![](/html/6c/6c97/6c97dd870a634f407865f16cedf009cec475caece5ece27a529ff8d38d15e361/bg1.png)
General Instructions
Please retain product label and instructions for future reference
03VER1008-V1
10x8 Vermont Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
x2
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
All building’s should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1
![](/html/6c/6c97/6c97dd870a634f407865f16cedf009cec475caece5ece27a529ff8d38d15e361/bg2.png)
03VER1008-V1
Please retain product label and instructions for future reference
Overall Dimensions:
Length = 3028mm
Width = 2484mm
Height = 2569mm
Base Dimensions:
Length = 2974mm
Width = 2360mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
1 2 3 4 5 6 7
Nail Bag
35mm Bolt QTY 4
50mm Screw QTY 105
40mm Screw QTY 20
30mm Screw QTY 147
Pre Assembly
Remove the transportation blocks from
the bottom and top of each panel
before beginning assembly
30mm Black Screw QTY 2
25mm Screw QTY 72
10mm Screw QTY 36
Felt Tacks QTY 132
Door Panel
8 9
Roof
Sheet QTY 4
16
17
Cover Trim - 1976mm QTY 7
Fascia - 1333mm QTY 4
18
Finial QTY 2
Sml Panel
Master
Door
QTY 2
Slave
Door
Panel Right
10 11
Side
Door
Window
12
13
14
15
22
23
Window
Panel Left
Back Panel
QTY 2
Ridge Bar - 1462mm QTY 2
Eaves Frame - 1001mm QTY 6
Roof Support Bar - 1262mm QTY 6
Roof Support Brace - 450mm QTY 6
26
“L” Bracket QTY 2
27
Door Handle QTY 2
“U” Channel
Roof Support Block - 140mm QTY 6
Gable Top
QTY 2
Floor
QTY 2
Step 1
Attach the side doors to the inside framing
of the door panel using 3x butt hinges per
door.
* Fix to the door using 3x25mm screws &
3x30mm screws to the framing per hinge,
ensure the doors open freely,
folding back into the building
unrestricted.
18x25mm Screws
18x30mm Screws
Pre drill
hole
25mm
screw
30mm
screw
11
11
20
19
20
21
Rain Guard - 680mm QTY 2
Butt Hinge QTY 14
Turn Button QTY 2
24
Press Lock
25
Barrel Bolt QTY 6
P 2
![](/html/6c/6c97/6c97dd870a634f407865f16cedf009cec475caece5ece27a529ff8d38d15e361/bg3.png)
Please retain product label and instructions for future reference
Step 2
Fix the master and slave door to
the attached side doors with
6x butt hinges, using 6x25mm
screws per hinge.
*Ensure the doors open freely,
folding back into the building
unrestricted.
48x25mm Screws
Pre drill
hole
25mm
screw
20 20
20 20
9
10
20 20
20 20
Step 4
Place the oor panels upside down onto
a rm and level base. Ensure the base has
suitable drainage, free from areas where
standing water can collect.
Secure the oors together using 8x50mm
screws through the oor bearers in an
alternating pattern.
Once xed together turn the oor back
the right way up.
8x50mm Screws
Pre drill
hole
50mm
screw
7
7
Step 3
Secure the barrel bolts to the top &
bottom of each side door and the
slave door using 6x10mm screws.
Attach the press lock to the master
door with 4x25mm screws, aligning
the barrel with the key hole.
*Ensure the key turns
and locks properly before xing to
the door.
Fix the door handles to the outside
of the master and slave door using
the 35mm bolts provided.
36x10mm Screws
4x25mm Screws
4x35mm Bolts
25
23
24
Step 5
Fix the corners with 50mm
screws as shown in the
illustration.
Do not secure the building
to the oor until the roof
is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
5
3
Pre drill
hole
10mm
screw
25mm
screw
35mm
bolt
P 3