Metric Halo 3d Upgrade Board Set Installation Manual

Page 1
MobileI/O
UsersGuide
3d Installation Guide
for ULN-8/LIO-8
Page 2
ULN-8 3d Upgrade Installation Guide
Revision: 1532
Publication date 2017-08-12 12:42:12 -0400 (Fri, 08 Dec 2017) Copyright © 2017 Metric Halo
Page 3
Table of Contents
1. ULN-8/LIO-8 3d Upgrade Installation Guide ................................................................................... 5
Introduction ............................................................................................................................. 5
Required Tools ......................................................................................................................... 5
Installation Kit Components ....................................................................................................... 7
Installation ............................................................................................................................. 10
3
Page 4
List of Figures
1.1. #2 Phillips Head Screwdriver ...................................................................................................... 5
1.2. Nut Driver for DB25 Side Screws ................................................................................................ 6
1.3. Needlenose Pliers ...................................................................................................................... 6
1.4. (Optional) Power Screwdriver ..................................................................................................... 6
1.5. 3d Base Board with Pre-installed CPU Module, MH Clock Board, Rubber Feet on the bottom ........... 7
1.6. ULN-8/LIO-8 3d Back Panel ...................................................................................................... 7
1.7. Bridge Board ............................................................................................................................ 7
1.8. Foam Cap for Bridge Board ....................................................................................................... 8
1.9. AES Gasket Board .................................................................................................................... 8
1.10. 3d Upgrade Kit Matching Labels .............................................................................................. 9
1.11. Top Screw Placement ............................................................................................................ 10
1.12. Side Screw Placement, with Rack Ear ..................................................................................... 10
1.13. Side Screw Placement, No Rack Ear ....................................................................................... 10
1.14. Screws and Nuts to Remove from Back Panel .......................................................................... 11
1.15. Mic In Blank Plate ................................................................................................................ 11
1.16. AES/MIDI Board .................................................................................................................... 12
1.17. (a) AES/MIDI Board Pairing with Gasket Board ........................................................................ 13
1.18. (b) AES/MIDI Board Pairing with Gasket Board ........................................................................ 13
1.19. Detach Ribbon Cable ............................................................................................................ 14
1.20. Legacy Master Board and 2d Board ........................................................................................ 15
1.21. 3d Assembly Installed ........................................................................................................... 16
1.22. Bridge Board Installed ........................................................................................................... 17
1.23. Front Panel Meter Board Reconnected .................................................................................... 18
1.24. (a) AES/MIDI/Gasket Assembly Pin Alignment on 3d Base Board ................................................ 19
1.25. (b) AES/MIDI/Gasket Assembly Pin Alignment on 3d Base Board ............................................... 19
1.26. New Back Panel Placement ................................................................................................... 20
1.27. 3d Front Panel on Power Up ................................................................................................. 20
1.28. Screws and Nuts to Replace on Back Panel ............................................................................. 20
1.29. Foam Cap Applied to Bridge Board ........................................................................................ 21
1.30. Cap to Remove from Power Supply Board .............................................................................. 22
1.31. Cap Removed ....................................................................................................................... 22
1.32. Top Cover Replaced ............................................................................................................. 23
4
Page 5
1. ULN-8/LIO-8 3d Upgrade Installation
Guide
Introduction
A video version of this guide is available here.
You will be working with electronic equipment so we strongly advise you to take the necessary steps to ground yourself and to work in an environment with minimal static to avoid the potential for electrostatic discharge.
Please familiarize yourself with the parts and instructions before proceeding with installation.
Required Tools
You will need the following tools to do the installation:
• #2 Phillips Head Screwdriver
Figure 1.1: #2 Phillips Head Screwdriver
5
Page 6
ULN-8/LIO-8 3d Upgrade Installation Guide
• Nut Driver size 3/16" OR Needlenose Pliers
Figure 1.2: Nut Driver for DB25 Side Screws
Figure 1.3: Needlenose Pliers
• (Optional) Power Screwdriver
Figure 1.4: (Optional) Power Screwdriver
If you choose to use a power screwdriver, set it to the lowest drive setting possible when replacing screws.
