01OSBP0602/01OVLP0602-V2
PLEASE READ INSTRUCTIONS CAREFULLY.
For Assistance Please Contact Customer Care on
Please retain product label and instructions for future reference
Drill
2mm bit
For ease of assembly, it is
advisable to pilot drill all
screw holes and ensure all
screw heads are countersunk.
WI NTER = HIG H M OIS TUR E = EXPA NSI ON
SU MMER = LOW MOI STU RE = C ONTR ACT ION
01636880514
Front Panel
Gable x2
(Shiplap only)
Gable x2
(Overlap only)
Rear Panel
Door x2
*Shiplap version
x2
This building should be erected by two people.
Tools required for installation (not supplied)
Screwdriver (cross point), Stanley knife, wood saw
and step ladders.
shown in illustrations
Dimensions
Height = 1960mm
Width = 1786mm
Depth = 797mm
Before you start...
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against
mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst
three months of assembly and thereafter in accordance with the manufactures recommendations.
NATURAL MOVEMENT OF TIMBER THROUGHOUT THE SEASON
Timber is a natural material and will, during the year pick up moisture in damp periods and dry out during hot spells. There will be constant expansion
and contraction of the timbers which will be particularly noticeable during the dry periods as the boards will shrink, this is why all buildings have
slight tolerances built into them.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Roof Panel
Eave Framing-1786mm
4x Corner Trim -1759mm (Shiplap only)
Floor Panel
(Overlap)
Floor Panel
(Shiplap)
Gable tops
(Shiplap only)
2x Door block -140mm
Rear Fascia -1810mm
2x Side Fascia -830mm
2x Corner Trim -1918mm (Overlap only)
2x Corner Trim -1818mm (Overlap only)
Iron mongery & Nail Bag Contents
Felt
10mm Felt Tacks x80
30mm Screw x80
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run o for water. It is also recommended
that the oor be at least 25mm above the surrounding ground level to avoid ooding.
Whilst all products manufactured at Walton Garden Buildings Limited are made to the highest standards of Safety and in the case of
childrens products independently tested to EN71 level, Walton Garden Buildings Limited cannot accept responsibility for your safety whilst
erecting or using this product.
Turn Key x2
Pad bolt
Door hinge x4
40mm Screw x15
50mm Screw x30
Step 1
Remove transportation blocks
from the bottom of each panel
before beginning assembly.
Each Panel should have two
blocks.
Assembly
Step 2
Place floor on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water
can collect. (see front page
on base requirements).
Step 4
Fix door gable and front panel
using same method shown in
step 3.
15 x 50mm screws
Step 3
Fix the corners with 3x
50mm screw a shown in
diagram.
Do not secure the building
to the floor until the roof is
fitted. Fix the panels onto
the floor using 50mm
screws in alignment with
the floor joists
Position the panels so there is
equal spacing between the
floor and cladding on all 4 sides
Step 5
*Shiplap Only
Place the Gable Top onto the
plain gable, ensuring the
cladding and framing on either
side is flush with gable. Fix with
2x30mm screws as shown in
diagram.
9 x 50mm screws
4 x 30mm screws
*Shiplap Only