we have made up this operating manual in such a way that all necessary information about the product can be found and understood quickly and easily.
Should you still have any question, please do not hesitate to contact M&C directly or go through your
appointed dealer. Respective contact addresses are to be found in the annexe to this operating manual.
Please also contact our homepage www.mc-techgroup.com for further information about our products. There, you can read or download the data sheets and operating manuals of all M&C products as
well as further information in German, English and French.
Gas sampling and gas conditioning technology 6-1.1.10-ME
3
List of Contents
1 General information ...................................................................................................................... 4
2 Declaration of conformity ............................................................................................................ 4
The product described in this operating manual has been examined before delivery and left our works
in perfect condition related to safety regulations. In order to keep this condition and to guarantee a
safe operation, it is important to heed the notes and prescriptions made in this operating manual.
Furthermore, attention must be paid to appropriate transportation, correct storage, as well as professional installation and maintenance work.
All necessary information a skilled staff will need for appropriate use of this product are given in this
operating manual.
2 DECLARATION OF CONFORMITY
CE - Certification
The product described in this operating manual complies with the following EC directives:
EMV-Instruction
The requirements of the EC directive 2004/108/EC “Electromagnetic compatibility“ are met.
Low Voltage Directive
The requirement of the EC directive 2006/95/EC “Low Voltage Directive“ are met.
The compliance with this EC directive has been examined according to DIN EN 61010 part 1, EN
50081 part 1 and EN 50082 part 1.
Declaration of conformity
The EU Declaration of conformity can be downloaded from the M&C homepage or directly requested
from M&C.
Gas sampling and gas conditioning technology 6-1.1.10-ME
5
3 SAFETY INSTRUCTIONS
Please take care of the following basic safety procedures when mounting, starting up or operating this equipment:
Read this operating manual before starting up and use of the equipment. The information and warnings given in this operating manual must be heeded.
Any work on electrical equipment is only to be carried out by trained specialists as per the regulations
currently in force.
Attention must be paid to the requirements of VDE 0100 (IEC 364) when setting high-power electrical
units with nominal voltages of up to 1000 V, together with the associated standards and stipulations.
Check the details on the type plate to ensure that the equipment is connected to the correct mains
voltage.
Protection against touching dangerously high electrical voltages:
Before opening the equipment, it must be switched off and hold no voltages. This also applies to any
external control circuits that are connected.
The device is only to be used within the permitted range of temperatures and pressures.
Check that the location is weather-protected. It should not be subject to either direct rain or moisture.
The device must not be used in hazardous areas.
Installation, maintenance, monitoring and any repairs may only be done by authorized personnel with
respect to the relevant stipulations.
4 WARRANTY
If the equipment fails, please contact M&C directly or else go through your M&C authorised dealer.
We offer a one year warranty as of the day of delivery as per our normal terms and conditions of sale,
and assuming technically correct operation of the unit. Consumables are hereby excluded. The terms
of the warranty cover repair at the factory at no cost or the replacement at no cost of the equipment
free ex user location. Reshipments must be send in a sufficient and proper protective packaging.
Gas sampling and gas conditioning technology 6-1.1.10-ME
6
DANGER!
This means that death, severe physical injuries and/or important
material damages will occur in case the respective safety measures
are not fulfilled.
WAR N ING !
This means that death, severe physical injuries and/or important
material damages may occur in case the respective safety measures are not fulfilled.
CARE!
This means that minor physical injuries may occur in case the
respective safety measures are not fulfilled.
CAR E!
Without the warning triangle means that a material damage may
occur in case the respective safety measures are not met.
ATT ENT I ON !
This means that an unintentional situation or an unintentional status
may occur in case the respective note is not respected.
NOTE!
These are important information about the product or parts of the
operating manual which require user’s attention.
SKILLED STAFF
These are persons with necessary qualification who are familiar with
installation, use and maintenance of the product.
5 USED TERMS AND SIGNAL INDICATIONS
Gas sampling and gas conditioning technology 6-1.1.10-ME
7
NOTE!
The diaphragm pumps series MP06/12 are not allowed for liquid medium.
Maximum temperature for medium during operating: -20°C .... +80°C. Before
use please check the compatibility of the material.
6 INTRODUCTION
Due to the implementation of resistant materials the pump type MP06/12 can be used in a wide range
of applications with aggressive and corrosive gases.
7 DESCRIPTION
The pump head and all wetted parts of the diaphragm pumps type MP06/12 are made of PTFE respectively FKM. This grants a high resistance against aggressive and corrosive components in the
sample.
The pumps work 100% lubricant free which means that the sample remains analytical unaffected.
