we have made up this operating manual in such a way that all necessary information about the
product can be found and understood quickly and easily.
Should you still have any question, please do not hesitate to contact M&C directly or go through your
appointed dealer. Respective contact addresses are to be found in the annexe to this operating
manual.
Please also contact our homepage www.mc-techgroup.com for further information about our
products. There, you can read or download the data sheets and operating manuals of all M&C
products as well as further information in German, English and French.
Gas sampling and gas conditioning technology2-2.2ME
3
Content
1 General information ................................................................................................................... 4
2 Declaration of conformity .......................................................................................................... 4
Fax: 02102 / 935 - 111
E - mail: info@mc-techgroup.com
www.mc-techgroup.com
1 GENERAL INFORMATION
The product described in this operating manual has been examined before delivery and left our works
in perfect condition related to safety regulations. In order to keep this condition and to guarantee a
safe operation, it is important to heed the notes and prescriptions made in this operating manual.
Furthermore, attention must be paid to appropriate transportation, correct storage, as well as
professional installation and maintenance work.
All necessary information a skilled staff will need for appropriate use of this product are given in this
operating manual.
2 DECLARATION OF CONFORMITY
CE - Certification
The product described in this operating manual complies with the following EC directives:
EMV-Instruction
The requirements of the EC directive 2004/108/EC “Electromagnetic compatibility“ are met.
Low Voltage Directive
The requirement of the EC directive 2006/95/EC “Low Voltage Directive“ are met.
The compliance with this EC directive has been examined according to DIN EN 61010.
Declaration of conformity
The EU Declaration of conformity can be downloaded from the M&C homepage or directly requested
from M&C.
3 SAFETY INSTRUCTIONS
Please note the following basic safety procedures when using this equipment:
Gas sampling and gas conditioning technology2-2.2ME
5
Read these operating instructions carefully before start-up and use of the equipment! The information
and warnings given in these operating instructions must be heeded.
Work on electrical equipment is only to be carried out by trained specialists as per the regulations
currently in force.
Attention must be paid to the requirements of VDE 0100 when setting high-power electrical units with
nominal voltages of up to 1000V, together with the associated standards and stipulations.
Check the details on the type plate to ensure that the equipment is connected up to the correct mains
voltage.
Protection against touching dangerously high electrical voltages. Before opening the equipment, it
must be switched and hold no voltages. This also applies to any external control circuits that are
connected.
The equipment is only to be set within the permitted range of temperatures and pressures.
The device must not be used in hazardous areas.
Check that the location is weather-protected. It should not be subjected to either direct rain or
moisture.
Installation, maintenance, monitoring and any repairs may only be done by authorised personnel with
respect to the relevant stipulations.
4 WARRANTY
If the equipment fails, please contact M&C directly or else go through your M&C authorised dealer.
We offer a one year warranty as of the day of delivery as per our normal terms and conditions of sale,
and assuming technically correct operation of the unit. Consumables are hereby excluded. The terms
of the warranty cover repair at the factory at no cost or the replacement at no cost of the equipment
free ex user location. Reshipments must be send in a sufficient and proper protective packaging.
Gas sampling and gas conditioning technology2-2.2MD
6
DANGER!
This means that death, severe physical injuries and/or important
material damages will occur in case the respective safety measures
are not fulfilled.
WARNI N G!
This means that death, severe physical injuries and/or important
material damages may occur in case the respective safety
measures are not fulfilled.
CARE!
This means that minor physical injuries may occur in case the
respective safety measures are not fulfilled.
CAR E !
Without the warning triangle means that a material damage may
occur in case the respective safety measures are not met.
ATT E NTION!
This means that an unintentional situation or an unintentional status
may occur in case the respective note is not respected.
NOTE!
These are important information about the product or parts of the
operating manual which require user’s attention.
SKILLED STAFF
These are persons with necessary qualification who are familiar with
installation, use and maintenance of the product.
