Step 1
Level the tub by placing the tub carefully on its side (Warning! When placing unit on its side make sure make sure you do not put pressure on the acrylic
tub or any components contained underneath the tub).
Start by screwing all level locking feet clockwise to the inward position.
Then, Locate the furthest Level Locking Foot adjustment from the drain. Adjust those feet out one inch as shown in figure 2. As you move closer to the
drain, adjust the feet to three quarter inches, then, half inch, and finally one quarter of an inch, or all the way in, depending on tub. There is no science
behind this method and it takes in consideration that your floor is perfectly level. You may have to adjust according to your situation. The main goal is
to create a slopping plane for the water to roll off properly toward the drain.
With tub still on its side, Ensure the drain system is hand tight then apply a quarter turn of the wrench.
Should you need to change the drainage system or purchase any adapters; the waste drain is one inch and a half male fitting. Although it is not
required, changing the waste hose to a larger size is recommended for faster drainage.
Ensure all plumbing connections are tight. Use a wrench, if needed, to apply additional tightening. However, note that too much torque applied may
cause connections to crack and/or split. This is not covered by the warranty.
Place the tub carefully on its feet. DO NOT lift, drag or pull on the acrylic while setting the tub on its side or lowering it to its feet. Although the acrylic is
made of very sturdy strong material, you could still crack the acrylic. This is not covered by the warranty.
Then, use a Carpenter’s Level to make any minor adjustments to the tub.
Optional Step: Once Level, if you are able to fill with about an inch of water, fill and check the direction of the water drainage to ensure it is flowing
smoothly toward the drain.
Once the tub is level, you can proceed to Step 2, Pre-Fab. See Figure 1 in your manual.
18