Mercia Garden Products Portabase Instruction manual

Portabase
Tools Required
Phillips Screwdriver Spirit Level Drill + 2mm Bit Hammer/ Mallet Measuring Tape
For Assistance Please
Contact Customer Care On:
01636 880514
4x6
4
6x4
20 x 100mm screws
15 x 70mm screws
4
4
34 x 40mm screws
1070mm x 90mm Qty x4
1750mm x 90mm Qty x2
7x5
20 x 100mm screws
15 x 70mm screws
6
4
34 x 40mm screws
1360mm x 90mm Qty x5
2100mm x 90mm Qty x2
7x7
20 x 100mm screws
20 x 100mm screws
15 x 70mm screws
4
34 x 40mm screws
1200mm x 90mm Qty x2
1710mm x 90mm Qty x4
6
4
15 x 70mm screws 34 x 40mm screws
1990mm x 90mm Qty x6
2100 x 90mm Qty x2
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Spirit Level, Hammer/Mallet, Measuring Tape and drill with 2mm bit.
TIMBER
Our buildings are delivered pre-treated with a water based timber treatment however this only helps to protect during transit of your garden item. To validate your guarantee and for better protection against weathering it is highly recommended that you treat the garden building with a wood preserver within 3 months of assembly. This will need to be re-applied annually to ensure longevity of your building. Care must be taken when constructing the garden building that it is not touching the ground and is on a suitable base.
HEALTH AND SAFETY
- When Handling treated timber always wear gloves and eye protection and work in a well ventilated area.
- Wash hands thoroughly after handling treated timber and especially before eating or smoking.
- Do not burn timber o-cuts, Dispose of them safely as refuse. Treated timber contains chemical preservatives.
- Wear goggles when pressure washing or scrubbing with chemical cleaners or restorers.
- Keep children away from the work area until the job has been completed and tools have been stored safely.
For ease of assembly, it is advisable to pilot drill all screw holes and ensure all screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
Please thoughroughly read the instructions before assembly and retain for reference after use.
N.B. The building must be erected on the portabase as it cannot be moved once erected.
8x6
6
10x6
8
10x8
8
20 x 100mm screws
15 x 70mm screws
4
4
4
34 x 40mm screws
36 x 100mm screws
27 x 70mm screws 40 x 40mm screws
36 x 100mm screws
27 x 70mm screws 40 x 40mm screws
1710mm x 90mm Qty x7
2430mm x 90mm Qty x2
1710mm x 90mm Qty x11
1800mm x 90mm Qty x2
3010mm x 90mm Qty x2
2430mm x 90mm Qty x11
Assembly: Only for Groundsman
Step 1
Identify the 2 long beams and the remaining shorter beams. On a level surface create the required layout, as shown. Secure the shorter beams in place using 2x 100mm screws as shown in the diagram.
Step 3
To secure the base to the ground, hammer in the spikes at each corner untill level with the top of the base, using a piece of scrap wood to prevent damage to the spike.
* Important, Ensure that all short beams are equally spaced.
Step 2
With the portbase in the desired position for the buildings
framework using 3x40mm round head screws pre-drilling with a 2mm drill bit. Ensure that the base is level. Either of
Step 4
Once the Spike is in the desired
round head screws as shown. Pre-drill using a 2mm drill bit.
Pre-Drill with 2mm bit
Pre-Drill with 2mm bit
If the Portabase is to be located onto hardstanding, only the L shaped Foot are used. Position the portabase
through the joists lined up with the beams of the Portabse.
On soft ground we would recommend the use of post-mix concrete to secure the corner spikes.
N.B The building must be erected on the portabase as it cannot be moved once erected.
Loading...
+ 2 hidden pages