To measure the Phase-Neutral voltage, connect the RED and BLUE plug of the mains socket test lead to the
instrument.
To measure the voltage of the electrical supply using the RED / GREEN test leads:
1. Set the instrument to the [V/Hz] range.
2. Connect the GREEN test lead to the Protective Earth (PE) and the RED test lead to the phase to be
measured.
3. The instrument will display the voltage and the frequency.
4. Alternatively the instrument can be connected Phase to Neutral to measure the Phase-Neutral voltage.
6.2 Phase to Phase voltage and frequency measurement
1. Set the instrument to the [V/Hz] range.
2. Connect the GREEN test lead to one phase and the RED test lead to another phase.
3. The instrument will display the voltage and the frequency.
7. Saving and downloading test results (LTW335 only)
7.1 Storing LOOP test results:
Test results storage has the following structure within the instrument:
Jb:00, Jb:01… 99 = Job number
db:01 , db:02, db:03 …99 = Distribution board Number
Ct:01 , Ct:02, Ct:03…99 = Circuit number
Ln:LL, Ln:LE, Ln:LN, Ln:NE = Line connection
Ph: 1, Ph: 2, Ph: 3 = Phase
tS:VF, tS:nt,tS:tr = Test type
R000 to R999 = Record number
Definitions:
Jb:00, Jb:01…………………………. Job number acts as work folders. Sets of results can be saved
to a particular job number and easily separated when
downloaded.
db:01, db:02………………………… Distribution board number. Results can be assigned a specific
distribution board number.
Ct:01, Ct:02… ……………………… Circuit reference. Results can be assigned a specific circuit
reference number.
Ln:LL, Ln:LE … …Line connection: Test lead connections (ie Live to Earth = Ln:LE)
Ph: 1,Ph: 2,Ph:… 3 Phase number: Each test can be stored under a particular phase, P1,
P2 or P3.
tS:VF, tS:nt, tS:tr ……… Test type: Each test result is automatically assigned the test
type. VF represents Voltage Frequency test, nt is no-trip test
and tr is high current test.
R000, R001Unique Record number: Each test result is assigned a unique record number,
from 0 to 999 logged automatically. This cannot be changed
by the user.
7.2 To store a result
1. Make a Z, MaxZ, Zref or R1+R2 loop measurement as described in Section 5.
2. Press STORE to enter the storage menu.
3. Select job reference number using the UP/DOWN keys then press NEXT. Hold the key down to scroll
quickly through the numbers.
4. Select distribution board number (db:01, db:02 etc) using UP/DOWN keys then press NEXT.
5. Select circuit number (Ct:01,Ct:02 etc) using the UP/DOWN keys then press NEXT.
6. Select Ln:LL, Ln:LE, Ln:LN, Ln:NE by pressing the UP/DOWN keys, then press NEXT.
7. Select the Phase using the UP/DOWN keys then press NEXT. The screen will display a unique record
number, which is attached to that particular test.
8. Press OK to save the result.
9. Press ESC to skip at any point.
7.3 To store a subsequent result:
To save the next test under the same job number, distribution board etc.
1. Make another measurement as described earlier and press STORE.
2. The last Job number will be displayed. Press OK.