Market Forge M24E24A Installation Manual

0
OWNER’S MANUAL
WARNING:
IMPROPER INSTALLATION, ADJUSTMENT,
ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE
PROPERTY DAMAGE, INJURY OR DEATH. READ THESE
INSTALLATION, OPERATION AND MAINTENANCE
INSTRUCTIONS THOROUGHLY BEFORE INSTALLING
OR SERVICING THIS EQUIPMENT.
Form Number: S-3112 REV. E 04/14 Printed in USA 35 Garvey Street, Everett, MA 02149
Telephone (617) 387-4100, (866) 698-3188, Fax (617) 387-4456, (800) 227-2659
custserv@mfii.com, www.mfii.com
FOR YOUR SAFETY:
DO NOT STORE OR USE GASOLINE OR OTHER
FLAMMABLE VAPORS OR LIQUIDS IN THE
VICINITY OF THIS OR ANY OTHER APPLIANCE.
MODELS: M24E24A M36E24A
M24E36A □ M36E36A M24E42/48A M36E42/48A
1
Table of Contents
INTRODUCTION ............................................................................................................................... 2
To the Kitchen Manager: ............................................................................................................. 2
INSTALLATION INSTRUCTIONS ........................................................................................................ 3
GAS OPERATED BOILERS ............................................................................................................. 3
RECEIVING INSTRUCTIONS: ......................................................................................................... 3
INSTALLING LEGS: ........................................................................................................................ 3
LEVELING: .................................................................................................................................... 3
SERVICE CONNECTIONS: ............................................................................................................. 4
OPERATING INSTRUCTIONS ............................................................................................................ 5
CONTROL PANEL: ........................................................................................................................ 5
OPERATING THE STEAM GENERATOR: ........................................................................................ 5
ADJUSTMENTS ................................................................................................................................ 6
SETTING THE BOILER CONTROL PRESSURE SWITCHES: .............................................................. 6
PRESSURE CONTROL SWITCH ADJUSTMENT: ............................................................................. 6
GENERAL TROUBLE SHOOTING ....................................................................................................... 7
TESTING PROCEDURE ...................................................................................................................... 9
WATER CONTROL BOARD TESTING PROCEDURE ........................................................................ 9
ILLUSTRATED PARTS LIST .............................................................................................................. 11
BOILER BASE - 24” ..................................................................................................................... 11
PRESSURE SWITCH BOX, WITHOUT COVER .............................................................................. 12
CONTROL BOX ASEMBLY, WITH & WITHOUT COVER ............................................................... 13
ELECTRIC BOILER, LEFT SIDE VIEW – 36”................................................................................... 14
ELECTRIC BOILER, FRONT VIEW – 36” ....................................................................................... 15
ELECTRIC BOILER, CONTACTOR BOX ......................................................................................... 16
ELECTRIC BOILER, ELEMENTS .................................................................................................... 17
ELECTRICAL INFORMATION .......................................................................................................... 18
Wiring Diagram for New Generation Electric Boilers ............................................................... 18
Schematic Diagram for New Generation Electric Boilers ......................................................... 19
Wiring – 18 kW, 24 kW, 32 kW ................................................................................................. 20
Wiring – 18 kW, 24 kW, 32 kW ................................................................................................. 21
Wiring – 36 kW, 42 kW, 48 kW ................................................................................................. 22
Wiring – 36 kW, 48 kW .............................................................................................................. 23
MAINTENANCE .............................................................................................................................. 24
Cleaning the Boiler: ................................................................................................................... 24
CLEANING INSTRUCTIONS: ........................................................................................................ 24
APPLICATION INSTRUCTIONS ........................................................................................................ 26
Application Instructions for Total Concept Descaler Cleaning of the Boiler ............................ 26
2
INTRODUCTION
To the Kitchen Manager:
1. Read this manual carefully and in its entirety. Contact Market Forge Ind., Inc. for
clarification if necessary.
