Methven 01-8444 Installation Guide

Installation
Waipori Wall Top Assembly
1.
Hot
2.
Ø 35mm
3a
Do not discard screws
Note: It is the responsibility of the installer to ensure a water proof seal is achieved between the faceplate and the finished surface of the wall. If in any doubt about the quality of the seal, the faceplate should be removed and then reinstalled using silicone to ensure a seal is achieved.
JANUARY 2012
Distance from mounting stud to
front of wall lining:
Std - 54-64mm Ext - 64-76mm
Cold
Ø 35mm
3b.
For deeper installations, remove short threaded headworks collars, replace with long threaded headworks collars and spindle extensions.
4.
5.
MA018444
01-8444 (Pair)
Installation Guide
IMPORTANT
Please read all of the instructions before installation
Use of this product is recommended for domestic and commercial applications. Domestic and commercial warranty terms and conditions vary. Please refer to the Methven website for full warranty terms and conditions - www.methven.com All pipework must be thoroughly flushed prior to the installation of the mixer. Inline filter washers must be installed on both hot and cold supplies to prevent foreign particles damaging the ceramic head works. Do not remove the ceramic head works from the mixer when installing. Damage caused by hydrostatic testing is not covered by Methven’s warranty.
Methven recommends a licensed plumber carry out all installations in compliance with the requirements of AS/NZS 3500. This product complies with AS/NZS 3718 regulations.
WMKA21005
Methven Australia Pty Ltd
ABN 15 104 813 390
Melbourne, Australia www.methven.com
www.methven.com
Customer Care Hotline: 1300 METHVEN (638 483)
Email: info@au.methven.com
Technical Specification
Product Components
Inlet Connections: All 1/2" BSP
Operating Pressure: 150kPa - 500kPa
For optimum performance hot and cold water pressures should be equal.
AS/NZS 3500 stipulates a 500kPa maximum operating pressure at any outlet within a building. Where normal pressure exceeds 500kPa, a pressure limiting valve must be installed.
Operating Temperature: Recommended hot water supply 50°C, maximum 70°C. AS/NZS 3500 requires all hot water supplies to any sanitary fitting to be tempered to 50°C.
Ceramic cartridges: Warranty claims will be void where the ceramic head works has malfunctioned due to the presence of the following within the water supply:
Copper tube pieces Plastic pieces Sand, dirt or stones Thread tape Other objects not normally present in the potable water supplies
Handle Parts / Assembly Care and Cleaning
Standard Spindle &
Handle Assembly Set Up
(NOT INCLUDED)
SPARE PARTS
(NOT INCLUDED)
Spindle Handle
Extension 04-9837
Never use abrasives to clean this product. Clean regularly with contamination free warm soapy water and a damp soft cloth. Damage caused by using unsuitable cleaning agents is not covered by warranty.
Please check every component in accordance with the table below
No. Item description Qty supplied
1 Headworks 2 2 Base ring 2 3 Grub screws 2 4 O-ring 2 5 Locking nut 2 6 Cold handle 2 7 Hot handle 2
1
Headworks
4
O-ring
7
Hot handle
Base ring
2
Hot 04-9752 Cold 0 69
04-9905
Spindle Flange M x F
Extension 04-9875
(NOT INCLUDED)
www.methven.com
Customer Care Hotline: 1300 METHVEN (638 483)
Email: info@au.methven.com
Locking nut
Grub screws
3
Cold handle
6
5
THE METHVEN GUARANTEE
The warranty statement shall apply to all tapware & showers supplied by Methven For more information visit www.methven.com THIS WARRANTY ISSUED BY: Methven Australia Pty Ltd, Melbourne Australia
Loading...