METRObility Optical Systems DCPS-17HS, ACPS-17HS, R5000 User Manual

Technical Specifications
Input Power
ACPS-17HS ___________________ 100-120/200-240V AC
DCPS-17HS __________________________ 48V DC, 4.9A
Weight
ACPS-17HS ________________________________ 3.25 lb DCPS-17HS ___________________________________ 3 lb
Environmental
Operating Temperature _____________________ 0º to 50º C Storage Temperature _____________________ -30º to 70º C Relative Humidity ___________ 5% to 95% non-condensing Dimensions ______________________ 7.5"L x 7"W x 3.5"H
The information contained in this document is assumed to be correct and current. The manufacturer is not responsible for errors or omissions and reserves the right to change specifications at any time without notice.
This publication is protected by the copyright laws of the United States and other countries, with all rights reserved. No part of this publication may be reproduced, stored in a retrieval system, translated, transcribed, or transmitted, in any form, or by any means manual, electric, electronic, electromagnetic, mechanical, chemical, optical or otherwise, without prior explicit written permission of METRObility Optical Systems, Inc.
___________________________ 50-60Hz, 2A
___________ (19.1cm L x 17.8cm W x 8.9cm H)
© 2001 METRObility Optical Systems, Inc.
All rights reserved. Printed in USA.
Radiance
R5000 Power Supply
I.T.E.
US
C
E116552
LISTED
_________________
PRODUCT SERVICE
Made in
USA
CAUTION
RISK OF ELECTRIC SHOCK, DO NOT OPEN
I.T.E.
US
C
E116552
LISTED
_________________ PRODUCT SERVICE
CAUTION
RISK OF ELECTRIC SHOCK, DO NOT OPEN
PWR
DCPS-17HS
DISCONNECT ALL POWER SOURCES BEFORE SERVICING
DC IN 48V, 4.9A
THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES, OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION.
PWR
ACPS-17HS
DISCONNECT ALL POWER SOURCES BEFORE SERVICING
FACTORY DEFAULT
WARNING
SETTING 115V
THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES, OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION.
AC IN 100-120 / 200-240V 50-60Hz,
Operating Features of the Power Supply
The ACPS-17HS and DCPS-17HS load-sharing power sup­plies are designed for AC and DC power sources, respec­tively. Both power supplies are field-replaceable.
When two power supplies are installed in the Radiance R5000 Central Service Platform, they operate in tandem and share the load. If the power source to one of the supplies fails or is removed, the other power supply automatically provides the entire power load to the platform. This setup provides both the platform and the network with uninterrupted service. It also decreases the demand placed upon an individual power supply, thus prolonging its life.
When the power (PWR) LED on the front panel of the power supply is lit, it indicates that the power supply is turned on, connected to an active power source, and providing power to the platform’s backplane. Because they are load-sharing, when two power supplies are installed and active in a single platform, the LEDs on both supplies are lit simultaneously.
An optional display card is available for vis­ible verification of operating status from the front of the platform. The R500-D, which must be installed in slot 16 or 17, provides two LEDs labeled A and B. When lit, these
2A
LEDs indicate that their corresponding power supplies are installed properly, con­nected to an active power source, turned on, and providing power to the platform’s backplane. When two power supplies are in­stalled and active in a single platform, both LEDs are lit simultaneously.
PWR
A
B
R500-D
Front Panel
Display Card
25 Manchester Street, Merrimack, NH 03054 USA
tel: 603-880-1833 • fax: 603-594-2887
www.metrobility.com
5660-000024 B
Installation and User Guide
Models: ACPS-17HS / DCPS-17HS
Installing the Power Supply
RISK OF ELECTRIC SHOCK, DO NOT OPEN
FACTORY DEFAULT
SETTING 115V
THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES, OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION.
AC IN 100-120 / 200-240V 50-60Hz
2A
CAUTION
WARNING
PWR
ACPS-17HS
DISCONNECT ALL POWER SOURCES BEFORE SERVICING
I.T.E.
E116552
C
LISTED
US
RISK OF ELECTRIC SHOCK, DO NOT OPEN
FACTORY DEFAULT
SETTING 115V
THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES, OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION.
AC IN 100-120 / 200-240V 50-60Hz
2A
CAUTION
WARNING
PWR
ACPS-17HS
DISCONNECT ALL POWER SOURCES BEFORE SERVICING
I.T.E.
E116552
C
LISTED
US
R5000-17HS
_________________ PRODUCT SERVICE
_________________ PRODUCT SERVICE
Follow the steps outlined below to install the ACPS-17HS or DCPS-17HS power supply in the Radiance R5000 Central Service Platform.
