Mercia Garden Products 01COR0707-V1 Instruction manual

General Instructions
Please retain product label and instructions for future reference
N/A
Overlap
Cladding
01COR0707-V1
7x7 Corner Shed
Shiplap
Cladding
Fixed
Windows
Opening
Windows
No
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the rst three months of assembly and thereafter in accordance with the manufactures recommenda­tions. Care must be taken to ensure the product is placed on a suitable base.
Solid Sheet
T&G Floor
Solid Sheet
Roof
x2
2mm Drill bit
CAUTION
Every eort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timer.
T&G Roof
All building’s should be erected by two adults
For ease of assembly, it is advisable to pilot drill all screw holes and ensure all screw heads are countersunk.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction
Refer to the instructions pages for you specic product code
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Avoid breathing dust when cutting treated or untreated wood.
For Assistance Please
Contact Customer Care on
01636 880514
**Protim Fentex E5**
Wear gloves when handling freshly treated wood.
Dispose of o-cuts responsibly – do not burn.
P 1
01COR0707-V1
Please retain product label and instructions for future reference
Overall Dimensions:
Length = 2076mm
Width = 2073mm
Height = 1972mm
Base Dimensions:
Length = 1960mm
Width = 1959mm
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
1 2 3 4 5 6 7 8
Nail Bag
80mm Screw x7
50mm Screw x40
40mm Screw x40
Pre Assembly
Remove the transportation blocks from the bottom of each panel before beginning the assembly.
30mm Screw x90
30mm Black Screw x3
20mm Screw x6
Felt Tacks x80
Door
Panel
9
10
11
12
13
14
15
16
17
Window
Panel
Roof Support Bar - 2650mm
Roof Support Bar - 1303mm
Roof Support Bar - 763mm
Roof Support Block - 210mm QTY 3
Door Block - 140mm QTY 2
Eaves Frame - 2049mm
Eaves Frame - 2025mm
Eaves Frame - 1149mm
Eaves Frame - 1169mm
Plain
Panel
Rear Panel
Right
Rear Panel
Left
20
21
22
23
24
25
26
27
Floor Roof Sheet
Fascia - 1213mm
Cover Trim - 1800mm QTY 2
Cover Trim - 1918mm QTY 4
Door Trim Top - 543mm
Door Trim Bottom - 1040mm
Panel Joint Frame - 1806mm
T-Hinges QTY 4
Turn Buttons QTY 3
Door
QTY 2
Step 1
Place the oor on to a rm & level base. Ensure the base has suitable drainage, free from areas where standing water can collect.
6
18
Fascia - 2045mm QTY 2
19
Fascia - 1202mm QTY 2
28
“L” Brackets QTY 5
P 2
Please retain product label and instructions for future reference
Step 2
Place the rear panel right onto the oor.
Fix the panel joint frame to the back of the panel using 3x50mm screws.
3x50mm Screws
Pre drill
hole
50mm
screw
25
Step 4
4
Place the plain & window panel onto the oor.
Secure the plain panel and the window panel to the rear panels using 3x50mm screws.
The window and plain panels can be placed either side of the building.
Do NOT screw the building to the oor until the roof is tted.
6x50mm Screws
Step 3
Place the rear panel left onto the oor.
Secure the panel to the panel joint frame using 3x50mm screws.
Do NOT screw the building to the oor until the roof is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
1
Step 5
5
Secure the doors to the door panel using 2x T-hinges per door, xing into place using 7x30mm screws per hinge.
Ensure to screw through the framing.
28x30mm Screws
Pre drill
hole
30mm
screw
8
8
Pre drill
hole
50mm
screw
26
P 3
Loading...
+ 4 hidden pages