®
POLLY
Installation Manual
Toilet Partitions and Dressing Compartments
Metpar Corp
95 State Street, Westbury, New York, USA, 11590
Tel: 516-333-2600 ~ Fax: 516-333-2618 ~ www.Metpar.com ~ E-mail: Service@Metpar.com
~ February 2003 ~
Table of Contents
• Stop! Before you begin Page 1
• Suggested tools Page 1
• Metpar tips Page 2
• Hardware nomenclature Page 2
• Step 1 - Layout Page 3
• Step 2 - Prepare Stiles Page 3
• Step 3 - Position Panel Page 3
• Step 4 - Attach Stiles Page 4
• Step 5 - Secure stiles to panel Page 5
• Step 6 - Headrail & Panel fasten Page 5
• Step 7 - Install Door & Hinge Page 6
• Step 8 – Install Door Latch Page 7
• Step 9 – Care & Maintenance Page 7
• Step 10 - Need Help? Page 7
Before you Before you begin, note the following…begin, note the following…
• Caution, safety first! Be certain to have and use the proper safety gear.
• Structural support in the walls, floors and/or ceiling is not supplied by Metpar. Verify that adequate
blocking has been installed where necessary before you proceed.
• This installation manual should be used in conjunction with the layout drawings prepared by Metpar. Refer
to the layout drawings for further information such as; product style (ie: The Corinthian FP-500 Overhead
Braced), stall width and depth, ceiling height (for ceiling hung or floor-to-ceiling), individual component sizes
(ie: panels, stiles &/or doors), etc. You will need the layout drawings to determine the centerline markings
for drilling locations. If you have the “no-peek” design, you MUSTMUST have the layout drawing which includes
special notes to indicate the location for each individual pilaster and door.
• When the material is shipped to you, an Initial Release (packing list) is included. Be certain that all items
you need have been ordered and shipped properly.
Suggested Tools…Suggested Tools…
For your convenience, we recommend that you have the following tools;
Tape measure, chalk line, pencil, masking tape (to help you layout drilling locations), electric or battery
operated drill, drill bits (including a #30-T7 Torx drill bit), screwdriver (slotted and phillips head), center punch,
plumb-bob, level, hacksaw, hammer, shims, support blocks (13½” high for FP500 and CH700, or 15” high for
FT700).
Metpar’s Polly® Installation Manual ~ February 2003
üMetpar tips…Metpar tips…
1. Plan ahead… coordinate all of the materials and hardware for each specific layout. Study your layout
drawings and evaluate any special conditions that may require custom size materials, unique hardware or
special tools.
2. When you determine the centerline dimensions, refer to the stall depths shown on your layout drawings.
The centerline is ½” less than the stall depth.
3. Read all of these instructions carefully and thoroughly. Reading this manual first will better prepare you
for the entire installation.
?? Hardware Nomenclature…Hardware Nomenclature…
Polly orders are normally provided with 54” full height bright dipped anodized aluminum brackets. Because the
panels, doors and pilasters are all 1” thick, the same bracket is inter-changeable and can be used on panels or
pilasters. The Metpar drawings will illustrate the type of bracket to be used at each location.
#144 FULL HEIGHTFULL HEIGHT 54” 2-ear bracket (#12174) for panel-to-wall or panel-to-stile connections.
Also in 41” length (#12175) for wall hung urinal screens and 70” for panel-to-stile connections on CH700.
#145 FULL HEIGHTFULL HEIGHT 54” 1-ear bracket (#12193) for panel-to-wall, panel-to-stile or stile-to-wall
connections. Also in 70” length for panel-to-stile connections on CH700.
#148 FULL HEIGHTFULL HEIGHT 54” U-bracket (#13310BD) for panel-to-stile connection. Also used on panel-to-
post connections such as on a “PF” screen.
#148 FULL HEIGHTFULL HEIGHT 54” U-bracket assembly (2pcs #13310BD) used for alcove panels attached “in-
line” with the edge of a pilaster. In this scenario, your packing list will show these channels twice, once with a
note indicating “do not drill holes”. A separate detail will be included as an attachment if your job requires it.
1½” x 2” FULL HEIGHTFULL HEIGHT 54” angle bracket (#13390) used to attach posts to the wall.
#148 Headrail U-bracket (#12410) used to attach the end of the headrail to the wall.
1½” x 2” x 1¼” angle in the Headrail Angle Kit (#15921) used to attach the end of headrail to the face
of perpendicular headrail.
Metpar’s Polly® Installation Manual ~ February 2003