M&C TechGroup FSS-H350 Operator's manual

Operating Manual
Electrical heated Filter
Type FSS-2K/H350, FSS-3SS/H350,
FSS-FW/H350
Gas sampling and gas conditioning technology 5-2.1.5-ME
2
This Operating Manual does not claim completeness and may be subject to technical modifications. © 03/2008 M&C TechGroup Germany GmbH. Reproduction of this document or its content is not allowed without permission from M&C. 1st Edition: 03/2008
Dear customer,
we have made up this operating manual in such a way that all necessary information about the product can be found and understood quickly and easily. Should you still have any question, please do not hesitate to contact M&C directly or go through your appointed dealer. Respective contact addresses are to be found in the annexe to this operating manual. Please also contact our homepage www.mc-techgroup.com for further information about our products. There, you can read or download the data sheets and operating manuals of all M&C products as well as further information in German, English and French.
Gas sampling and gas conditioning technology 5-2.1.5-ME
3
Content
1 General information .................................................................................................................... 4
2 declaration of conformity ................................................................ ........................................... 4
3 Safety instructions ...................................................................................................................... 5
4 Warranty ...................................................................................................................................... 5
5 Used terms and signal indications ............................................................................................ 6
6 Introduction ................................................................................................................................. 7
7 Application .................................................................................................................................. 7
8 Technical Data ............................................................................................................................. 7
9 Description .................................................................................................................................. 8
10 Reception and storage ............................................................................................................... 8
11 Installation instructions ............................................................................................................. 9
12 Supply connections .................................................................................................................... 9
12.1 Hose connections ............................................................................................................... 9
12.2 Electrical connections ........................................................................................................ 9
13 Starting ...................................................................................................................................... 11
14 Shut-down ................................................................................................................................. 12
15 Maintenance .............................................................................................................................. 12
16 Spare parts list .......................................................................................................................... 14
17 Appendix .................................................................................................................................... 14
List of illustrations
Figure 1 Heated filter FSS-../H350 .................................................................................................. 8
Figure 2 Electricel connection of the filter FSS-../H350 ................................................................. 10
Figure 3 Dismounting of the filter housing lid ................................................................................ 13
Gas sampling and gas conditioning technology 5-2.1.5-ME
4
Head Office
M&C TechGroup Germany GmbH Rehhecke 79 40885 Ratingen Germany
Telephone: 02102 / 935 - 0 Fax: 02102 / 935 - 111 E - mail: info@mc-techgroup.com
www.mc-techgroup.com
1 GENERAL INFORMATION
The product described in this operating manual has been examined before delivery and left our works in perfect condition related to safety regulations. In order to keep this condition and to guarantee a safe operation, it is important to heed the notes and prescriptions made in this operating manual. Furthermore, attention must be paid to appropriate transportation, correct storage, as well as professional installation and maintenance work. All necessary information a skilled staff will need for appropriate use of this product are given in this operating manual.
2 DECLARATION OF CONFORMITY
CE - Certification
The product described in this operating manual complies with the following EC directives:
EMV-Instruction
The requirements of the EC directive 2004/108/EG “Electromagnetic compatibility“ are met.
Low Voltage Directive
The requirement of the EC directive 2006/95/EC “Low Voltage Directive“ are met. The compliance with this EC directive has been examined according to DIN EN 61010.
Declaration of conformity
The EU Declaration of conformity can be downloaded from the M&C homepage or directly requested from M&C.
Gas sampling and gas conditioning technology 5-2.1.5-ME
5
3 SAFETY INSTRUCTIONS
Please take care of the following basic safety procedures when mounting, starting up or operating this equipment:
Read this operating manual before starting up and use of the equipment. The information and warnings given in this operating manual must be heeded.
Any work on electrical equipment is only to be carried out by trained specialists as per the regulations currently in force.
Attention must be paid to the requirements of VDE 0100 (IEC 364) when setting high-power electrical units with nominal voltages of up to 1000 V, together with the associated standards and stipulations.
Check the details on the type plate to ensure that the equipment is connected to the correct mains voltage.
Protection against touching dangerously high electrical voltages: Before opening the equipment, it must be switched off and hold no voltages. This also applies to any external control circuits that are connected.
