Mercia Garden Products 02SNO0705-V4-PEFC Instruction manual

General Instructions
Please retain product label and instructions for future reference
02SNO0705-V4-PEFC
Snowdrop 7x5 playhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
WARNING: Only for domestic use Not suitable for children under 36 month To be used under direct supervision of an adult
2mm Drill bit
x2
All building’s should be erected by two adults
For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.
For ease of assembly, you will need a tape measure to check dimensions of components.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1
02SNO0705-V4-PEFC
Overall Dimensions:
Width = 2310mm Depth = 1819mm Height = 2020mm
Base Dimensions:
Width = 2082mm Depth = 1448mm
Please retain product label and instructions for future reference
9
10
11
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
1
Rail Guard
AI-02SNO0705-V4CR AI-02SNO0705-V4D
Door
Window
AI-02PHOW-V1
QTY x3
Fixing Kit
12
Bunk Floor Support Bar - 1270mm
13
Roof Eave - 1795mm x2
FS2828-1795MM
14
Roof Support Bar - 1448mm
F2744-1448MM
15
2
3
4
Fascia - 1427mm x2
FAS1295-1427MM
16
Fascia - 1041mm x2
FAS1295-1041MM
17
Fascia Block -140mm
F4444-140MM
F2744-1270MM
Door Gable
AI-02SNO0705-V4DG AI-02SNO0705-V4PG AI-02SNO0705-V4WS AI-02SNO0705-V4PS
5
Plain Gable
6
Window Side
7
Plain Panel
8
18
Support Block - 495mm x3
19
Ladder Left
20
Ladder Step - 390mm x4
21
Finial x2
22
Window
Frame x3
PI-04-0013
F2744-535MM
PRO2795-1365MM-LEFT
PRO2795-390MM
23
Buttery Window
PI-04-0015 PLY TRIANGLE AI-02SNO0705-V4WB
24
Door Stop
Ladder Right
25
Window Box x2
PRO2795-1365MM-RIGHT
Shutters x4
AI-02SNO0705-V4WS PI-04-0024
26
27
Wooden
door handle
Floor
AI-02SNO0705-V4F
Bunk Floor
AI-02SNO0705-V4BF
Large Roof Sheet
Small Roof Sheet
1795 x 1400mm
PI-03-0030 PI-03-0031
1795x990mm
29
Antique Hinge x3
PI-07-0113 PI-07-0012
30
Corner Bracing x2
31
Felt
32
Window Block
PI-07-0011
QTY x6
P 2
Please retain product label and instructions for future reference
Nail Bag
Pre-Assembly
60mm Screw x 21
50mm Screw x 48
40mm Screw x 27
30mm Black Screw x 21
30mm Screw x 69
20mm Screw x 16
10mm Screw x 5
Felt Tacks x 80
Step 2
Lay the door gable face up on a at surface, place the door within the door aperture (support the door from
underneath until it is ush with the boards). Position the door so that you
have a 12mm gap from the door to the door gable on all four sides.
Useful tip: Use a12mm thick piece of timber from your xing kit within the gaps to ensure the door does not move.
Once you are happy the door is in the correct position place a hinge at the top, middle and bottom of the door, ensuring the screws will go into the framing and using 30mm black screws x the hinge to the door and the door gable. Ensure to pre-drill the holes rst.
12mm
12mm
3
Remove transportation blocks from the bottom of each panel before beginning assembly. Each Panel should have two blocks.
Step 1
To x the Windows (No. 11) into the panels that accomodate a window. First x the Window Block to the Window as shown with 1x30mm screw.
Place the Window into the window hole and x by screwing though the Window Block (No. 32) with 2x30mm screws as shown.
Screw into the Window rst.
18x30mm screws.
*Please note that the door can be hung from either side to suit your needs.
21x 30mm black screws
Pre drill
Step 3
Place the Floor (No. 5) on a rm and level base, ensure base has suitable drainage free from areas where standing water can collect. (See front page on base requirements).
5
hole
30mm
screw
Pre drill
hole
30mm
screw
P 3
Loading...
+ 4 hidden pages