The special diaphragm and valve system guarantees a high level of reliability and a minimum of maintenance.
The pumps are available in 230V 50Hz.
The maximum flow capacity of the MP06 is 5,5 l/min. For higher flow up to maximum 11 l/min we
recommend the pump type MP12.
The range of the sample temperature during operation lies between –20 °C and maximum +80 °C.
Figure 1 Performance characteristics MP06/12
Gas sampling and gas conditioning technology 6-1.1.10-ME
8
WAR N ING !
Aggressive medium is possible.
Wear protective glasses and proper protective clothing during
disassembly, repair or cleaning!
NOTE!
Components connected to the pump must be designed according
to the pneumatic performance of the pump. (see technical data)
Take care that safety regulations are observed when connecting
the pump to the power supply.
Specific safety instructions concerning sample must be observed.
Pump series MP
Version MP06
Version MP12
Part-No.
03P1000
03P1000a
03P2000
Power supply
230V 50Hz,
70 VA
115V 60Hz,
70 VA
230V 50Hz,
70 VA
Capacity max. without pressure
5,5 l/min
11 l/min
Operating pressure max.
0,25 to 1,8 bar abs.
Sample temperature
-20 to +80°C
Ambient temperature
-10 to +40°C
Storage temperature
-15 to +60°C
Operation mode
100% continuous duty, start of the pump only without pressure!
Protection
IP 54 EN 60529
Weight
2,4 kg
Gas connections
G1/8” i DIN ISO 228T1
Material of sample wetted parts
PTFE, FKM
7.1 AMBIENT CONDITIONS
During operation the following ambient conditions must be kept:
Ambient temperature during operating: -10°C .... + 40°C.
The pump must be protected against the effects of dust and water.
During operating an adequate supply of air for cooling must be provided.
7.2 SAFETY
The protection class of the pumps MP06/12 is IP54. In case a high content of water and/or dust loading in the ambience, measures have to be taken to protect the pump before starting-up.
The pumps may only be used for their intended purpose.
8 TECHNICAL DATA
Gas sampling and gas conditioning technology 6-1.1.10-ME
9
NOTE!
The equipment should be stored in a protected, frost-free room!
NOTE!
The pump must only be used in the conditions specified in the technical
data.
The pump should be installed away from heat sources and freely ventilated
to prevent any accumulation of heat.
For outdoor installation, the pump must be installed in a housing protected
from frost in the winter and sufficiently ventilated in summer. Exposure to
direct sunlight must be avoided.
NOTE!
Pumps have mechanical moving parts that can induce vibrations. To prevent damages at the pump or at peripheral components / facilities as well
as minimizing noise development an appropriate vibration decoupling is
necessary. For this M&C can deliver e.g. anti-vibration pads.
This explicit is also valid for the connection of the sample lines at the pump
head.
9 RECEIPT OF GOODS AND STORAGE
Please take the sample pump and possible special accessories carefully out of the packaging
material immediately after arrival, and compare the goods with the items listed on the delivery note!
Check the goods for any damage caused during delivery and, if necessary, notify your transport
insurance company without delay of any damage discovered
10 INSTALLATION INSTRUCTIONS
When installing the pump make certain that accident prevention regulations and safety instructions
including those for subsequent operation are observed. The safety instructions in section 2.2 must be
observed.
10.1 MECHANICAL INSTALLATION
The mounting dimensions are given in figure 2.
The pump is provided for assembly and therefore it has to be fastened with screws.
Install the pump so that the fan can draw in sufficient cooling air.
Mounting the pump at the highest place in system and/or with pump head downside so that con-
densate can not be assembled inside the head.
Gas sampling and gas conditioning technology 6-1.1.10-ME
10
WAR N ING !
When connecting the equipment, please ensure that the supply
voltage is identical with the information provided on the model
type plate.
The supply voltage is only allowed to deviate max. +6 % respectively -10% from the indication on the model type plate.
NOTE!
Attention must be paid to the requirements of IEC 364 (DIN VDE
0100) when setting high-power electrical units with nominal voltages of up to 1000 V, together with the associated standards and
stipulations.
Check the details on the type plate to ensure that the equipment is
connected up to the correct mains voltage. A main switch and
matching fuse must be provided externally! (EN 60335-1)
A protective motor switch is not necessary because the pump is
equipped with a thermal switch.
For electrical details see technical data.
52
124
55
153
50
165
4xM4
G1/8"i
24
A
view A
Power in
230V 50Hz
MP 06/12
Dimensions in mm
Figure 2 Dimensions (mm) MP06/12
10.2 ELECTRICAL INSTALLATION
The pumps MP06/12 is equipped with a mains cable with a plug as standard.
