METHVEN Maku Installation Manual

Page 1
Issue A436920
TECHNICAL SPECIFICATIONS
Operating Pressure:
Unequal Pressure: Hot: Min 35kPa. Cold: Min 300kPa. Equal Pressure: Min 35kPa. If supply exceeds 500kPa a pressure limiting valve must be installed.
Operating Temperature:
Hot: Min 55°C (at mixer), Max 80°C. Cold: Min 5°C. NB: New Zealand Building Code Clause G12 ­Water Supplies specifies all outlets used primarily for personal hygiene shall deliver water at a safe temperature.
Inlet Connections:
All ½" BSP.
Methven warrants this product against manufacturing defects and that it is suitable for use under the operating conditions specified in this instruction sheet.
For your warranty please refer to www.methven.com or call Customer Service
New Zealand
0800 804 222
Australia
1300 638 483
UK
0800 195 1602
Unequal Pressure Systems
1. If the system is supplied by a pressure pump, ensure that the pump can maintain 300kPa at the cold Inlet. If not, install a low pressure cold feed and install the mixer as if for a low pressure equal system.
2. If the Cold pressure is ABOVE 400kPa, install the mixer without modification. (i.e. with red nozzle as factory fitted.)
3. If the Cold pressure is BELOW 400kPa, replace the Red Nozzle with the Blue Nozzle supplied in the carton. a) To remove a nozzle from the mixer body fit a 6mm Allen key into the hexagon outlet of the nozzle and turn anti-clockwise until the nozzle comes free of the mixer body. b) Fitting a nozzle is the reverse procedure to removal. The nozzle is in the correct position when approximately 2mm of the nozzle protrudes from the outlet of the mixer. Do not use excessive force when fitting the nozzle, it should turn freely. Screw in until just tight and then unscrew ½ a turn.
Equal Pressure Systems
Remove and discard nozzle from mixer.
JET SELECTION
MAKU SHOWER MIXER WITH FASTFLOW
INSTALLATION GUIDE
Page 2
Allen Key
Refer to back page for correct nozzle selection
Lever handle
Grub screw
Faceplate
Screws
Body assembly
Nozzle
Refer to back page for
correct nozzle selection
Faceplate Cover
Do not discard screws
Hole cutout 102mm
Distance from mounting stud to front of lining:
- Min 48mm
- Max 72 mm
Hot
Cold
Min 450mm straight run
1
2
3
4
5
6
IMPORTANT
Please read all of the instructions before installation
Avoid restrictive piping, fittings or sharp angled bends when plumbing the mixer.
Do not hydrostatic test the installation with this mixer installed. Damage to the ceramic cartridge may occur.
All pipe-work must be thoroughly flushed prior to installation of the mixer. In-line filters must be installed on both hot and cold supplies to prevent foreign particles damaging the ceramic cartridge.
NOTE: It is the responsibility of the installer to ensure a water proof seal is achieved between the faceplate and finished surface of the wall. If in any doubt about the quality of the seal the faceplate seal should be removed and then reinstalled using silicon to ensure a seal is achieved.
O-ring
Loading...