tickets.
•The ticket will be printed according to the currently configured bunker ticket options (Bunker
Result, Bunker Result Details, Mass In Air, etc.).
74Micro Motion® Marine Bunker Transfer Package
Use ProLink II with the Marine Bunkering Transfer Package
6.4View bunker transfer history
You can view history data for all bunker transfers that are recorded in the ProLink II
bunkering database. The bunkering database can store data for up to five bunker transfers.
Prerequisites
The transmitter must be ready to accept a connection from ProLink II. If you have trouble
making the connection:
•Ensure that communications have been configured for a Profile or Profile/MID
system.
•Ensure that the RS-485 terminals are in RS-485 mode, rather than service port
mode.
Procedure
1.Connect from ProLink II to the transmitter.
a. Start ProLink II.
b. Click Connection > Connect to Device .
c. Set Protocol, Baud Rate, Parity, and Stop Bits to the values configured in the
transmitter.
d. Set Serial Port to the PC port you are using for the connection.
e. Set Address to the value configured for the transmitter. The default address is 1.
f. Click Connect.
If the connection is successful, the Marine Bunkering window is displayed.
Tip
To open the Marine Bunkering window, if you have closed it, choose Tools > Marine Bunker
Transfer.
2.Select the History panel.
3.Select the desired transfer record from Historical Transfer Log Index.
Transfer records are ordered by timestamp. Historical Transfer 1 is the most recent
bunker transfer.
The History panel is updated with data from the selected transfer record.
4.(Optional) Click Preview or Print to preview or print the profile report for the currently
selected bunker transfer.
Application Manual 75
Use ProLink II with the Marine Bunkering Transfer Package
6.5Contents of profile report
Contents of profile reportTable 6-1:
ItemDescription
Header 1User-defined text
Header 2User-defined text
BOL NumberBill of Lading number, assigned automatically by the transmitter
Reset TimeDate and time that totals were reset, either by printing an original ticket or by
pressing Reset
Print TimeDate and time that the original ticket was printed
Bunker Begin TimeDate and time that the transmitter started bunker measurement
Bunker End TimeDate and time that the transmitter stopped bunker measurement
Mass in AirTotal mass of bunker multiplied by the Mass in Air conversion factor
Mass TotalTotal mass of bunker, as measured by transmitter
Mass InventoryTotal mass of all bunkers transferred since the last inventory reset
Bunker Begin Forward InventoryValue of Mass Forward Inventory at the beginning of the bunker transfer
Bunker End Forward InventoryValue of Mass Forward Inventory at the end of the bunker transfer
Bunker Begin Reverse InventoryValue of Mass Reverse Inventory at the beginning of the bunker transfer
Bunker End Reverse InventoryValue of Mass Reverse Inventory at the end of the bunker transfer
Gross Volume TotalTotal volume of the bunker, calculated from the mass total and the average
density of the bunker at process temperature. The mass total is based on both
aerated and non-aerated flow. The average density is based on non-aerated
flow. For this calculation, aerated flow is defined as any flow occurring while
drive gain exeeds a preset limit or density exceeds preset limits.
Net Volume TotalTotal volume of the bunker, calculated from the mass total and the average
density of the bunker, corrected to 15 °C. The mass total is based on both aerated and non-aerated flow. The average density is based on non-aerated flow.
For this calculation, aerated flow is defined as any flow occurring while drive
gain exeeds a preset limit or density exceeds preset limits.
Average TemperatureAverage temperature of bunker, calculated as batch-weighted average with
the configured volume unit used as the batch
Average API DensityAverage density of the bunker, corrected to reference temperature
Aeration LimitValue of Aeration Limit at the end of the bunker transfer
• Pass: The value of Aeration Limit at the end of the transfer was within OIML/
MID limits
• Fail: The value of Aeration Limit at the end of the transfer was not within
OIML/MID limits
Alarm Occurred• Yes: One or more bunker-critical alarms was posted during the bunker
transfer
• No: No bunker-critical alarm was posted during the bunker transfer
Minimum Quantity• Pass: Mass Total ≥ MMQ (Minimum Measured Quantity)
• Fail: Mass Total < MMQ
76Micro Motion® Marine Bunker Transfer Package
Use ProLink II with the Marine Bunkering Transfer Package
Contents of profile report (continued)Table 6-1:
ItemDescription
No Power Interrupt• Pass: No power reset occurred during bunker transfer
• Fail: Power reset occurred during bunker transfer
Overall Bunker ResultsRepresents the combined results of the four OIML/MID checks:
• Pass: The bunker transfer measurement passed all four checks, and meets
good-practice requirements.