IMPORTANT
Disconnect all power sources before
installing or removing the power supply.
A blank panel must remain installed in any
empty power supply slot.
Do not apply power to the power supply
while it is out of the platform.
1. Remove the blank panel from the back of the platform.
2. Insert the power supply into the slot. Do not force it into the platform unnecessarily. It should slide in easily and evenly.
3. Push gently until the face panel is flush with the platform.
4. Turn the thumb screws clockwise and tighten to secure the power supply into the platform.
Applying Power
DC Power Supply (DCPS-17HS)
For DC power supply connections, follow these guidelines:
• Make sure the power switch is in the OFF position (O).
• Remove the plastic safety cover to expose the terminals.
• Connect the wire leads to the appropriate terminals. There is one each for a positive, a negative and a platform ground. To make a connection, loosen the terminal screw, insert the exposed wire, then tighten the screw. If two power supplies have been installed, connect each power supply to a separate power source.
• Replace the plastic safety cover over the terminal block.
• Set the power switch to the ON position (I).
• Verify proper connection and operation via the power (PWR) LED on the power supply front panel. The LED is lit when the power supply is functioning correctly.
Important: The terminal block safety cover must be installed when power is present to prevent burn or energy hazards.
Caution: A fully loaded platform is rated for 4.9A DC maximum current. Make sure that the power supply current available is sufficient to power the platform. Refer to front panel text for voltage/current ratings. The center terminal connector provides grounding for the platform and must be maintained. Particular attention should be given to power supply connections other than direct connections to the branch circuit (e.g. use of power strips).
Note: The DCPS-17HS is designed to protect against overheating. The power supply will go into thermal shut­down mode if it is operated above the specified temperature of 50°C. Normal operation can be reestablished once the temperature drops to the specified range by power cycling the unit.
C
LISTED
_________________ PRODUCT SERVICE
Made in
R5000-17HS
I.T.E.
US
E116552
USA
CAUTION
RISK OF ELECTRIC SHOCK, DO NOT OPEN
PWR
DCPS-17HS
DISCONNECT ALL POWER SOURCES BEFORE SERVICING
DC IN 48V, 4.9A
THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES, OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION.
I.T.E.
C
US
E116552
LISTED
_________________ PRODUCT SERVICE
Made in
USA
CAUTION
RISK OF ELECTRIC SHOCK, DO NOT OPEN
PWR
DCPS-17HS
DISCONNECT ALL POWER SOURCES BEFORE SERVICING
DC IN 48V, 4.9A
THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES, OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION.
AC Power Supply (ACPS-17HS)
The ACPS-17HS includes a standard North American 3-pin power cord which is UL (USA), CSA or CUL (Canada) listed or approved. For installation in regions outside North America, replace the power cord with a cord approved by ap­propriate safety agencies. The cord must have a CEE-22 stan­dard V female connector on one end and meet IEC 320-030 specifications. European power cords must be harmonized and designated with a HAR marking on the outside of the cord jacket to comply with the CENELEC Harmonized Document HD-21.
WARNING
The default voltage setting on the ACPS-17HS is
115V AC. Before applying power, make sure the
voltage switch is set appropriately for the voltage
source in your region.
For AC power supply connections, follow these guidelines:
• Make sure the power switch is in the OFF position (O).
• Plug the AC cord into the connector on the power supply, then insert the other end of the cord into the AC power source. If two power supplies have been installed, connect each power supply to a separate power source.
• Set the power switch to the ON position (I).
• Verify proper connection and operation via the power (PWR) LED on the power supply front panel. The LED is lit when the power supply is functioning correctly.
Caution: A fully loaded platform is rated for 2A AC maximum current. Make sure that the power supply current is sufficient to power the platform. Refer to the front panel text for voltage/current ratings. Reliable grounding of rackmount equipment must be maintained. Particular attention should be given to power supply connections other than direct connections to the branch circuit (e.g. use of power strips).
Replacing the Power Supply
To remove an ACPS-17HS or DCPS-17HS power supply from the Radiance R5000 Central Service Platform, perform the following steps.
IMPORTANT
Follow all precautions described in the box under
“Installing the Power Supply.”
1. Remove the power cord or wire leads from the power supply.
2. Turn the thumb screws counterclockwise to loosen the power supply from the platform.
3. Remove the power supply from the platform.
4. Install another power supply or a blank panel into the empty slot. Refer to “Installing the Power Supply” for installation instructions.
Loading...