Me rc o , LLC
1111 North Hadle y Roa d
Fo rt Wa yne , Ind ia na 46804
Te lepho ne : 260.459.8200
Fa x: 888.790.8193
Te c hnic a l Suppo rt: 800.678.9511
FFHSserviceman
me rc o sa vo ry.c om
TABLE OF CONTENTS
UNITS WITH “CENTER” ON/OFF SWITCHES
UNIT SPECIFICATIONS (FFHS-27)……………………………………………………………………………….. 3
UNIT SPECIFICATIONS (FFHS-16)……………………………………………………………………………….. 4
UNIT SPECIFICATIONS (FFHS-10)……………………………………………………………………………….. 5
DROP PAN / REMOTE SWITCH ILLUSTRATIONS (FFHS-27 & FFHS-16)...………..……………….……… 6
DROP PAN / REMOTE SWITCH ILLUSTRATION (FFHS-10)………………………………………………….. 7
WIRING DIAGRAMS (ALL FFHS MODELS)……………..…………………………………...………………….. 8
SEQUENCE OF OPERATIONS (ALL FFHS MODELS)……………………………………………………..…… 9
REMOVAL INSTALLATION & ADJUSTMENTS (FFHS-27)……………..…………………………….………… 10
REMOVAL INSTALLATION & ADJUSTMENTS (FFHS-16 & FFHS-10)……………………………………….. 12
PARTS BREAKDOWN (FFHS-27)………………………………………………………………………………….. 14
PARTS BREAKDOWN (FFHS-16)………………………………………………………………………………..… 16
PARTS BREAKDOWN (FFHS-10)………………………….…………………..………………………………..… 18
ADDENDUM A - OUTDATED UNITS (WITH “RIGHT-SIDE” ON/OFF SWITCHES)
SEQUENCE OF OPERATIONS (27000, 27002)…………………………………………………………….…….21
SPECIFICATIONS (27000, 27002)……………………………………………………………………………….… 21
SPECIFICATIONS FOR FFHS-27 with Remote Switch (27017)
Available only on model 27017
SPECIFICATIONS FOR FFHS-16 with Remote Switch (27016)
Available only on model 27016
Remote
Switch
Pan
Assembly
Remote
Switch
Pan
Assembly
FFHS 27000 Series Service Manual
6
SPECIFICATIONS FOR FFHS-10 with Remote Switch (27018)
Available only on model 27018
Remote
Switch
Pan
Assembly
FFHS 27000 Series Service Manual
7
WIRING DIAGRAM FOR 27007, 27008, 27012, 27014, 27016, 27018, 27019
(SN 0703210050652 and above)
WIRING DIAGRAM FOR 27000, 27001, 27002, 27017 (SN 0708210050345 and above)
FFHS 27000 Series Service Manual
8
SEQUENCE OF OPERATIONS
MODELS 27000, 27001, 27002, 27017
Power Supply
Heating Circuit
Cool Down Circuit
Electrical power is supplied to the unit by a 3
conductor service for single phase.
Black conductor is hot.
White conductor is hot.
Green and yellow conductor is ground.
Power is permanently supplied to one of the normally
open contacts of the main switch, also to the normally
open contacts of relay and the normally open cool
down thermostat.
Closing the main power switch supplies power to the
coils of relays, power is supplied to the main fan
motor. The contacts of R1 and R2 close supplying
power to the main heater.
As the temperature reaches 200°F, the cool down
thermostat closes. When the main switch is turned off,
the main fan will continue to run until the temperature
drops to 160°F.
Electrical power is supplied to the unit by a 3
conductor service for single phase.
Black conductor is hot.
White conductor is neutral.
Green and yellow conductor is ground.
Power is permanently supplied to one of the normally
open contacts of the main switch also to one side of
the normally open contacts of the main heater relay.
Closing the main power switch feeds power through
the normally closed high limit thermostat to the coil of
the main relay. Its contacts now close supplying
power to the main heater. Also for air circulation
power is supplied to the main fan motor.
FFHS 27000 Series Service Manual
9
REMOVAL, INSTALLATION AND ADJUSTMENTS
(NEW STYLE CENTER SWITCH UNITS)
MODELS 27000, 27001, 27002, 27017
SWITCH, ON-OFF
1. Remove screws from face of switch mounting plate.
2. Disconnect wires from switch assembly. Mark wires for reinstallation.
3. Depress clips on side of switch and remove switch from panel.
4. Install new part, reassemble in reverse order, and check operation.
SWITCH, COOL-DOWN MOTOR
1. Lift and set aside pan tray and grease pan weldment.
2. Remove screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Remove exhaust panel by sliding forward (toward on/off switch) and set panel aside.