2. Protect your kitchen personnel from scalding and other serious injury by providing
training programs to acquaint all equipment operators with the correct and safe methods of operation.
3. Operators must be made aware of the consequences of misuse. Steam producing
equipment, no matter who the manufacturer, is inherently dangerous when misused. The possibility of serious scalding always exists, the careless and/or untrained operator will be injured.
4. This equipment must be maintained according to the guidelines in this manual (see
"maintenance"). Lack of maintenance will lead to a potentially hazardous condition and possible liability. Operators should report any equipment malfunction immediately and steps must be taken to correct the problem before further use of the equipment is allowed.
5. Keep this manual for daily reference.
Market Forge, in the interest of both cost and efficiency has designed these steam boilers with the latest automatic controls in order to make it easier for the operator to use and maintain this equipment. Standard components are utilized on all models unless variances in size or capacity dictate a divergence from this policy for more efficiency of operation. This parts and service manual is written and illustrated to cover all steam boiler equipment that uses gas as a source of fuel other than those which have been custom designed under special order.
HOW TO USE THIS MANUAL:
The pictures of components are aids to the identification, disassembly and assembly of parts. The parts listing provides information necessary for the ordering of replacement parts (proper part names and part numbers). When requesting parts or service always furnish the model and serial number of your complete unit, this will indicate to Market Forge Service Personnel the type of boiler that you have. This information can be found on the nameplate attached to the boiler frame.
THEORY OF OPERATION FOR ELECTRIC BOILER:
An explanation of how the control system operates on automatic electric boilers follows: With the boiler filled with water to the proper level and the fuel switch is turned ON, the contactors will pull in and permit the completion of the electric circuit to the heating element. When the boiler builds to its set pressure, the pressure switch opens. This will open the circuit to the coil in the contactor, which in turn will drop put the contacts in the contactor and shut off the electricity. As the pressure in the boiler drops the pressure control switch will again complete the circuit and build the boiler back to its set pressure. To stop all steam generation place the fuel switch to the OFF position.
3
INSTALLATION INSTRUCTIONS
WARNING:
READ THIS BEFORE OPENING THE
SHIPPING CONTAINER!
ELECTRIC OPERATED BOILERS
MODELS: • M24E24A • M36E24A
• M24E36A • M36E36A
• M24E42/48A • M36E42/48A
CAUTION: BE SURE TO READ: DO NOT AT ANY TIME LAY THE EQUIPMENT DOWN ON ITS BACK, SIDE, TOP OR FRONT. Doing
so may damage the equipment and invalidate the warranty.
RECEIVING INSTRUCTIONS:
Inspect the equipment before signing the bill of lading. The equipment supplied was tested and inspected before shipment. The carrier accepted it as complete and without damage.
This merchandise became your property when it was accepted by the carrier at the factory. Market Forge cannot assume responsibility for loss or damage during transit.
For this reason, you should immediately inspect for visible and concealed damage or shortages before signing for shipment as follows:
1. Count the number of cartons and packages received to be sure they coincide with the
bill of lading.
2. Visually check all cartons for external damage.
3. Remove all cartons from their skids to examine equipment for concealed damage. The
carton is nailed and strapped to the skid. It will be necessary to cut the straps and pry off the container.
4. After inspection, replace the cartons over the equipment on the skids to protect and
secure the equipment until it is ready for installation.
5. Sign for shipment if all is in order. Note shortages, external and concealed damage, if
any, on the bill of lading before accepting a partial or damaged shipment.
6. If necessary, contact the carrier immediately to file a claim. All claims must be filed by
the receiver.
7. Do not remove the cartons or the skids from the cooking equipment until the unit has
been transported through the building to the actual set-up location. The cartons should remain on the equipment as protection against dents and scratches.
INSTALLING LEGS:
Some models are shipped without legs. A separate carton will contain the legs. If your model is received this way, be sure to follow the installation instruction sheet packed with the legs.
LEVELING:
In order for the boiler to drain correctly, it is important to use a level on cabinet top both left and right and front-to-back. If not level, adjust feet. On compartment cookers, check the interior shelves for level condition.