5 USED TERMS AND SIGNAL INDICATIONS
Gas sampling and gas conditioning technology2-2.2ME
7
6 APPLICATION
The electrically heated M&C sample probe tube SP34-H is used in extracting portable sampling
systems to avoid cooling and condensation of sample in the insitu tube from the sample point to the
heated sample probe PSP4000-H.
7 DESCRIPTION
The standard length of electrically heated M&C sample tube SP34-H is 1000 mm (other length on
request).
The sample tube has G3/8" threads on both ends. With the outside thread it will be screwed into the
inlet of the sample probe PSP4000-H. Into the inside thread at the other end, a non heated sample
tube or prefilter can be fixed. The electrical heater is inside of a double tube system, completely
separated from the process.
Figure 1 Dimensions SP34-H
8 TEMPERATURE CONTROLLER
For the standard version SP34-H the temperature is controlled by an integrated capillary thermostat,
built in the terminal box. The temperature is adjustable in the range of 100-180 °C. An external
temperature controller is not necessary. For the version SP34-H1.1 with thermocouple or SP34-H2
with PT100 in contrast an external temperature controller is necessary.
Gas sampling and gas conditioning technology2-2.2MD
9 TECHNICAL DATA
SP 34-H
SP 34-H1.1
SP 34-H2
Part No.
40S9115
40S9120
40S9125
Temperature sensor
Capillary sensor
Fe-CuNi
PT100
Temperature controller
Thermostate
optional, external
Tube length
1 m standard
Connections
INLET G3/8" inside thread, OUTLET G3/8" outside thread, DIN ISO 228/T
Material
Stainless steel SS316Ti
Operating temperature
max. 180 °C
Sample temperature
max. 400 °C
Ambient temperature (controller)
-20°C bis +60 °C
Power supply
230V 50Hz 400W, with 4 m of cable / 115V 60Hz
Degree of protection / Electrical
equipment standard
IP54 EN60529 / EN 61010, EN60519-1
Option:
Part No. 02S9036
Additional price for SP34-H with power supply 115V 60Hz
WA R N ING!
When connecting the equipment, please ensure that the supply
voltage is identical with the information provided on the model
type plate.
10 MOUNTING
8
Screw in the heated sample tube with 3/8“ sealing into the sample gas inlet of the portable gas sample
probe PSP4000-H.
11 ELECTRICAL CONNECTIONS
The electrical connection for the heated sample tube is done by the provided power cable with 4m
length. This will be connected with the 7-pole plug at the connection box of the heated sample tube
and connected to the mains with the IEC-plug.
Figure 2 Electrical connection SP34-H
Gas sampling and gas conditioning technology2-2.2ME
9
WA R N ING!
Before starting up check whether the mains power supply
voltage corresponds with the information stated on the
nameplate.
WA R N ING!
Start up only the built-in heated probe tube because otherwise
there is a risk of burning !
Temperature sensor
Figure 3 Pin assignment for electrical connection of SP34-H2 and SP34-H1.1
12 STARTING
Prior to starting the device, the system and process-specific safety measures must be observed. For
the media to be supplied, the relevant safety requirements and measures must be taken into account.
The following step-by-step procedure is recommended :
Check temperature set value at external controller. Thereto remove lid of the connection box.
Switch on mains power supply.
The heated sample tubes are ready for operation after 2 hours heat-up time.
Gas sampling and gas conditioning technology2-2.2MD
10
WARNI N G!
The safety instructions specific to the plant and process are to be
consulted prior to any maintenance work!
WA R N ING!
When working during operation:
High surface temperatures!
Touching the surfaces can result in burns. Wear protective gloves
and protect against unauthorized access !
13 MAINTENANCE
Maintenance of the heated sample tube is limited to the cleaning of the surfaces.
14 SWITCHING OFF
For switching off no specific measures need to be taken.
15 APPENDIX
More product documentation is available on our Internet catalogue:
www.mc-techgroup.com
Gas sampling and gas conditioning technology2-2.2ME
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.