When making the electrical installation the safety regulations must be observed. In particular make
sure that the power supply is isolated before trying to connect the pump.
In case the standard mains cable with plug should not be used, a wiring plan is in the cover of the
junction box.
The pump must be installed so that contact with live parts (connections, possibly windings) is im-
possible.
Gas sampling and gas conditioning technology 6-1.1.10-ME
11
NOTE!
The pump must only be used in the conditions specified in the technical
data.
The pump should not be close to heat sources and freely ventilated to prevent any accumulation of heat.
For outdoor installation, the pump must be installed in a housing protected
from frost in the winter and sufficiently ventilated in summer. Exposure to
direct sunlight must be avoided.
NOTE!
Do not confuse hose-/tube connections for sample gas inlet and outlet; the
connections are labelled accordingly !
Check for tightness of all sample lines after connection!
NOTE!
The tightness of the connections can only be guaranteed if the end section
of the connection hose/tube is flat (use a hose-cutter) !
10.3 PNEUMATIC INSTALLATION
Remove the protection plugs from the connection threads (thread size G1/8”i).
Accessories like hose connections are screwed into the connection threads by sealing tape (using
M&C connectors sealing tape is not necessary).
Connect the suction and pressure lines.
Arrange the suction and pressure lines so that condensate cannot run into the pump.
11 SUPPLY LINE CONNECTIONS
11.1 HOSE-/TUBE CONNECTIONS
The gas inlet and outlet hoses/tubes are connected on the top of the pump. Standard G 1/8" threaded
joints are available for the connection of the gas sample lines.
When connecting the sample gas supply hoses or tubes to the corresponding threaded connections,
pay attention to the following items:
Loosen the sleeve nut of the clamping-ring threaded joint by turning to the left. Take care that the
nut is removed carefully from the body of the threaded joint to avoid losing the clamping ring which
is mounted loosely into the nut.
Push the sleeve nut over the connection hose/tube.
Push the clamping ring onto the connection hose/tube with the thicker bulge pointing to the nut.
Push the hose/tube onto the supporting nipple in the threaded joint.
Tighten the sleeve nut by hand.
The hose/tube is now mounted in such a way that it can not slip and is resistant to pressure.
The appropriate tube or hose threaded joint connections are available optionally from M&C.
Gas sampling and gas conditioning technology 6-1.1.10-ME
12
NOTE!
The area in which the pump is situated when not in use must be kept
free of frost at all times!
WAR NIN G !
Aggressive medium is possible.
Wear protective glasses and proper protective clothing during dis-
assembly, repair or cleaning!
12 STARTING
Specific safety instructions for media being handled must be observed.
Before pumping a medium, the compatibility of materials of pump head, diaphragm and valves with the
medium must be checked (for pump materials: see technical data).
The following steps should be carried out before initial start-up:
The pump must not start against pressure or vacuum. When it is switched on, the pressure in the
suction and pressure lines must be atmospheric. This must be so even when the pump restarts after the power has been cut off for a short period.
The maximum permissible operating pressure (see technical date) must not be exceeded, even
when the flow is restricted.
To prevent the maximum permissible operating pressure being exceeded, restriction or control of
the air or gas flow should only be carried out in the suction line.
If restriction or control of the air or gas flow is made on the pressure side, ensure that the maximum
permissible operating pressure is not exceeded.
When the pump is at a standstill, the inlet and exhaust must be at normal atmospheric pressure.
Diaphragm and valve plates are the only parts subject to wear. Wear is usually indicated by a dras-
tic reduction in the pneumatic performance. When replacing parts, proceed as described in section
9.
Ambient conditions: see technical data section 3.
13 CLOSING DOWN
If the pump is putting out of action for a short time, no particular measures need to be taken.
If the pump is out of action for a longer time, please purge it with Nitrogen.
Gas sampling and gas conditioning technology 6-1.1.10-ME
13
WAR N ING !
It is necessary to take the pump off the mains before any assembly,
maintenance or repair work is carried out!
WAR N ING !
Aggressive medium is possible.
Wear protective glasses and proper protective clothing during
disassembly, repair or cleaning!
NOTE!
Always change valve plates, diaphragm and sealing rings at the
same time.
14 MAINTENANCE
Before maintenance is carried out, it is necessary that the specific safety procedures pertaining to the
system and operational process are observed!
Diaphragm and valve plates are the only parts of the pump subject to wear. They are simple to
change.
