
General Instructions
Please retain product label and instructions for future reference
06LOG018-V1 (3x3.5m)
3x3.5m reverse apex log cabin (T&G roof and oor with single (glass) glazing.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
2mm Drill bit
All building’s should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a
circular saw when cutting
roof and oor boards.
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1

06LOG018-V1
Please retain product label and instructions for future reference
Overall Dimensions:
Width = 3532mm
Depth = 3139mm
Height = 2600mm
Base Dimensions:
Width = 3304mm
Depth = 2799mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
1
2
10
Log Board (B) - 120x19x1123mm QTY 36
LB19-1123mm
11
Roof Purlin - 90x40x3504mm QTY 3
F4090-3504mm
12
Eaves Frame - 27x44x3500mm QTY 2
F2744-3500mm
13
Fascia - 120x16x1608mm QTY 4
S16120-1608mm (Angled)
14
Fascia - 120x16x3532mm QTY 2
S16120-3532mm
3
15
Bearer - 44x44x2799mm QTY 2
F4444-2799mm
16
Bearer - 44x44x3216mm QTY 10
F4444-3216mm
Door
Window QTY 3
4
Starter Board (S1) - 66x19x3500mm QTY 2
LB19RT66-3500mm
5
Log Board (B) - 120x19x295mm QTY 36
LB19-295mm
6
Log Board (C) - 120x19x295mm QTY 36
LB19-295mm (No notch)
7
Log Board (A) - 120x19x3500mm QTY 20
LB19-3500mm
8
Log Board (AR) - 45x19x3500mm QTY 2
LB19RG45-3500mm
Log 018 gable - 2996mm QTY 2
17
Roof Board - 121x16x1600mm QTY 64
MB16-1600mm
18
Floor Board - 121x16x2760mm QTY 30
MB16-2760mm
19
Storm Brace - 27x44x2100mm QTY 8
F2744-2100mm
20
Skirting - 28x28x2400mm QTY 9
FS2828-2400mm
21
Interior Roof Trim - 27x44x2400mm QTY 5
F2744-2400mm (Bevelled)
22
Mortice Lock
23
Key Plate
24
Handles (Pair)
25
Felt
9
Log Board (A) - 120x19x2996mm QTY 20
LB19-2996mm
P 2

Please retain product label and instructions for future reference
Nail Bag
Pre-assembly
*Please note:
Each board interlocks at
either end in a staggered pattern.
Before securing ensure that the boards
are tted properly in their respective
tongue’s and groove’s.
80mm Bolt Set x17
70mm Screw x102
40mm Screw x588
30mm Screw x102
30mm Black Screw x10
Felt Tacks x175
Step 2
Lay the bearer’s (No. 15 & No. 16)
onto a rm and level surface
(free from areas where standing
water can collect) as shown in the
illustration.
Fix the framing together at each
corner using 8x70mm screws,
ensuring the frame is ush.
8x70mm Screws
Pre drill
hole
70mm
screw
15
16
16
15
15
16
Step 1
Fit the mortice lock (No. 22) into the recess
a
in the door (No. 1) and secure using the
screws provided. Attach the key plate (No. 23)
to the framing around the door with the screws
provided.
b
Connect the door handles (No. 24) and the
metalbar to the mortice lock using 8x30mm
screws. Ensure the lock mechanism
closes correctly. If not, remove the lock
and turn the catch around using the small
grub screw.
*Please note: This image is for illustrative purposes
and may dier from your choice in product
(regarding ironmongery). Nevertheless the process
of xing the frames is the same.
8x30mm Black Screws
4x30mm Screws
The Mortice Lock is Reversible
a
b
Step 3
Following the same method
outlined in Step 2, arrange the
remaining framing (No. 16) as
shown in the illustration.
*Ensure there is an equal
amount of space between each
frame.
Secure each of the frames in place
using 4x70mm screws per frame,
ensuring the framing remains level.
32x70mm Screws
Pre drill
hole
70mm
screw
16
15
16
16
16
16
16
16
16
16
16
Pre drill
hole
30mm
screw
30mm
screw
P 3