The device is only to be used within the permitted range of temperatures and pressures. Check that the location is weather-protected. It should not be subject to either direct rain or moisture. The device must not be used in hazardous areas. Installation, maintenance, monitoring and any repairs may only be done by authorized personnel with
respect to the relevant stipulations.
4 WARRANTY
If the equipment fails, please contact M&C directly or else go through your M&C authorised dealer. We offer a one year warranty as of the day of delivery as per our normal terms and conditions of sale, and assuming technically correct operation of the unit. Consumables are hereby excluded. The terms of the warranty cover repair at the factory at no cost or the replacement at no cost of the equipment free ex user location. Reshipments must be send in a sufficient and proper protective packaging.
Gas sampling and gas conditioning technology 5-2.1.5-ME
6
DANGER!
This means that death, severe physical injuries and/or important material damages will occur in case the respective safety measures are not fulfilled.
WA RNING !
This means that death, severe physical injuries and/or important material damages may occur in case the respective safety measures are not fulfilled.
CARE!
This means that minor physical injuries may occur in case the respective safety measures are not fulfilled.
CARE!
Without the warning triangle means that a material damage may occur in case the respective safety measures are not met.
AT TENTI ON !
This means that an unintentional situation or an unintentional status may occur in case the respective note is not respected.
NOTE!
These are important information about the product or parts of the operating manual which require user’s attention.
SKILLED STAFF
These are persons with necessary qualification who are familiar with installation, use and maintenance of the product.
5 USED TERMS AND SIGNAL INDICATIONS
Gas sampling and gas conditioning technology 5-2.1.5-ME
7
Heated filter type
FSS-2K/H350
FSS-3SS/H350
FSS-FW/H350
Version 115V AC
Part-No.
01F3035
01F3030
01F3045
01F30..-a
Filter element length 150 mm, material
ceramic
stainless steel SS316
spun glass Filter porosity
2 μm
3 μm
Filter surface
140 cm2
Operating pressure max.
5 bar g
Ambient temperature / storage temperature
-20 °C to +60 °C Dead volume
130 cm3
Gas connections
Swagelok tube connector ø6 mm, optional ø1/4"
Temperature controller
incorporated capillary sensor thermostat, with temperature limiter switch and low temperature alarm contact
Operating temperature
adjustable from +50 °C to 350 °C, set in factory 250 °C
Temperature alarm contact
alarm point at -30 °C below TSet change over contact, voltage free, contact rating 250V, 3A ~ 0, 25A =
Power supply
230V 50Hz, 800VA
115V 60Hz
Electrical connections
Terminals 4 mm2, 2x cable glands PG13
Method of mounting
Wall mounting
Protection classification/electrical standard
IP 54 EN60529 / EN61010, EN60519-1 Dimensions / Weight
250 x 300 x 300 mm (w x h x d) / 11 kg
Material of sample contacting parts
filter chamber: stainless steel 316Ti / sealing: graphite
6 INTRODUCTION
Hot sample gas very often contains solids like dust, taar or grime and water vapour. These materials cause problems for a continuous gas analysis, especially when the gas temperature falls below the dew point. The sample line will be blocked and the analyser will be damaged. Therefore the solids have to be separated and a temperature drop below the dew point has to be prevented. For this complex of problems the electrically heated M&C universal filter type FSS-../H350 was designed.
7 APPLICATION
The electrically heated M&C universal filter type FSS../H350 separates fine dust particles of 2 or 3 µm or solids like taar or grime from the sample gas at operating temperatures up to 350 °C. For an efficient filtration very fine filter elements with high deep action are used. For separation of e.g. taar and grime a special filter cartridge filled up with spun glass is used.
8 TECHNICAL DATA
Gas sampling and gas conditioning technology 5-2.1.5-ME
8
CARE!
The device must be stored in a weather protected frost-free area!