• Fail: The bunker transfer measurement failed one or more checks, and does
not meet good-practice requirements.
Meter Verification Test Results• Pass: The flowmeter passed the most recent meter verification test.
• Fail: The flowmeter failed the most recent meter verification test.
If the Meter Verification application is not present on the transmitter, this item
is blank.
Bunker Profile graphLine graph of Mass Flow Rate, Average Density at Reference Temperature, Temper-
ature, and Drive Gain during the bunker transfer
MID Certificate #Certificate number for this Micro Motion system, obtained and configured dur-
ing commissioning
Mass in Air footerStatement of the Mass in Air conversion factor
FooterUser-defined text
Application Manual 77
Use ProLink II with the Marine Bunkering Transfer Package
6.5.1Sample profile reports
Sample profile report for Profile systemsFigure 6-1:
78Micro Motion® Marine Bunker Transfer Package
Use ProLink II with the Marine Bunkering Transfer Package
Sample profile report for Profile/MID systemsFigure 6-2:
Application Manual 79
Use ProLink II with the Marine Bunkering Transfer Package
6.6Print or export bunker transfer data using
ProLink II
You can print bunker transfer data from the current bunker transfer or from any bunker
transfer in the ProLink II bunkering database. You can export bunker transfer data to
Unicode CSV (comma-separated values) files for use in other applications.
•To print process data for the current bunker transfer:
1. Ensure that ProLink II is connected to the transmitter during the bunker transfer.
2. Select the Monitor panel in the Marine Bunkering window.
3. Click Print Graph (if the transfer is in progress) or Print Report (if the transfer is
complete).
Tip
If you want to change the appearance of the graph before you print it, right-click anywhere on
the graph and use the graphics toolbox that is provided. You can also use the graphics
toolbox to save the graph as an image.
•To print a profile report for a bunker transfer in the bunkering database:
1. Connect ProLink II to the transmitter.
2. Select the History panel in the Marine Bunkering window.
3. Select the desired transfer record from Historical Transfer Log Index.
Transfer records are ordered by timestamp. Historical Transfer 1 is the most recent
bunker transfer.
4. Click Preview to preview the profile report or to export the data to a CSV file.
5. Click Print Report to print the profile report.
Restriction
You cannot use the History panel to print a profile report for the current bunker transfer while
it is in progress. To print a profile report for the current bunker transfer, you must use the
Marine Bunkering dashboard on the transmitter. When the transfer is complete, it is available
from the History panel as Historical Transfer 1.
6.7Maintain bunker transfer history
You can keep bunkering transfer data as long as required by storing it outside the ProLink II
bunkering database.
The ProLink II bunkering database can store data for up to five bunker transfers. When the
database is full, the oldest bunker transfer will be overwritten.
Tip
Be sure to store any required data externally before the bunker transfer is overwritten.
80Micro Motion® Marine Bunker Transfer Package
Use ProLink II with the Marine Bunkering Transfer Package
Procedure
•To keep the profile report data in both TIF format and HTML format, print the profile
report.
A graphics file in TIF format will be created and saved in the location you specify.
Additionally, a set of HTML files is automatically generated and saved on your PC in a
folder named Reports. Reports is located in the ProLink II installation folder. You can
view the report by opening the HTML file in a browser.
•To store the corresponding trend data, export the data for the transfer to a CSV file.
To do this, preview the profile report and click Export to CSV.
Application Manual 81
Use ProLink II with the Marine Bunkering Transfer Package
82Micro Motion® Marine Bunker Transfer Package
Integrated wiring diagrams
Appendix A
Integrated wiring diagrams
Topics covered in this appendix:
•Integrated wiring diagrams for Basic systems
•Integrated wiring diagrams for Basic/MID systems
•Integrated wiring diagrams for Profile systems
•Integrated wiring diagrams for Profile/MID systems
A.1Integrated wiring diagrams for Basic systems
Use these integrated wiring diagrams for Basic systems only. Choose the wiring diagrams
that match the direction of the pipe and the orientation of your sensor.
Use these integrated wiring diagrams for Basic/MID systems only. Choose the wiring
diagrams that match the direction of the pipe and the orientation of your sensor.
Use these integrated wiring diagrams for Profile systems only. Choose the wiring diagrams
that match the direction of the pipe and the orientation of your sensor.