Merco BG-1T Installation Manual

INSTALLATION & OPERATION MANUAL for the BG-1T
Horizontal Conveyor Grilling Toaster
The BG-1T Horizontal Conveyor Grilling Toaster is capable of one­sided toasting of a variety of bread products such as: buns, Texas toast, etc..
The BG-1T has two 5” wide con­veyor belts. These two conveyor belts are offset ¼” to accommo­date the difference in thickness between bun crowns and heels.
Set the variable conveyor speed control to desired setting and operation is nearly automatic. A convenient loading ramp is equipped with all models.
NOTE: This manual contains important safety, Installation & Operation Instructions. Require all operators to read this manual before using this unit. Failure to follow the instructions contained in this manual may cause injury, damage to the unit, and will void the warranty.
THIS MANUAL SHOULD BE RETAINED FOR FUTURE USE
0101-JDM 07113
WARNING
This unit must be plugged into the proper voltage which is
specified on the data plate located on the back panel of this unit.
Use of any other voltage or altering of plug will damage unit, void
warranty and may cause injury.
BEFORE INSTALLATION
NOTE: Upon receipt of this unit, immediately unpack and inspect for possible concealed shipping damage. If unit is found to be damaged, save all packing materials and contact your delivery carrier within 5 days. Refer to “Shipping Damage Instructions” enclosed for detailed instructions. Failure to follow these instructions will negate Merco/Savory’s or your ability to file claims and receive compensation for shipping damage.
INSTALLATION INSTRUCTIONS
Install BG-1T units in the most convenient location for ease of cleaning, maintenance and general operation. Avoid install­ing in locations with drafts, close proximity to grease or vapor-producing appliance or other high ambient heat equipment. Allow approximately 1” clearance on back and sides of unit for proper air circulation. Allow sufficient overhead clearance at front of unit for proper platen functioning.
Receiving Pan/Delivery Chute Installation: as the receiving pan is installed first. Tilt the pan so that the back end slides along the bottom of the opening and passes under and behind the two pins (Figure B). With the pan resting flatly on the bottom of opening, gently pull toward you until back is stopped by the pins (Figure C). The delivery chute should now be installed through the same opening. Hold the delivery chute so that the notches are closest to you and down. Insert the chute into the cavity up and over the pins until the notches rest directly on the pins. The other end of the delivery chute will rest on the motor housing at the rear of the toaster cavity (Figure D).
Loading Ramp Installation: Locate the two protruding pins on the toaster (one on each side of the front portion of the toaster). Position the loading ramp so that the notches on the ramp slide over these pins and lock into place (Figure E).