Mercia Garden Products 03WES1208-V2 Instruction manual

General Instructions
Please retain product label and instructions for future reference
03WES1208-V2
12x8 Wessex Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
x2
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
All building’s should be erected by two adults
For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
Refer to the instruction pages for youR specic product code
www.merciagardenproducts.co.uk
P 1
03WES1208-V2
Overall Dimensions:
Length = 4028mm Width = 2830mm Height = 2252mm
Base Dimensions:
Length = 3725mm Width = 2413mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
22
23
24
Roof Support Block - 27x70x619mm QTY 2
F2770-659mm (Angled)
Window Beading Strip - 12x17x437mm QTY 8
BDC-437mm
Window Beading Strip - 12x17x348mm QTY 8
BDC-348mm
MADE IN GREAT BRITAIN
1
Door Gable
03WESDG2413X1297-V1
7
2
Plain Gable
03WES1208-V2PG
Window Side QTY 2
8 9
3 4
03WES1208-V2WS
10
Plain Side QTY 2
03WES1208-V2PS
11
5 6
Floor QTY 2
03WES1208-V1F
Veranda Floor
03WES1208VRDF-V1
12
25
Final QTY 2
28
Tower Bolt QTY 2
PI-07-0030
31
Turn Button QTY 2
PI-07-0034
Nail Bag
26
T Hinge QTY 4
PI-07-0021
29
Casement Stay Qty 2
PI-07-0005
32
Handle
PI-07-0032
27
33
Hinge QTY 6
PI-07-0004
30
Press Lock
PI-07-0162
“L” Bracket Qty 2
PI-07-0012
34
“U” Channel Qty 2
PI-07-0013
Roof QTY 4
03WES1208-V1R
13
Veranda Support - 27x44x1685mm QTY 2
F2744-1685mm
14
Fascia - 12x95x1549mm QTY 4
S1295-1549mm
15
Door Strip - 12x60x800mm QTY 2
S1260-1549mm
16
Window Strip - 12x45x1037mm QTY 2
S1245-1037mm
Master Door
03WESMD1720X600-V1
Slave Door
01WESSD1720X600-V1
Veranda Rail
03WESVRDRL-V1
17
Tower Bolt Strip - 19x45x140mm QTY 2
S1945-140mm
18
Cover Trims - 12x56x1665mm QTY 6
S1256-1665mm
19
Door Beading Strip - 12x17x1710mm QTY 2
BDC-1710mm
20
Door Beading Strip - 12x17x1207mm
S1217-1207mm
21
Roof Support - 44x58x2918mm
F4458-2918mm
Window QTY 2
01OW-V1
Glazing QTY 4
PI-05-0038
50mm Screw x110
40mm Screw x26
30mm Screw x84
30mm Black Screw x76
Pre Assembly
Remove the transportation blocks from the bottom of each panel before beginning the assembly.
20mm Screw x14
16mm Black Screw x14
20mm Nails x50
Felt Tacks x180
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
Step 1
Insert the glazing sheet into the window rebate, ensure a ush t. Attach window beading with the 25mm glazing pins provided, x4 pins per beading. When nailing pins protect the glazing sheet with a piece of cardboard or similar to avoid breakage and scratches.
48x25mm Nails
25mm
Nails
24
33
24
12
12
23
23
23
24
24
Step 3
Fix the door beading strips to the door gable using 4x30mm screws for each strip.
Make sure to attatch the strips by screwing into the door gable through the strip
12x30mm Screws.
Pre drill
hole
30mm
screw
20
19
19
Step 2
Fix the T hinges to the top and bottom of each door and a hinge in the middle, as shown in the illustration using 30mm black screws. Secure each door to the door gable again using 30mm black screws.
44x30mm Black Screws
Pre drill
hole
30mm
screw
26
27
Step 4
Attach the door strips to the master door, securing into place using 3x30mm screws per strip.
6x30mm Screws
Pre drill
hole
30mm
screw
15
15
P 3
Loading...
+ 6 hidden pages