Parts and tools required:
Valve plates, sealing rings (2 each pump head) and diaphragm
Hexagon socket screw key 3
Change the diaphragm, valve plates and sealing rings in the following sequence:
Gas sampling and gas conditioning technology 6-1.1.10-ME
14
Hexagon screws
Valve plates
Sealing rings
Diaphragm
14.1 CHANGING THE DIAPHRAGM, VALVES AND SEALINGS
Figure 3 Pump head with hexagon screws
Loosen the 4 hexagon screws;
Remove the 2 parts of the pump head.
Figure 4 Dismounted pump head
Unscrew the diaphragm by hand out of the tapping hole of the rod (counter-clockwise);
Screw the new diaphragm into the rod hand-tight;
Change the sealing rings and valve plates;
Put on the basic part of the pump head and control that the bulge of the diaphragm fits to the
groove of the pump head;
Put on the upper part of the pump head so that its pin fits into the hole in the basic part of the pump
head;
Fix the 4 hexagon screws constantly over cross;
Gas sampling and gas conditioning technology 6-1.1.10-ME
15
WAR NIN G !
Aggressive medium possible.
Wear protective glasses and proper protective clothing during disas-
sambly, repair or cleaning!
14.2 CLEANING
When changing valve plates and diaphragm, inspect all parts for dirt before assembling the pump
head and clean them if necessary.
As far as possible clean the parts with a dry cloth. Solvents should not be used as they can attack
the plastics and synthetic rubber parts. If possible clean the parts with compressed air.
Gas sampling and gas conditioning technology 6-1.1.10-ME
16
Problem/indication
Possible cause
Action/Check
Pump produces no
flow
No main supply.
Check power supply. Check plug for correct fit.
Connections or lines are
blocked.
Remove blockade.
An external valve is closed
or a filter is blocked.
Open valve or clean blocked/dirty filter.
Liquid (condensate) has
collected in the pump head.
Let the pump for a few minutes pumping air.
Flow, pressure or
vacuum too low
Diaphragm or valves are
worn out.
Change diaphragm or/and valves.
Compare the actual performance with the figures in
the technical data.
The pump is not designed for this condition.
There is pressure on the
pressure side and at the
same time vacuum or a
pressure above atmospheric
on the suction side.
The pump is not designed for this condition.
The cross-section of pneumatic lines or connected
components is too small, or
they are restricted.
To measure the performance, disconnect the
pump from the system (smaller diameter tubing
or a valve can significantly affect performance).
A leak at a connector, in a
line or in the pump head.
Insulate the leak, tighten the screws, clean or
exchange dirty parts.
NOTE!
If the pump does not operate properly and you can not find any of the
above mentioned faults, send it back to M&C.
If the pump is sent for repair, please provide information about sample
(aggressive or corrosive components etc.)
If the sample is dangerous or highly aggressive the pump must be cleaned
before dispatch.
15 TROUBLE SHOOTING
Before working on the pump, isolate the power supply securely, then check that the lines are not live.
The following tips for fault-finding are best employed in the sequence shown.
Gas sampling and gas conditioning technology 6-1.1.10-ME
17
Diaphragm sample pump
Type MP06, MP12
(C) consumable parts, (R) recommended spare parts, (S) spare parts
recommended quantity
being in operation [years]
C/R/S
1 2 3
91P1000
Diaphragm type MTF26, material: FPM, PTFE
R 1 2
3
91P1005
Valve plate type VTF26, material: FKM
R 1 2
3
91P1010
O-ring type OTF26, material: FKM
R 1 2
3
91P1015
Pump head, upper part, material: PTFE
S - -
1
91P1020
Pump head, basic part, material: PTFE
S - -
1
91P1025
Con-rod with bearing
S - -
1
91P1030
Counter weight eccentric
S - -
1
PVDF Male connectors with G-thread (ISO 1010031)
05V1045
Male connector, DN 4/6-G1/8” material: PVDF
S - -
2
05V1050
Male connector, DN 6/8-G1/8” material: PVDF
S - -
2
05V1055
Male connector, DN10/12-G1/8” material:
PVDF
S - -
2
05V6600
Ferrule DN 4/6 PVDF
S 2 2
4
05V6602
Ferrule DN 6/8 PVDF
S 2 2
4
05V6604
Ferrule DN 10/12 PVDF
S 2 2
4
05V6605
Union nut DN 4/6 PVDF
S 2 2
4
05V6607
Union nut DN 6/8 PVDF
S 2 2
4
05V6609
Union nut DN 10/12 PVDF
S 2 2
4
16 SPARE PART LIST
Wear, tear and replacement part requirements depend on specific operating conditions.
The recommended quantities are based on experience and are not binding.
17 APPENDIX
Further product documentation can be seen and downloaded from our home page:
www.mc-techgroup.com
Gas sampling and gas conditioning technology 6-1.1.10-ME
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.