General Instructions
Please retain product label and instructions for future reference
01OBS0406-V1
4x6 Overlap Pent Bike Store
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
x2
2mm Drill bit
**Protim Aquatan T5 (621)**
Protim Aquatan* T5 is a coloured, water-based concentrate which is diluted with water to make a solution
for application to unseasoned timber. Protim Aquatan T5 treated wood is not protected against wood
destroying insects or wood decaying fungi. Further preservative treatment is required to protect against
these organisms.
Contains: Boric Acid, Sodium Hydroxide 32% solution, aqueous mixture of sodium dioctyl sulphosuccinate &
alcohols: 2,4,6-Trichlorophenol.
All building’s should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timer.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Hazard Statements:
H315: Causes skin irritation.
H319: Causes serious eye irritation.
H412: Harmful to aquatic life.
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood.
Dispose of o-cuts responsibly – do not burn.
IF SKIN IRRITATION OCCURS: Get medical advice/attention.
IF IN EYES: Rinse cautiously with water for several minuets. Remove contact lenses, and continue rinsing. If
the irritation persists: Get medical advice/attention.
DO NOT INGEST.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
Refer to the instructions pages for you specic product code
www.merciagardenproducts.co.uk
P 1
01OBS0406-V1
Please retain product label and instructions for future reference
Overall Dimensions:
Length = 1952mm
Width = 1253mm
Height = 1230mm
Base Dimensions:
Length = 1900mm
Width = 1180mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
1
2
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Step 1
Place the two oors onto a rm and level
3
4
5
6
7
base upside down.
5
5
Front Panel
8
9
10
11
12
13
Roof Support: 28x28x1138mm
Door Frame: 28x28x1085mm QTY 2
Door Side Frame: 28x28x1118mm
Eaves Frame: 28x28x969mm QTY 2
Trim: 45x7x1247mm QTY 11
Door Side Trim: 28x7x1118mm
Right Gable
Left Gable
Back Panel
14
Butt Hinge QTY 4
15
Turn Button QTY 3
16
“L” Bracket
Floor QTY 2
Door QTY 2
Roof QTY 2
Secure the oors together using 3x50mm
screws, xing in an alternating pattern
as shown in the illustration.
Once tted, turn the oor assembly the
right way up.
Ensure the base has suitable drainage & is
free from areas where standing water can
collect.
3x50mm Screws
Pre drill
hole
50mm
screw
Nail Bag
50mm Screw x42
30mm Screw x84
30mm Black Screw x4
20mm Screw x4
Felt Tacks x60
P 2