01SHPPLSBIK0703-V2
Please retain product label and instructions for future reference
Overall Dimensions:
Length = 849cm
Width = 2223cm
Height = 1721cm
Base Dimensions:
Length = 795cm
Width = 1980cm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to
protect the product during transit and for upto 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a wood preserver within the rst three months of
assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
x2
2mm Drill bit
This building should be erected by
two adults
For ease of assembly, you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
Contents
1 2 3
Door Gable
5
Floor
x2
Back Gable
6
Door
x2
Fixing Kit
7
Eaves Frame 825mm x2
8
Ridge Bar 736mm
9
Fascia 1095mm x4
12
13
10
11
14
Door Block 132mm x4
Plain Side
x2
Finial x2
15
4
Roof
x2
16
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the
highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot
accept responsibility for your safety whilst erecting or
using this product.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and garden
buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For Assistance Please
Contact Customer Care on
01636 880514
T Hinge
Qty 4
Pad Bolt Felt
Turn Button
Qty 2
Nail Bag
30mm Black Screw x 3
40mm Screw x 52
50mm Screw x 26
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
L-Bracket
Qty 2
Felt Tacks x 80
20mm Screw x 8
30mm Screw x 56
Pre Assembly
Remove transportation blocks
from the bottom of each panel
before beginning assembly.
Each Panel should have two
blocks.
Step 1
Place floor on firm and level base, ensure
base has suitable drainage free from areas
where water can collect. (See front page on
base requirements).
Attach the floors using 10 x 40mm screws
10 x 40mm screws
5
5
Fix the T Hinges onto
the door and door
frame in line with the
door blocks.
28x30mm screws
6
1
6
12
Step 2
Fix the corners with 50mm
screws as shown in diagram.
Do not secure the building to
the floor until the roof is fitted.
Fix the panels onto the floor
using 50mm screws in alignment with the floor joists
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
3x50mm Screws
2
3