Micro Matic BC-1206-2 Installation Manual

2 Faucet Kegerator Kit
Assembly Instructions
For Models:
BC-1206-2 • BC-1206S-2 • SBC490BI-2 • SBC490BIFR-2 • SBC490BISSTB-2
www.micromatic.com 1-866-291-5756
2 Faucet Kegerator Kit - Assembly Instructions
1
Kit Includes:
2 – 4' Length
5/16" I.D. Gas Hose
1 – 1' Length
5/16" I.D. Gas Hose
6 – Plastic
Snap Clamp
1 – Plastic T for
5/16" I.D. Gas Hose
1 – Single Gauge
CO2 Regulator
1 – 2 Faucet
Beer Tower
1 – Tower
Gasket
1 – Worm
Gear Clamp
2 – American
D System Keg Coupler
Please follow the included manufacturer instructions with the following modications:
1
From Top of Kegerator: Slide tower
gasket over the hex nuts and beer hose up to the base of tower. Drop one (1) beer hose through hole in top of kegerator.
Take second beer hose, cut approximately ½" above hex nut. Remove and discard clamp. Save the hex nut and tailpiece they will be re-used in the next step. Drop second beer hose through hole in kegerator top, alongside rst beer hose.
2
From Inside Kegerator: Insert the tailpiece
into the hex nut, slip the black washer into the base of threaded hex nut. Screw the hex nut onto one of the couplers.
Grab the cut beer hose end, slide on screw clamp and the tailpiece into the beer hose. With the beer hose over the tailpiece, secure screw clamp.
2
3
Mounting Tower: The provided 3"
diameter tower does not line up with the factory provided pilot holes on top of kegerator. Center tower and gasket over hole in kegerator and mark mounting
2 Faucet Kegerator Kit - Assembly Instructions
holes. Drill four (4) 1/8" diameter pilot holes approximately 3/4" deep. Using the 1” wood screws provided, secure tower to kegerator top.
www.micromatic.com
Loading...
+ 2 hidden pages