General Instructions
Please retain product label and instructions for future reference
01VINLOG0303-V1 & 01VINSTR0303-V1
3x3 Log store and 3x3 store
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
x2
2mm Drill bit
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
All building’s should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a landll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1
01VINLOG0303-V1 & 01VINSTR0303-V1
Please retain product label and instructions for future reference
Overall Dimensions:
Length = 992mm
Width = 1003mm
Height = 1559mm
Base Dimensions:
Length = 968mm
Width = 968mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
1
2
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Step 1
4
Place the oor onto a rm and level
base, ensuring the base has suitable
drainage & is free from areas where
standing water can collect.
3
4
5
6
Right Gable Back Panel
7
Rear Post - 75x75x1511mm QTY 2
8
Front Post - 75x75x1305mm QTY 2
9
Side Fascia - 12x95x1003mm QTY 2
10
Front Fascia - 12x95x991mm
Left Gable
Floor
11
T-Hinge QTY 3
(01VINSTR0303-V1 only)
12
Hasp & Staple
(01VINSTR0303-V1 only)
Roof
(01VINSTR0303-V1 only)
Door
13
Turn Button QTY 2
(01VINSTR0303-V1 only)
Step 2
Place the rst gable, back panel and
rear post onto the oor. Secure each
panel to the rear post using 3x50mm
screws per panel.
*Ensure the panels are ush to the
inside edge of the post.
Fix the panels to the oor with
2x50mm screws per panel, making
sure to align the screws with the
oor bearers.
*Before securing to the oor ensure
the post is ush with end of the oor.
10x50mm Screws
7
2
3
Nail Bag
70mm Screw x5
50mm Screw x26
30mm Screw x11
30mm Black Screw x30
Pre drill
hole
50mm
screw
P 2