Filter element
Junction box with thermostat
Connecting fittings
Heat conducting jaws
Lagged cap
Brackets
Alarm­contact
Power
Sample IN
Sample OUT
9 DESCRIPTION
The M&C filter FSS../H350 is mounted thermally isolated on a plate. The stainless steel filter body with integrated filter element, alternatively of ceramic, stainless steel or special spun glass, is completely covered by a heated metal enclosure. The high capacity heating element is controlled by an incorporated compact capillary sensor thermostat in a temperature range of +50 °C to 350 °C. The thermostat is equipped with an temperature limiter switch with reset key, releasing at 30 °C above set-temperature, and a voltage-free low temperature alarm contact at 30 °C below set-temperature. In order to avoid cold spots, the welded connecting fittings are heated up with the filter by means of two heat conducting jaws. Outside the lagged cap a junction box is mounted which contains the thermostat as well as the terminals for electrical connection. Two brackets fix the heated lines. The complete conception guarantees a safe operation and a simple maintenance. No tools are needed for replacing the filter element, during the heated sample lines remain in their position.
Figure 1 Electrical heated universal filter FSS-../H350
10 RECEPTION AND STORAGE
The device is a complete pre-installed unit.
Carefully inspect the device and any special accessories included with it immediately on arrival
by removing them from the packing and checking for missing articles against the packing list!
Check the items for any damage in transit and, if required, inform the shipping insurance
company immediately of the damage found!
Gas sampling and gas conditioning technology 5-2.1.5-ME
9
SKILLED STAFF
The installation has to be carried out by skilled staff !
NOTE!
Locate the universal filter series FSS-…/H350 in such a way that there is adequate space for removing the cover and replacing the filter elements. Make certain that the universal filter series FSS-…/H350 is easily accessible so that you can carry out any subsequent maintenance work without trouble.
AT TENTI ON !
Do not interchange sample inlet and outlet. The connections are marked on the weather protection shield. After connecting the sample lines, make sure that the connections are leak proof.
AT TENTI ON !
If a PTFE tube is used as sample line, an insert has to be used in the end of the tube in order to prevent the tube being pressed together.
SKILLED STAFF
The electrical connections have to be carried out by skilled staff !
11 INSTALLATION INSTRUCTIONS
The filter FSS-../H350 is suitable for wall mounting. The aluminium mounting plate is fixed with 4 screws (s. Fig. 1).
12 SUPPLY CONNECTIONS
12.1 HOSE CONNECTIONS
The connection for sample gas inlet and outlet happens on the top and bottom of the filter. For this purpose tube connectors ø 6 mm (ø 1/4" as option) are mounted (s. Fig. 1).
Remove the cover of the heated filter after opening the two clamping devices. Disconnect the thermal conductivity jaws by loosening the knurled nuts. Remove the upper part of the sample line’s mounting bracket and insert the sample line into
the threaded pipe joint and connect it. The temperature-resistant, stainless steel connectors supplied by M&C have a double ferrule system to ensure reliable sealing. After tightening the nuts of these connectors by hand, they should then be tightened exactly 1¼ of a turn using a flat spanner and are then properly mounted.
Screw on the upper part of the mounting bracket and fix the heated sample line. Now place
the heat conducting jaws around the sample gas connection in the retaining slot and fix with the knurled nuts.
12.2 ELECTRICAL CONNECTIONS
Gas sampling and gas conditioning technology 5-2.1.5-ME
10
WA RNING !
When connecting the equipment, please ensure that the supply voltage is identical with the information provided on the model type plate!
NOTE!
Attention must be paid to the requirements of IEC 364 (DIN VDE
0100) when setting high-power electrical units with nominal voltages of up to 1000 V, together with the associated standards and stipulations.
In any case we recommend the use of temperature resistant cable ! A main switch and matching fuse must be provided externally! The main circuit must be equipped with a fuse corresponding to
the nominal current (over current protection); for electrical details see technical data.
It is recommended to use the low temperature alarm. In case of an alarm the flow can be stopped and the components downstream the filter are safe from demage.
Thermostat
Alarm contact
Power 230V/50Hz (115V/60Hz)
Figure 2 Electrical connection of the filter FSS-../H350
Remove the lid of the junction box. The electrical connection layout is located in the lid also. Insert the mains cable (min. 3 x 1.5 mm²) through the lower cable gland and connect to the
appropriate terminals.
Insert the signal cable through the upper cable gland and connect to the appropriate terminals. Screw lid back on.
Gas sampling and gas conditioning technology 5-2.1.5-ME
11
SKILLED STAFF
The starting has to be carried out by skilled staff !
WA RNING !
Before starting up check whether the mains power supply voltage corresponds with the information stated on the nameplate.
