Mercia Garden Products 04MG0301-V1 Instruction manual

For domestic and family use only Retain Instructions for future reference
Before
assembly make sure you
have a suitable base
ready to erect your
building
Dimensions
Length = 1158mm Width = 580mm Height = 2011mm
01636880514
1
Door
Gable
Fixing Kit
2
Window
Side
QTY 2
3 4
Plain
Gable
Floor
5
Roof Sheet QTY 2
6
Door
QTY 2
7
Bottom
Shelf
8
Top
Shelf
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
x2
2mm Drill bit
This building should be erected by two people.
For ease of assembly, you must pilot drill all screw holes and ensure all screw heads are countersunk.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
9
Cover Trim 1728mm QTY 4
10
11
12
Fascia 610mm QTY 4
Eaves 580mm QTY 2
Door Bar 1620mm
Nail Bag
50mm Screw x 33
30mm Screw x 53
30mm Black Screw x 1
20mm Screw x 38
13
14
15
16
Butt Hinge QTY 6
Turn Button
Wooden door handle QTY 2
Felt
Our buildings are delivered pre-treated with a water based timber treatment however this only helps to protect during transit of your garden item. To
validate your guarantee and for better protection against weathering it is ESSENTIAL that you treat the garden building with a wood preserver within 3
months of assembly. This will need to be re-applied annually to ensure longevity of your building. Care must be taken when constructing the garden building that it is not touching the ground and is on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
For Assistance Please
Contact Customer Care on
01636 880514
Felt Tacks x 35
Pre-Assembly
Remove transportation blocks from the bottom of each panel before beginning assembly. Each Panel should have two blocks.
Step 1
Step 3
Place oor on a rm and level base, ensure base has suitable drainage free from areas where standing water can collect. (see front page on base requirements).
Step 2
Fix the corners with 50mm screws as shown in diagram.
4
screws as shown in the diagram.
Fix the corners with 50mm
3x50mm Screws
Pre drill
hole
50mm
screw
2
3
2
Do not secure the building to the
floor until the roof is fitted. Fix the panels onto the floor using 50mm screws in alignment with the floor joists
3x50mm Screws
Pre drill
hole
50mm
screw
Step 4
Fix the door gable at the corners with 50mm screws as shown in the diagram.
6x50mm Screws
Pre drill
hole
50mm
screw
1
Loading...
+ 3 hidden pages