4
SERVICE CONNECTIONS:
Electric Operated
EP
Power Supply – Use wire suitable for at least 90oC nominal amp per line wire:
24kW
36kW
42kW
48kW
Volts
3 pH
3 pH
3 pH
3 pH
208 (197-219)
66
100
117
--
240 (220-240)
60
91
--
116
480 (360-500)
32
47
--
58
Details of other electrical systems available upon request
CW1
Cold Water - 3/8” (10mm) O.D. tubing for cold water to boiler. Cold water lines will have a max of 50PSI (3.5 kg/cm2) and a min of 25PSI (1.8
kgcm2) water pressure. CAUTION: FILTER SYSTEM INSTALLATION INSTRUCTIONS MUST BE ADHERED TO WHEN CONNECTING A FILTER TO THIS LINE.
CW2
Cold Water - 3/8” (10mm) O.D. tubing for cold water to condenser. Cold water lines will have a max of 50PSI (3.5 kg/cm2) and a min of 25PSI (1.8
kg/cm2) water pressure.
D
Drain - Pipe full 2” (51mm) IPS to flush floor drain capable of receiving water flowing at a max rate of 5 gallons (19 liters) per minute. DO NOT MAKE SOLID CONNECTION TO FLOOR DRAIN.
ST
Steam Take-off - Connection for operation of adjacent steam powered equipment.
NOTE: If equipment is installed where elevation exceeds 2,000 feet (609.6 meters) above sea level, specify installation altitude so that proper gas orifices can be provided.
CAUTION: Before connecting water to this unit, water supply should be analyzed to make sure hardness is no greater than 2.0 grains and pH level is within the range of 7.0-8.5. Water which fails to meet these standards should be treated by installation of water conditioner. EQUIPMENT FAILURE CAUSED BY INADEQUATE WATER QUALITY IS NOT COVERED UNDER WARRANTY.
NOTE: PVC & CPVC PIPE ARE NOT ACCEPTABLE
MATERIALS FOR DRAINS.
WARNING:
DO NOT UNDER ANY CIRCUMSTANCE CONNECT
THE EXHAUST DRAIN LINE DIRECTLY TO A SEWER
LINE.
WASTE LINE INSTALLATION: The drain port of the unit is marked with a colored tag and is located at the lower rear left side of the boiler as viewed from the front. This exhaust line may be left open if the boiler has to be situated in a tiled floor depression or a tiled curb section that is equipped with drain facilities. If
this is not the case, then a 2” (51mm) NPT. drain line
must be connected to divert the exhaust to the floor drain. If it is necessary to use more than three elbows, increase the size of the waste line accordingly.
NOTE: The only available space to supply utilities to
the gas boiler is the 6” (152mm) space between the floor and the cabinet. Allow 3” (76mm) space from
side wall and 6” (152mm) from real wall if adjoining walls are combustible.
INSTALLATION INSTRUCTIONS
5
OPERATING INSTRUCTIONS
OPERATING INSTRUCTIONS FOR STEAM GENERATORS
FIRST CHECK TO BE SURE THAT:
A. WATER SWITCH IS IN THE OFF POSITION. B. WATER SUPPLY VALVE IS OPEN. C. ELECTRICITY IS CONNECTED TO ALL UNITS. D. THEN PROCEED WITH DAILY OPERATING PROCEDURES.
DAILY OPERATING PROCEDURE:
STEP 1: PRESS WATER SWITCH FROM OFF TO ON. STEP 2: WAIT 5-10 MINUTES FOR WATER TO FILL IN STEAM GENERATOR (GAUGE GLASS
SHOULD BE 2/3 FULL.)
STEP 3: PRESS HEAT SWITCH FROM ON TO OFF AND RELEASE BACK TO ON WHEN THE
LOW WATER LIGHT GOES OFF. GREEN INDICATOR LIGHT WILL COME ON. (THIS IS NECESSARY TO MANUALLY RESET THE UNIT.)