Beware of touching the filter surface during operation. Serious burns can occur because of high surface temperatures. Wear protective gloves and protect the filter from unauthorized access.
NOTE!
If the rated value temperature needs to be lowered more than 30°C in one step duration operation, the thermostat's excess temperature switch-off is triggered (for re-start press reset key).
NOTE!
The total heating-up time is approximately 2 hours. In case of low temperature alarm (failure of heating) the gas flow
has to be interrupted by adequate measures!
13 STARTING
Before starting the gas conditioning system please pay attention to the site-oriented and process­oriented precautions. For the carried media the corresponding safety regulations and measures have to be considered.
Check the rated value setting on the built-in thermostat (s. Fig. 2).
Switch on mains power supply.
Gas sampling and gas conditioning technology 5-2.1.5-ME
12
SKILLED STAFF
The shut-down has to be carried out by skilled staff !
NOTE!
Before shut-down, i.e. switching off the heating, the probe be flushed with inert gas or air in order to avoid condensation of aggressive components from the process gas.
SKILLED STAFF
Maintenance has to be carried out by skilled staff !
WA RNING !
Aggressive condensate is possible. Wear protective glasses and proper protective clothing!
Flush the filter in case of toxic gases!
For maintenance work during operation: High surface temperatures! Touching the filter surface can cause serious burns! Wear protective gloves and protect the filter of unauthorized
access!
14 SHUT-DOWN
15 MAINTENANCE
The safety instructions specific to the plant and process are to be consulted prior to any maintenance work!
It is difficult to give any recommendations as to a particular maintenance cycle. Depending on your process conditions, a meaningful maintenance cycle must be elaborated for the specific application. An indication that filter-maintenance may be necessary could be shown by a constant decline in the amount of sample gas in the analysis system. Probe maintenance is restricted essentially to replacing filter elements and checking seals.
Gas sampling and gas conditioning technology 5-2.1.5-ME
13
A
C, Pos. F
D
C, Pos. E
B
H
The following steps are recommended removing the filter housing lid (s. Fig. 2):
 Turn toggle screw „A“ approx. 1 turn counter-clockwise, that the filter housing lid will lift up;  Turn handle „C“ in position „E“;Turn clamp „B“ counter-clockwise;  Take toggle screw „A“ and pull out the filter housing lid;  Change filter element and possibly the lids;  Push in the filter housing lid into the filter area;  Turn clamp „B“ clockwise and turn with the handle „C“ the ringscrew „D“ in position „E“, that
the clamp „B“ will latch into the ringscrew „D“ and the threaded bolt „H“. It could be neccessary
to move the ringscrew “D” on the thread rod of the toggle screw “A” into the correct position;
Turn handle „C“ in position „F“ and fasten the filter housing lid by turning the toggle screw „A“
clockwise by hand.
Figure 3 Dismounting of the filter housing lid
Gas sampling and gas conditioning technology 5-2.1.5-ME
14
Electrically heated universal filter FSS-../H350
(C) consumable parts, (R) recommended spare parts, (S) spare parts
recommended
quantity
in operation [years]
C/R/S
1 2 3
90 F 0020
Filter element S-2K150, ceramic, 2µm, 150mm
C
a.t.r.
a.t.r.
a.t.r.
90 F 0126
Filter element F-3SS150, SS316, 3µm, 150mm
C
a.t.r.
a.t.r.
a.t.r.
93 S 2083
Spec. spun glass, high temperature resistant, 1000g
C
a.t.r.
a.t.r.
a.t.r.
93 S 0030
Filter housing lid gasket, graphite
R 2 4
8
93 S 0011
Thermostat (0-320°C)
R 1 1
1
90 S 0015
Heating cartridge, 160mm, 230VAC/800W
R 1 1
1
90 S 0017
Heating cartridge, 160mm, 115VAC/800W
R 1 1
1
93 S 0055
Flat gasket (30) for filter element, graphite
R
a.t.r.
a.t.r.
a.t.r.
16 SPARE PARTS LIST
Wear, tear and replacement part requirements depend on specific operating conditions. The recommended quantities are based on experience and they are not binding.
a.t.r. = according to requirements
17 APPENDIX
Further product documentation can be seen and downloaded from our home page:
www.mc-techgroup.com
Gas sampling and gas conditioning technology 5-2.1.5-ME
Loading...