Market Forge ST-24M36D Installation Manual

ST-24M SERIES
24 PAN PRESSURELESS STEAM COOKERS
INSTALLATION - OPERATION - MAINTENANCE
MODELS
44 Lakeside Avenue, Burlington, Vermont 05401 USA
Telephone: (802) 658-6600 Fax: (802)864-0183
www.mi.com PN 14-0273 Rev D (4/16)
© 2016 - Market Forge Industries Inc.
Your Service Agency’s Address:
Model
Serial number
Steamer installed by
Installation checked by
IMPORTANT
TABLE OF CONTENTS
WARNING: Improper installa­tion, adjustment, alternation, service or maintenance can cause property damage, in­jury or death. Read the instal­lation, operation and mainte­nance instructions thoroughly before installing or servicing this equipment.
INSTRUCTIONS TO BE FOL­LOWED IN THE EVENT THE USER SMELLS GAS MUST BE POSTED IN A PROMINENT LO­CATION. This information may be obtained by contacting your local gas supplier.
FOR YOUR SAFETY
Do not store or use gasoline or other ammable vapors or liq­uids in the vicinity of this or any other appliance.
INSTALLATION
Introduction .............................................................. 2
Service Connections ..................................................... 3
Assembly and Connections ............................................... 6
Installation Check-Out .................................................... 7
PRV – Pressure Reducing Valve Maintenance and Adjustments .............. 8
OPERATION
Controls ................................................................. 9
Operating Procedures ................................................... 10
Test Kitchen Bulletin ..................................................... 11
Cooking Guide .......................................................... 12
MAINTENANCE
Cleaning ............................................................... 14
The information contained in this manual is important for the prop­er installation, use, and mainte­nance of this steamer. Adher­ence to these procedures and instructions will result in satis­factory baking results and long, trouble free service. Please read this manual carefully and retain it for future reference.
ERRORS: Descriptive, typo­graphic or pictorial errors are subject to correction. Speci­cations are subject to change without notice.
Introduction
DESCRIPTION
The ST-24 is a pressureless steam cooker consisting of two independently controlled compartments enclosed in
a single cabinet. Each compartment is equipped with a
separate three-piece door with inner gasket plate isolated from the exterior surface. Door latches operate by action for positive sealing of inner door. Steam and steam-con­densing circuits are electrically controlled. Operating con­trols are displayed on a single front-mounted panel and include separate timers with indicator lights for selection of constant steam or 60-minute-long duration cooking.
A separate steam source is required for operation of the
Pressureless Cooker and is normally purchased with it; please refer to the respective manual for guidance.
BASIC FUNCTIONING
The Model ST-24 may be operated with only one compart­ment in use; or both may be used simultaneously. Each
compartment is equipped with identical controls, allowing
selection of constant steam or 60-minute timer operation. The cooker becomes operational when it is set to con­stant steam, or the timer is set at the desired cooking time and the compartment door is closed. The indicator light comes on and the steam solenoid valve opens, allowing
steam to ow into the compartment.
When steam owing inside the compartment has raised
the interior temperature to 195°F, the contacts of a ther­mostatic switch automatically close, completing the circuit to the timer motor and starting the selected cooking time period. At the end of the set interval, timer contacts switch to shut off the cooking operation and sound a signal buzz­er. The buzzer is silenced by returning the timer dial to the OFF position. In the constant steam mode, operation will be continuous.
Steam emitted from the compartment along with liquid
cooking drainage is directed through a drain screen in­side the compartment into the cooker drain line. A cold water solenoid valve connected into the cooker drain line is automatically actuated by a thermostatic switch in the cooking compartment drain to condense the steam to wa­ter prior to discharge into the drain.
SHIPPING DAMAGE CLAIM PROCEDURE
The equipment is crafted and inspected carefully by
skilled personnel before leaving the factory. The trans­portation company assumes full responsibility for safe
delivery upon acceptance of this equipment. If shipment
arrives damaged:
Visible loss or damage:
Note the damage or loss on freight bill or express delivery and signed by the person making the delivery.
File claim for damages immediately:
Regardless of the extent of damages.
CONCEALED LOSS OR DAMAGE
If damage is noticed after unpacking, notify the transpor-
tation company immediately and le a “Concealed Dam­age” claim with them. This should be done within fteen
(15) days from the date delivered. Retain container for inspection.
SERVICE
Installation of the equipment should be performed by qualied, certied, licensed and/or authorized personnel
who are familiar with and experienced in state/local instal­lation codes.
Operation of the equipment should be performed by quali­ed and authorized personnel who have read this manual and are familiar with the functions of the equipment.
Service of the equipment should be performed by quali­ed personnel who are knowledgeable with Market Forge cooking equipment.
Should repairs be required, a network of authorized agen-
cies is available to assist with prompt service. A current Directory of Authorized Service Agencies may be ob­tained by contacting:
Market Forge Industries Inc.
44 Lakeside Avenue
Burlington, VT 05401
802-658-6600
www.mi.com
Website http://www.mi.com for a listing of Authorized
Service Agents.
The model and serial numbers must be referenced when corresponding with Market Forge. The data plate contain­ing the serial number pertaining to the equipment is lo­cated on the lower front trim of the cabinet.
INSTALLATION
2
ST-24M36E
Service Connections
ELECTRICAL REQUIREMENTS
42kW
3pH
208 (197-219) 117 --
240 (220-240) -- 116
480 (360-500) -- 58
Details of other electrical systems available upon request.
48kW
3pH
SERVICE CONNECTIONS
EP Power Supply - Use wire suitable for at least 90°C. Nominal
amp per line wire:
CW1 Cold Water - 3/8” (10mm) NPT for cold water to boiler. Cold
water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure
CW2 Cold Water - 3/8” (10mm) NPT for cold water to condenser.
Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure.
D Drain - Pipe full 2” (50mm) NPT to flush floor drain capable
of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. DO NOT MAKE SOLID CONNECTION TO FLOOR DRAIN.
OPERATION WILL BE BY:
Electrically powered, A.S.M.E. constructed and National Board Registered, 15 PSI (1 kg/cm2) steam boiler rated at
NOTE: The only available space to supply utilities to the boiler is the 6” (152mm) space between the floor and the cabinet base. PVC & CPVC Pipe are not acceptable materials for drains.
CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering.
42/48 kW
DIMENSIONS ARE IN INCHES [MM]
4 [102]
2.5 [64]
10.5
12.5
[318]
69.25
[1759]
[267]
10.5
[267]
3 [76]
5 [127]
ST
D
CW1
CW2
36 [914]
ST
6 [152]
EP
33
[838]
6 [152]
ST-24
WATER SUPPLY
Good quality water feed is the responsibility of the owner. Water quality must be within the following general guidelines.
TDS: 40-125 ppm Hardness: 35-100 ppm Chlorine: <0.2 ppm Silica: <13 ppm Chlorides: <25 ppm Chloramine: <0.2 ppm pH: 7.0 - 8.5
The best defense against poor water quality is a water treatment system designed to meet your water quality conditions.
Figure 1
3
22
[559]
CW1
CW2
28
[711]
D
EP
6 [152]
INSTALLATION
Loading...
+ 11 hidden pages