Mercia Garden Products 06LOG017-V1 Instruction manual

General Instructions
Please retain product label and instructions for future reference
Log Cabin 3.5x2.4m
06LOG017-V1 (T&G roof and oor with single (glass) glazing)
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
2mm Drill bit
All building’s should be erected by two adults
For ease of assembly use a rubber mallet to t the log boards. Do NOT use a heavy hammer.
It is advisable to use a circular saw when cutting roof and oor boards.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.
Ensure to measure and check before cutting boards.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1
06LOG017-V1
Please retain product label and instructions for future reference
Overall Dimensions:
Width = 3524mm Depth = 2722mm Height = 2378mm
Base Dimensions:
Width = 3303mm Depth = 2199mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
21
20
Bearer - 44x44x2199mm QTY 2
F4444-2199mm
22
Skirting - 28x28x2400mm QTY 13
FS2828-2400mm
24
Fascia - 120x16x2720mm QTY 2
S16120-2720mm
26
Roof Strip - 40x12x934mm QTY 3
S1240-934mm (OSB Option Only)
21
Bearer - 44x44x3215mm QTY 8
F4444-3215mm
23
Fascia - 120x16x3600mm QTY 2
S16120-3600mm
25
Roof Strip - 40x12x1134mm QTY 3
S1240-1134mm (OSB Option Only)
27a
Roof Sheet - OSB12-875x1348mm QTY 8
(OSB Option Only)
28a
3
4
5
29
Window
Slave Door
Master Door
QTY 2
6
Starter Board (S3) - 66x19x3500mm QTY 2
LB19RT66-3500mm (Centre Notch)
7
Log Board (B) - 120x19x360mm QTY 18
LB19-360mm
8
Log Board (B) - 120x19x245mm QTY 18
LB19-245mm
9
Log Board (E) - 120x19x505mm QTY 18
LB19-505mm (Centre Notch)
10
Log Board (D) - 120x19x3500mm QTY 21
LB19-3500mm (Centre Notch)
Storage Door
13
14
15
16
17
No. 5 Gable 2596mm QTY 3
(Gable is un-xed for assembly
purposes)
Log Board (DR) - 97x19x3500mm
LB19RG97-3500mm (Centre notch)
Log Board (A) - 120x19x2396mm QTY 45
LB19-2396mm
Log Board (B) - 120x19x823mm QTY 24
LB19-823mm
Roof Purlin - 40x90x3500mm
F4090-3500mm (Centre Notch)
Interior Roof Trim - 27x44x2171mm QTY 2
F2744-2171mm
Floor Sheet - OSB12-1085x2160mm QTY 2
(OSB Option Only)
27b
Roof Board - 121x16x2696mm QTY 33
MB16-2696mm
30
Eaves Frame - 44x27x3500mm QTY 2
F2744-3500mm
31 32
Mortice Lock Key Plate
36
Casement Stay
37 38
Dead Lock
39
Storm Brace - 27x44x2100mm QTY 14
F2744-2100mm
33
Handles (Pair)
Floor Sheet - OSB12-1075x2160mm
(OSB Option Only)
28b
Floor Board - 121x16x2160mm QTY 32
MB16-2160mm
34 35
Tower Bolt QTY 2
Storage Door Handle
Felt
11
Log Board (DR) - 54x19x3500mm
LB19RG54-3500mm (Centre Notch)
12
Door Frame - 55x69x1505mm QTY 2
F5569-1505mm
18
Interior Roof Trim - 27x44x1075mm QTY 2
F2744-1075mm
19
Door Strip - 60x16x1800mm
F1660-1800mm
P 2
Please retain product label and instructions for future reference
Nail Bag
Pre-assembly
*Please note:
Each board interlocks at either end in a staggered pattern.
70mm Screw x196
40mm Screw x476
30mm Screw x273
45mm Bolt x3
80mm Bolt Set x33
30mm Black Screw x23
20mm Screw x37
Felt Tacks x184
Step 2
Fit the mortice lock(s) (No’s. 31 & 37) into
a
the recess in the master door (No’s. 3 & 4) and secure using the screws provided. Attach the key plate(s) (No. 32) to the slave door (No. 2) with the screws provided.
b
Fit the door handles (No. 33) and connect with the metalbar to the mortice lock using 8x30mm screws. Ensure the lock mechanism closes correctly. If not, remove the lock and turn the catch around using the small grub screw.
*Please note: This image is for illustrative purposes and may dier from your choice in product (regarding ironmongery). Nevertheless the process of xing the frames is the same.
24x30mm Screws
The Mortice Lock is Reversible
a
b
Before securing ensure that the boards are tted properly in their respective tongue’s and groove’s.
Step 1: Door Frame Fit
Arrange the door framing onto a rm and level surface. Secure the top and bottom frames (No. 12) to the uprights (attached to each door). Fix at each corner using 4x70mm screws, ensuring the screws do NOT protrude into the channel either side of the doors.
*Please note: This image is for illustrative purposes and may dier from your choice in product (regarding hinges). Nevertheless the process of xing the frames is the same.
IMPORTANT: It is imperative that you pre-drill before xing screws.
Pre drill
hole
30mm
screw
30mm
screw
Step 3
Attatch the door strip (No. 19) to the back of slave door using 4x40mm screws as shown in the illustration.
Once xed secure the tower bolts to the top and bottom of the strip using the screws provided.
*These tower bolts help to keep your doors straight during high and low levels of moisture content in the air.
4x40mm Screws
33
19
4x70mm Screws
Pre drill
hole
70mm
screw
*Ensure the top & bottom rails sit inbetween the upright framing attached to the doors.
Pre drill
hole
40mm
screw
P 3
Please retain product label and instructions for future reference
Step 4
Attach the door handle (No. 36) to the storage door, using either the 30mm screws or bolts provided with the handles (ironmongery choice
depending).
*Please note: This image is for illustrative
purposes and may dier from your choice in product (regarding door position). Nevertheless the process of tting the door frame is the same.
8x30mm Black Screws
(Ironmongery depending)
8x30mm Screws (Ironmongery depending) 2x45mm Bolt (Ironmongery depending)
Pre drill
hole
30mm
screw
30mm
screw
45mm
Bolt
37
Step 6
Lay the starters (No. 20 & No. 21) onto a rm and level surface (free from areas where standing water can collect) as shown in the illustration.
Fix the framing together at each corner using 8x70mm screws, ensuring the frame is ush.
8x70mm Screws
Pre drill
hole
70mm
screw
16
15
20
21
20
20
21
21
20
Step 5
Fix the casement stay (No. 35) onto the window (No. 1) and the casement stay pins to the window cill using 6x30mm screws.
*Ensure the casement stay is centralised on the window.
6x30mm Black Screws (Ironmongery depending) 6x30mm Screws (Ironmongery depending)
35
Step 7
Following the same method outlined in Step 6, arrange the remaining framing (No. 21) as shown in the illustration.
*Ensure there is an equal amount of space between each frame.
Secure each of the frames in place using 4x70mm screws per frame, ensuring the framing remains level.
48x70mm Screws
21
21
21
21
21
21
21
21
Pre drill
hole
30mm
screw
30mm
screw
Pre drill
hole
70mm
screw
20
21
P 4
Loading...
+ 9 hidden pages