Mercia Garden Products 03BRN0705-V4 Instruction manual

General Instructions
Please retain product label and instructions for future reference
03BRN0705-V4
7X5 BOURNEMOUTH SUMMERHOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
x2
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
All building’s should be erected by two adults
For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1
03BRN0705-V4
Please retain product label and instructions for future reference
Overall Dimensions:
Length = 1768mm
Width = 2291mm
Height = 2168mm
Base Dimensions:
Length = 1448mm
Width = 2082mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
1 2 3 4
5
5 6 7
Pre Assembly
Remove the transportation blocks from the bottom of each panel before beginning the assembly.
Step 1
Place the oor onto a rm and level base. Ensure the base has suitable drainage & is free from areas where standing water can collect.
Door Gable Plain Side
QTY 2
8
Ridge Bar - 1457mm
9
Eaves Frame - 1720mm QTY 2
10
11
12
13
Cover Trim - 1682mm QTY 4
Fascia - 1227mm QTY 4
Angled Fascia Block - 340mm
Fascia Block - 140mm
14
Finial QTY 2
Nail Bag
Plain Gable Floor
15
“L” Bracket QTY 2
16
Butt Hinge QTY 6
17
Turn Button QTY 2
16
Barrel Bolt QTY 2
25mm Screw x38
Roof
Sheet QTY 2
18
19
Master
Door
Slave
Door
Presslock
Door Handle QTY 2
Step 2
Attach the doors to the door gable with 3x butt hinges per door using 36x25mm screws.
Ensure to screw the hinges into the framing.
36x25mm Screws
Pre drill
hole
25mm
screw
4
1
16
67
35mm Bolt x4
50mm Screw x32
40mm Screw x22
30mm Screw x56
16mm Black Screw x2
16mm Screw x4
10mm Screw x10
Felt Tacks x78
P 2
Please retain product label and instructions for future reference
Step 3
Place the plain gable and the rst plain side onto the oor.
Fix the corners with 50mm screws as shown in the illustration, making sure the gable sits inside the panel.
Do not secure the building to the oor until the roof is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
Step 5
3
Attach the “L” brackets centrally
2
to the ridge bar using 2x30mm screws per bracket.
*Measure 67mm from each side of the ridge bar and mark with
8
a pencil. Align the front edge of the bracket with the pencil mark as shown in the illustration.
4x30mm Screws
Pre drill
hole
30mm
screw
15
Step 6
Step 4
Place the door gable and the second plain side onto the oor.
Fix the corners with 50mm screws as shown in the illustration, making sure the gable sits inside the panel.
Do not secure the building to the oor until the roof is tted.
9x50mm Screws
Place the assembled ridge bar inbetween the gables, resting on top of the blocks.
Secure to the gables using 2x30mm screws per side.
*Adjust the “L” brackets if needed.
4x30mm Screws
1
Pre drill
hole
30mm
screw
2
Pre drill
hole
50mm
screw
P 3
Loading...
+ 4 hidden pages