General Instructions
Please retain product label and instructions for future reference
N/A
Overlap
Cladding
Shiplap
Cladding
Windows
01OVLPP0705SDFW-V1
7x5 Overlap pent single door fixed window
01OVLPP0806SDFW-V1
8x6 Overlap pent single door fixed window
01OVLPP1006SDFW-V2
10x6 Overlap pent single door fixed window
Fixed
Opening
Windows
No
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to
protect the product during transit and for upto 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a wood preserver within the rst three months of
assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
Solid Sheet
Floor
T&G Floor
Solid Sheet
Roof
x2
2mm Drill bit
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
T&G Roof
All building’s should be erected by two
adults
For ease of assembly, it is advisable to
pilot drill all screw holes and ensure
all screw heads are countersunk.
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
Refer to the instructions pages for you specic product code
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the
highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot
accept responsibility for your safety whilst erecting or
using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Avoid breathing dust when cutting treated or untreated wood.
For Assistance Please
Contact Customer Care on
01636 880514
**Protim Fentex E5**
Wear gloves when handling freshly treated wood.
Dispose of o-cuts responsibly – do not burn.
P 1
01OVLPP1006SDFW-V2
Please retain product label and instructions for future reference
Overall Dimensions:
Length = 1871mm
Width = 3028mm
Height = 2060mm
Base Dimensions:
Length = 1757mm
Width = 2974mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
Building Content
18
T Hinge
Qty 3
20
Pad Bolt
Qty 1
19
Turn Button
Qty 2
21
Felt
Pre Assembly
Remove transportation
blocks from the bottom
of each panel before
beginning assembly. Each
Panel should have two
Nail Bag
Felt Tacks x 100
30mm Black Screw x 2
30mm Screw x 72
40mm Screw x 36
50mm Screw x 48
1
Door Panel
8
Roof Sheet
Qty 2
2ft Front
Plain Panel
9
Door
2
3
4
5
6
7
Fix the T Hinges onto the
Right Gable
10
Ridge Bar - 1714mm Qty 3
11
Eaves Frame - 1502mm Qty 2
12
Door Block- 140mm Qty 1
Left Gable
Plain Panel
2ft Back
Plain Panel
Floor
Qty 2
door and door frame as
shown. Ensure that the
screws go through the
cladding and into the
framing behind.
21x30mm screws
Pre drill
hole
30mm
screw
1
18
13
Side Fascia- 1873mm Qty 2
14
Front Fascia- 1514mm Qty 2
15
Front Cover Trims- 2020mm Qty 3
16
Back Cover Trims- 1800mm Qty 3
17
Door Strip - 1720mm Qty 2
7
P 12