Load section length (L1) Clear load area (L2)
4' 7-1/8" (1400mm) 2' 11-3/8" (900mm)
7' 10-1/2" (2400mm) 6' 2-3/4" (1900mm)
*7' 10-1/2" (2400mm) 6' 2-3/4" (1900mm)
* With optional 2' 6-3/8" (770mm) loading height
*
D
1' 7-5/8"
[500mm]
Load section length
(L1)
Clear load length
(L2)
Load Sections - CSS Basic
3' 2" [965mm]
Load section length (L1) Clear load area (L2)
5' 6-7/8" (1700mm) 2' 11-3/8" (900mm)
*8' 10-3/8" (2700mm) 6' 2-3/4" (1900mm)
* With optional 2' 6-3/8" (770mm) loading height
*
Load Sections - CSS Top
D
2' 7-1/2" [800mm]
Load section length
(L1)
Clear load length
(L2)
3' 2" [965mm]
H,C
SS
CR
Unload section length (U1) Clear unload area (U2)
6' 2-3/4" (1900mm) 2' 11-3/8" (900mm)
8' 6-3/8" (2600mm) 5' 3" (1600mm)
9' 10-1/8" (3000mm) 6' 6-3/4" (2000mm)
10' 9-7/8" (3300mm) 7' 6-1/2" (2300mm)
11' 9-3/4" (3600mm) 8' 6-3/8" (2600mm)
13' 1-1/2" (4000mm) 9' 10-1/8" (3000mm)
16' 7/8" (4900mm) 12' 9-1/2" (3900mm)
Unload Sections - Standard
(no blower dryer)
3'3-3/8"[1000mm]
Unload section length
(U1)
Clear unload length
(U2)
Single blower dryer
Unload section length (U1) Clear unload area (U2)
10' 9-7/8" (3300mm) * 5' 3" (1600mm) *
11' 9-3/4" (3600mm) * 6' 2-3/4" (1900mm) *
13' 1-1/2" (4000mm) * 7' 6-1/2" (2300mm) *
16-7/8" (4900mm) * 10' 6" (3200mm) *
* Not recommended for some applications. Consult
Meiko before ordering.
Unload Sections -
with Blower Dryer
3' 3-3/8" [1000mm]
Unload section length
(U1)
Single blower dryer: 2' 3-1/2" [700mm]
Dual blower dryer: 5' 5" [1650mm]
Dual blower dryer
Unload section length (U1) Clear unload area (U2)
11' 9-3/4" (3600mm) 3' 1-3/8" (950mm)
13' 1-1/2" (4000mm) 4' 5-1/8" (1350mm)
16-7/8" (4900mm) 7' 4-5/8" (2250mm)
H,C
SS
CR
Clear unload length
(U2)
D
Electrical connection
Machines with electric heat:
Machines with steam heat:
4 (four)
terminal blocks centered at location
shown.
1 (one)
terminal block at location shown.
Each terminal block is 4-wire with
ground (no neutral).
Opening(s) in the machine for the
supply lines are NOT provided and
should be executed on-site using
appropriate strain relief device(s).
Individual
disconnect with lockout/tagout strongly
recommended for each supply
(provided by customer).
Vent connection
Indirect connection to machine required
to avoid negative pressure inside
dishwasher. See
The connection must be corrosion-
resistant and frost-free. In particular,
provision must be made to prevent air
temperatures of 32°F/0°C or colder
from reaching the machine at any time.
A provision for draining moisture from
the waste air pipe is STRONGLY
RECOMMENDED.
Detail View: Vent.
Warm water connection
Used only for initial fill
Used for both initial fill and final rinse
on units with
Waste Air Heat Recovery System.
(single water connection) on all other
machines.
3/4" NPT, 110-140°F (43-60°C), 15-25
PSI
Cold water connection
Used only for final rinse on units
equipped with Waste Air Heat Recovery
System. Not present on other units.
1/2" NPT, 50°F (10°C), 15-25 PSI
C
H
Utilities
Steam connection
2" NPT, 15-30 PSI (1-2 bars).
For steam pressures below 15 PSI (1
bar), contact the factory. For pressures
above 30 PSI (2 bars), a regulator is
required (supplied by customer).
CONSTANT steam pressure is
REQUIRED. If supply pressure is
variable, use of a regulator is
REQUIRED (supplied by customer).
S
Condensate return connection
1-1/4" NPT. Condensate return line
MUST be pressure-free.
CR
Steam Utilities
(if so equipped)
Drain
2-15/16” (75mm) OD vertical, gravity-
fed drain outlet (HDPE piping). Optional
2" NPT male adapter supplied.
4” floor drain recommended. Additional
piping to drain (if so required) to be
supplied by customer.
Approx. flow rate 57 gpm (217 liters/min).