6
Page 7
ULN-8/LIO-8 3d Upgrade Installation Guide
Installation Kit Components
The ULN-8/LIO-8 3d Upgrade Installation kit includes the following parts:
• 3d Upgrade Board Set
• New Back Panel
• Bridge Board
Figure 1.5: 3d Base Board with Pre-installed CPU
Module, MH Clock Board, Rubber Feet on the bottom
Figure 1.6: ULN-8/LIO-8 3d Back Panel
Figure 1.7: Bridge Board
7
Page 8
• Foam Cap for Bridge Board
• AES Gasket Board
ULN-8/LIO-8 3d Upgrade Installation Guide
Figure 1.8: Foam Cap for Bridge Board
Figure 1.9: AES Gasket Board
Please familiarize yourself with the parts and instructions before opening your interface.
Be sure to discharge any static energy on your body before touching the interior of the interface.
8
Page 9
ULN-8/LIO-8 3d Upgrade Installation Guide
Each individual upgrade kit has components that are uniquely serialized. Please upgrade one unit at a time.
Make sure that the serial number on 3d card matches the serial number on your back panel.
Figure 1.10: 3d Upgrade Kit Matching Labels
9
Page 10
ULN-8/LIO-8 3d Upgrade Installation Guide
Installation
1. Fully power off, disconnect power supply and all other connections to the unit.
2. Remove the six screws from the top of the case:
Figure 1.11: Top Screw Placement
3. Remove the screws from the left and right sides of the case. If the rack ears are fitted, keep their extra screws separate from the other case screws. Please note that the screws on the rack ears are longer than
the others. Be sure to put the longer screws back in the rack ears when you reassemble the interface.
Figure 1.12: Side Screw Placement, with Rack Ear
If the rack ears are not fitted, there will be three screws per side.
Figure 1.13: Side Screw Placement, No Rack Ear
Remove the top cover.
10
Page 11
ULN-8/LIO-8 3d Upgrade Installation Guide
4. Remove the three screws directly underneath the back panel with a Phillips screwdriver. Remove the two screws around the 4-pin XLR power connector with a Phillips screwdriver.
Remove the four ring nuts. This can typically be done by hand.
Using pliers or a nut driver tool, loosen and remove the 10 DB25 side screws.
Figure 1.14: Screws and Nuts to Remove from Back Panel
5. Slide off the old back panel and set it aside.
6. If upgrading a LIO-8, remove the two screws holding the Mic In cover plate, then remove the plate and replace it over the same hole on the new back panel. If upgrading a ULN-8 or LIO-8 with mic preamps, skip this step.
Figure 1.15: Mic In Blank Plate
11
Page 12
ULN-8/LIO-8 3d Upgrade Installation Guide
7. Remove the AES/MIDI board by pulling it up from the top of the 2d board.
Figure 1.16: AES/MIDI Board
12
Page 13
ULN-8/LIO-8 3d Upgrade Installation Guide
8. Mate the pins on the bottom of the AES MIDI board with the pins of the Gasket board. Set this board cluster aside.
Figure 1.17: (a) AES/MIDI Board Pairing with Gasket Board
Figure 1.18: (b) AES/MIDI Board Pairing with Gasket Board
13
Page 14
ULN-8/LIO-8 3d Upgrade Installation Guide
9. Detach the Ribbon cable connecting the master board to the front panel.
Figure 1.19: Detach Ribbon Cable
14
Page 15
ULN-8/LIO-8 3d Upgrade Installation Guide
10. The Legacy master board and 2d board need to be removed from the unit. They may be removed individually, or they might come out as a cluster. Rock the 2d board back and forth to loosen it from the pins on the analog board, pulling upward. The master board may begin to pop off of the metal posts on the bottom metal. Place a hand underneath the master board to pop it off the remaining posts. Set the Legacy Master board and 2d card aside.