5. Remove inner formed base by sliding forward (toward on/off switch).
6. Disconnect wires from end of cool-down motor switch. Mark wires for reinstallation.
7. Remove screws from cool-down motor switch to remove switch.
8. Install new part, reassemble in reverse order, and check operation.
HIGH LIMIT THERMOSTAT
1. Lift and set aside pan tray and grease pan weldment.
2. Remove fourteen (14) screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Remove exhaust panel by sliding forward (toward on/off switch) and set panel aside.
5. Remove inner formed base by sliding forward (toward on/off switch).
6. Disconnect two (2) wires from end of high limit thermostat. Mark wires for reinstallation.
7. Remove two (2) screws from the high limit to remove thermostat.
8. Install new part, reassemble in reverse order, and check operation.
POWER CORD 250V 30A
1. Lift and set aside pan tray and grease pan weldment.
2. Remove screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Disconnect power cord L1 and L2 wires from wire terminal connections. Mark wires for
5. Remove ground nut from power cord ground wire.
6. Compress cord strain relief to remove power cord from bracket.
7. Install new part, reassemble in reverse order, and check operation.
CAUTION:
!
reinstallation.
Disconnect power supply before servicing or cleaning this toaster. Safeguard power
so it cannot be accidentally restored. Failure to do so could result in dismemberment,
electrocution, or fatal injury.
FFHS 27000 Series Service Manual
10
HEATER 208V, 240V
1. Lift and set aside pan tray and grease pan weldment.
2. Remove screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Remove exhaust panel by sliding forward (toward on/off switch) and set panel aside.
5. Remove inner formed base by sliding forward (toward on/off switch).
6. Remove screws from element bracket.
7. Loosen screws from air duct base next to element bracket for element removal.
8. Disconnect wires from heater and remove heater. Mark wires for reinstallation.
9. Install new part, reassemble in reverse order, and check operation.
BLOWER
1. Lift and set aside pan tray and grease pan weldment.
2. Remove screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Disconnect wires from blower. Mark wires for reinstallation.
5. Remove nuts from base of blower assembly and remove blower assembly.
6. Install new part, reassemble in reverse order, and check operation.
POWER RELAY
1. Lift and set aside pan tray and grease pan weldment.
2. Remove screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Disconnect wires from relay. Mark wires for reinstallation.
5. Remove screws from relay and remove power relay.
6. Install new part, reassemble in reverse order, and check operation.
FFHS 27000 Series Service Manual
11
REMOVAL, INSTALLATION AND ADJUSTMENTS
(NEW STYLE CENTER SWITCH UNITS)
1. Remove two (2) screws from face of switch mounting plate.
2. Disconnect three (3) wires from switch assembly. Mark wires for reinstallation.
3. Depress clips on side of switch and remove switch from panel.
4. Install new part, reassemble in reverse order, and check operation.
POWER CORD 120V
1. Lift and set aside pan tray and grease pan weldment.
2. Remove fourteen (14) screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Disconnect power cord neutral and L1 wires from in-line wire terminal connections. Mark wires for
reinstallation.
5. Remove ground nut from power cord ground wire.
6. Compress cord strain relief to remove power cord from bracket.
7. Install new part, reassemble in reverse order, and check operation.
HEATER 120V
1. Lift and set aside pan tray and grease pan weldment.
2. Remove fourteen (14) screws from both left and right outer formed panels.
3. Lift and set aside blower cover weldment.
4. Remove six (6) screws from air intake baffle.
5. Remove two (2) screws from bottom of exhaust panel and set panel aside.
6. Remove inner formed base by sliding forward (toward on/off switch).
7. Remove three (3) screws from base of blower assembly.
8. Remove two (2) screws from both left and right air duct fillers.
9. Slide out blower and heater assembly from blower seal bracket.
10. Remove four (4) screws from side of heater to separate heater from blower.
11. Disconnect two (2) wires from heater and remove heater. Mark wires for reinstallation. Note the
path of the wires for reinstallation.
12. Install new part, reassemble in reverse order, and check operation.
Disconnect power supply before servicing or cleaning this toaster. Safeguard power
so it cannot be accidentally restored. Failure to do so could result in dismemberment,
electrocution, or fatal injury.
FFHS 27000 Series Service Manual
12
Loading...
+ 28 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.