Mercia Garden Products 07PORCOR0707-V1, 07PORCOR0808-V1 Instruction manual

General Instructions
Please retain product label and instructions for future reference
N/A
Overlap
Cladding
07PORCOR0707-V1
7x7 Corner Portabase
07PORCOR0808-V1
8x8 Corner Portabase
Shiplap
Cladding
Fixed
Windows
Opening
Windows
No
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst three months of assembly and thereafter in accordance with the manufactures recommenda­tions. Care must be taken to ensure the product is placed on a suitable base.
Solid Sheet
T&G Floor
Solid Sheet
Roof
x2
2mm Drill bit
CAUTION
Every eort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timer.
T&G Roof
All building’s should be erected by two adults
For ease of assembly, it is advisable to pilot drill all screw holes and ensure all screw heads are countersunk.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
Refer to the instructions pages for you specic product code
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Avoid breathing dust when cutting treated or untreated wood.
For Assistance Please
Contact Customer Care on
01636 880514
**Protim Fentex E5**
Wear gloves when handling freshly treated wood.
Dispose of o-cuts responsibly – do not burn.
P 1
07PORCOR0707-V1 & 07PORCOR0808-V1
Please retain product label and instructions for future reference
Overall Dimensions: 7x7 Corner Portabase
Length = 1960mm Width = 1960mm Height = 90mm
Overall Dimensions: 8x8 Corner Portabase
Length = 2434mm Width = 2434mm Height = 90mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
Contents: 7x7 Corner Portabase
1
Framing - 1915mm
Contents: 8x8 Corner Portabase
1
Framing - 2389mm
Step 1
Arrange the framing as shown in the illustration and secure together using 10x100mm screws at each connecting point.
10x100mm Screws
Pre drill
hole
100mm
screw
1
2
3
3
4
2
Framing - 1870mm QTY 4
3
Framing - 1123mm QTY 2
4
Angled Framing - 1185mm
5
Angled Framing - 1479mm
6
Framing - 374mm
7 8
Base Feet QTY 5
Nail Bag
2
3
4
5
6
Ground Spike QTY 5
100mm Screw x32
Framing - 2343mm QTY 4
Framing - 1420mm QTY 2
Angled Framing - 1432mm
Angled Framing - 1862mm
Framing - 462mm
Step 2
Place the remaining framing into the base.
Rest the rst piece against the front “angled” frame and space the other two equally as shown in the illustration.
Secure to the base using 12x100mm screws.
12x100mm Screws
Pre drill
hole
100mm
screw
2
2
2
70mm Screw x22
40mm Screw x37
*If the portabase is to be located onto a hard standing surce, only the “L” shaped base feet are needed. Position & identify the high and low spots, securing the feet in place so that the portabase is rm and level in all directions.
On soft ground we recommend the use of post-mix concrete to further secure the groung spikes.
P 2
Loading...
+ 2 hidden pages