Figure 1.20: Legacy Master Board and 2d Board
15
Page 16
ULN-8/LIO-8 3d Upgrade Installation Guide
11. Place down the 3d assembly, lining up the three holes in the 3d base board with the 3 posts in the bottom metal. Press into place so the base board snaps down on all three posts. If there are rubber feet present on the bottom metal that were supporting the original master board, peel them off if they get in the way of the rubber feet under the 3d base board.
Figure 1.21: 3d Assembly Installed
16
Page 17
ULN-8/LIO-8 3d Upgrade Installation Guide
12. Place down the bridge board with the extended lip pointing to the BACK of the unit. Very carefully line up all pins on both the 3d base board and analog board with the bottom holes of the bridge board. Once lined up, firmly press down.
Figure 1.22: Bridge Board Installed
IMPORTANT: The orientation and alignment of the bridge board is critical. The lip must be facing toward the back of the unit. The bridge board needs to line up exactly, without any bent or misaligned pins.
17
Page 18
ULN-8/LIO-8 3d Upgrade Installation Guide
13. Reattach the ribbon cable from the meter board to the matching set of pins on the 3d board that sit directly behind the ribbon cable coming from the meter board.
Figure 1.23: Front Panel Meter Board Reconnected
18
Page 19
ULN-8/LIO-8 3d Upgrade Installation Guide
14. Install the AES/MIDI board with small section of pins of the attached gasket board lining up to the matching connection on the 3d board.
Figure 1.24: (a) AES/MIDI/Gasket Assembly Pin Alignment on 3d Base Board
Figure 1.25: (b) AES/MIDI/Gasket Assembly Pin Alignment on 3d Base Board
19
Page 20
ULN-8/LIO-8 3d Upgrade Installation Guide
15. Attach the new back panel, and replace three case screws on the bottom with a Phillips screwdriver. Replace two DB25 side screws on either side of the AES DB25 connector with a nut driver tool.
Make sure the MH Link Ethernet stack is flush with its window on the back panel.
Figure 1.26: New Back Panel Placement
16. Attach the power supply, switch the unit on, and confirm that the front panel Power and Internal Clock Source LEDs turn on. The LED indications shown on power up indicate that the 3d installation is successful.
Figure 1.27: 3d Front Panel on Power Up
17. Switch the unit off and detach the power supply.
18. On the back panel, replace the remaining eight DB25 screws with the nut driver tool. Replace two threaded Phillips head screws on either side of the 4-pin XLR power connector.
Replace the four ring nuts. These may be tightened by hand.
Figure 1.28: Screws and Nuts to Replace on Back Panel
20
Page 21
ULN-8/LIO-8 3d Upgrade Installation Guide
19. Peel the paper strip from the Foam Cap to expose adhesive, and place adhesive side face down on top of the bridge board, pressing slightly so it sticks. The top cover will hold it in place and ensure that the bridge board does not walk off.
Figure 1.29: Foam Cap Applied to Bridge Board
21
Page 22
ULN-8/LIO-8 3d Upgrade Installation Guide
20. On the internal power supply board - the long rectangular board toward the front of the unit - locate the lone capacitor labeled C15 just next to the Phillips screw toward the center of the board. Pinch off and discard this capacitor. This step is necessary to prevent a thump during power on.
Figure 1.30: Cap to Remove from Power Supply Board
Figure 1.31: Cap Removed
22
Page 23
ULN-8/LIO-8 3d Upgrade Installation Guide
21. If there is only one strip of masking on the underside of the top cover, place it toward the front of the unit. Replace the top cover. Replace the six screws on the top of the case. Then replace the screws on the left and right side, remembering to use the longer screws on the rack ears. It sometimes helps to squeeze the top and bottom of the case together when replacing the side screws, to ensure that the outer holes line up with the threaded inserts.
Figure 1.32: Top Cover Replaced
The installation is finished!
For EdgeBoard Installation instructions, see the EdgeBoard Installation Guide.
If you have any questions about the installation process, contact support@mhsecure.com with the subject "3d Field Upgrade".
23
Loading...