Mercia Garden Products 06LOG209SG-V1, 06LOG209DG-V1 Instruction manual

General Instructions
Please retain product label and instructions for future reference
06LOG209SG-V1 & 06LOG209DG-V1 (5x5m)
06LOG209SG-V1: 5x5m (34mm) apex cabin with single (glass) glazing 06LOG209DG-V1: 5x5m (34mm) apex cabin with double (glass) glazing
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
2mm Drill bit
All building’s should be erected by two adults
For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.
For ease of assembly use a rubber mallet to t the log boards. Do NOT use a heavy hammer.
It is advisable to use a circular saw when cutting roof and oor boards.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.
Ensure to measure and check before cutting boards.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1
06LOG209SG-V1 & 06LOG209DG-V1
Overall Dimensions:
Width = 5108mm Depth = 5832mm Height = 2869mm
Base Dimensions:
Width = 4818mm Depth = 4818mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
21
11
Log Board (A) - 120x34x6000mm QTY 2
LB34-6000mm (Notch Oset)
12
Floor Board - 121x16x2369mm QTY 84
MB16-2369mm
13
Roof Board - 121x16x2629mm QTY 108
MB16-2629mm
14
Bearer - 44x58x2286mm QTY 36
F4458-2286mm (Pressure Treated)
15
Bearer - 44x58x2402mm QTY 8
F4458-2402mm (Pressure Treated)
3
4
16
Purlin - 45x120x6004mm QTY 5
F45120-6004mm (44mm)
Window
Slave Door Master Door
QTY 2
5
Starter Board (S1) - 66x34x5000mm QTY 2
LB34RT66-5000mm
6
Log Board (B) - 120x34x1715mm QTY 12
LB34-1715mm
7
Log Board (B) - 120x34x482mm QTY 24
LB34-482mm
Log 209 Gable - 5000mm
QTY 2
17
Fascia - 16x120x2649mm QTY 4
S16120-2649mm
18
Fascia - 16x120x2001mm QTY 6
S16120-2001mm
19
Eaves Frame - 27x44x2001mm QTY 6
F2744-2001mm
20
Door Strip - 16x1660x1880mm
F1660-1880mm
21
Door Frame Top & Bottom - 69x69x1505mm QTY 2
WF6969-1505mm (44mm)
22
Storm Brace - 27x44x2100mm QTY 8
F2744-2100mm
23
Skirting - 28x28x2400mm QTY 12
FS2828-2400mm
8
Log Board (E) - 120x34x482mm QTY 24
LB34-482mm (No Notch)
9
Log Board (A) - 120x34x5000mm QTY 56
LB34-5000mm
10
Log Board (A) - 120x34x5500mm QTY 2
LB34-5500mm (Notch Oset)
24
Interior Roof Trim - 27x44x2400mm QTY 6
F2744-2400mm (Bevelled)
25 26
Mortice Lock
Key Plate
P 2
Please retain product label and instructions for future reference
27
Handles (Pair)
Nail Bag
Pre-assembly
28
Tower Bolt QTY 2
100mm Bolt Set x25
70mm Screw x600
40mm Screw x1600
29
Felt
30
Casement Stay QTY 2
30mm Screw x25
30mm Black Screw x21
Felt Tacks x600
Step 2
a
Fit the mortice lock (No. 24) into the recess in the master door (No. 3) and secure using the screws provided. Attach the key plate (No. 25) to the slave door (No. 2) with the screws provided.
b
Fit the door handles (No. 26) and connect with the metalbar to the mortice lock using 8x30mm screws. Ensure the lock mechanism closes correctly. If not, remove the lock and turn the catch around using the small grub screw.
*Please note: This image is for illustrative purposes and may dier from your choice in product (regarding ironmongery). Nevertheless the process of xing the frames is the same.
12x30mm Screws
The Mortice Lock is Reversible
a
b
*Please note:
Each board interlocks at either end in a staggered pattern.
Before securing ensure that the boards are tted properly in their respective tongue’s and groove’s.
Step 1: Door Frame Fit
Arrange the door framing onto a rm and level surface. Secure the top and bottom frames (No. **) to the uprights (attached to each door). Fix into place using 1x70mm screw per corner, ensuring the screws do NOT protrude into the channel either side of the doors.
*Please note: This image is for illustrative purposes and may dier from your choice in product (regarding hinges). Nevertheless the process of xing the frames is the same.
8x70mm Screws
Pre drill
hole
70mm
screw
IMPORTANT: It is imperative that you pre-drill before xing screws.
*Ensure the top & bottom rails sit inbetween the upright framing attached to the doors.
Pre drill
hole
30mm
screw
Step 3
Attatch the door strip (No. 19) to the back of slave door using 4x40mm screws as shown in the illustration.
Once xed secure the tower bolts (No. 27) to the top and bottom of the strip using the screws provided.
*These tower bolts help to keep your doors straight during high and low levels of moisture content in the air.
4x40mm Screws
Pre drill
hole
40mm
screw
19
27
P 3
Loading...
+ 7 hidden pages