Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan. Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry. Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and garden buildings.Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
01636880514
Base Dimensions
Length = 252cm Width = 190cm Height = 214cm
1
Door Panel
6
9
Side Panel
2
Plain Panel x3
7
10
3
Floor Panel
4
Side Gable Left & Right
5
8
Glazed Roof
12
Roof Panel x2
30
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are delivered pre-treated with a water based timber treatment however this only helps to protect during transit of your garden item. To
validate your guarantee and for better protection against weathering it is ESSENTIAL that you treat the garden building with a wood preserver within 3
months of assembly. This will need to be re-applied annually to ensure longevity of your building. Care must be taken when constructing the garden building that it is not touching the ground and is on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
2mm Drill bit
x2
This building should be erected by two people.
For ease of assembly, you must pilot drill all screw holes and ensure all screw heads are countersunk.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
For Assistance Please
Contact Customer Care on
Bench
FIXING KIT
Angled cut cover trim -2046mm x2
13
Glazed Roof Fascia -1272mm x2
14
Panel Cover Trim - 1793mm x3
15
Side Panel Trim -1004mm x2
16
Bench Support Frame - 958mm
17
Roof Strip- 50x1273mm x2
18
Door
11
Opening Window
Gable Top Left & Right
Bench Support Block - 120mm
19
Bench Support Frame - 657mm x2
20
Window Frame - 650mm
21
Fascia - 70x1273mm x2
22
Fascia - 1340mm x2
23
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
IRONMONGERY & NAIL BAG
Casement Stay
24
26
Felt
Pad bolt
25
Pre Assembly
Fix the T Hinges onto the doors and door frame as shown. Ensure that the screws go through the cladding and into the framing behind.
27
28
Turn button x2
2x Small hinge
29
30
29
T Hinge Qty 3
Felt Tacks x60
16mm Black Screw x25
30mm Screw x61
40mm Screw x35
50mm Screw x67
70mm Screw x15
Step 2
Fix the corner with 3x 50mm screw a shown in diagram.
Do not secure the building to the oor until the roof is tted. Fix the panels onto the oor using 50mm screws in alignment with the oor joists.
2
50mm
screw
The door and plain
panels are
interchangeable and can
be positioned in a variety
of congurations, Decide
which works best before
assembly .
(see end of step 3)
1
7 x 50mm screws
21x30mm screws
Step 1
Remove transportation blocks from the bottom of each panel before beginning assembly. Each Panel should have two blocks.
Place oor on a rm and level base, ensure base has suitable drainage free from areas where standing water can collect. (See front page on base requirements).
Important
Check each panel and remove any transportation blocks before assembly
3
Step 3
Fix the second set of panels using same method shown in step 2.
3
50mm
screw
1
10 x 50mm screws