DAILY SHUT DOWN AND CLEANING:
STEP 1: STEP 1 PRESS WATER SWITCH OFF. THIS WILL DRAIN THE STEAM GENERATOR. STEP 2: STEP 2 AFTER STEAM GENERATOR HAS COMPLETELY DRAINED REPEAT STEP 3: STEPS 1 & 2 OF DAILY OPERATING PROCEDURE.(WATER TO REMAIN IN STEAM
GENERATOR UNTIL NEXT DAILY USE.)
CONTROL PANEL:
MODELS: • M24E24A
• M24E36A
• M24E42/48A
• M36E24A
• M36E36A
• M36E42/48A
OPERATING THE STEAM GENERATOR:
OPERATING INSTRUCTIONS
OPERATING INSTRUCTIONS
6
ADJUSTMENTS
WARNING:
Because power must be on to adjust pressure switches, be sure to protect against electrical shock.
SETTING THE BOILER CONTROL PRESSURE SWITCHES:
PRESSURE CONTROL SWITCH ADJUSTMENT:
If boiler fails to maintain steam pressure in operating range, pressure control switch may require adjustment.
1. Start boiler and allow pressure to build up to operating level - 15 PSI (1kg/cm²).
2. Check boiler pressure gauge. If gauge indicates 12 to 14 PSI, pressure control switches are
properly adjusted.
3. If boiler does not come on when pressure gauge reads 7 PSI and does not go off when pressure
gauge reads 14 PSI, proceed as follows:
a) Remove screw and lift front cover off control box. b) Hand adjust operating pressure control switch and high limit pressure control switch by turning
adjusting nut (Knurled knob) clockwise to raise and counter clockwise to lower actuation point. Switch should be set so that boiler comes on when boiler pressure gauge reads 12 PSI and goes off when gauge reads 14 PSI. Switch should be set so that boiler will shut off if pressure reaches 15 PSI.
c) The actuation value (differential) is factory set and cannot be changed. d) The cold water condenser thermostat is preset at factory. e) Repeat steps, 1, 2, and 3. If 12 to 14 PSI boiler pressure gauge reading is obtained during boiler
operation, adjustment is correct. If proper adjustment cannot be made consult Trouble­Shooting Guide in this manual.
f) After making adjustments, replace cover on pressure switch box and screw.
7
GENERAL TROUBLE SHOOTING
TROUBLE
POSSIBLE CAUSE
REMEDY
Water does not enter the boiler.
a. Water main shut-off. b. Power not reaching unit. c. Probes dirty. d. Water level control board
defective.
e. Solenoid valve defective.
a. Turn on. b. Check main fuse or circuit. c. Remove and clean. d. See (page 9) for test procedure. e. If 120V is verified at solenoid
coil, but fails to open, replace solenoid.
Boiler fails to build up pressure when water level is proper and fuel switch is turned on.
a. Check to see that circuit
breaker in main is turned on.
b. Check to see that contactors
are pulling in.
c. Current flow is broken at
water level control (ascertain with continuity check).
d. Current flow is broken at
pressure control or high limit control switches due to maladjustment or defect (ascertain with continuity check).
e. Heating elements are
defective.
a. Check for voltage at terminal
block.
b. Check continuity of coil, if open
replace.
c. Check for voltage at L1 and L2,
replace if defective.
d. Readjust - to proper setting -
refer
b. to instructions for
readjustment, replace if defective.
c. 5. Replace if continuity check
through the circuit of each element shows defective.
Boiler fails to reach full operating pressure of 5 lbs. or 15 lbs.
a. Pressure gauge reads
inaccurately.
b. Pressure control and high limit
control switches are out of adjustment.
c. Safety valve not seating
properly.
d. Contactor coils (one or both)
not energizing and closing circuit to the heating elements.
a. Replace. b. Follow instructions for
readjusting or replace if defective.
c. Clean or replace. d. Check - replace either
contactor coils or complete contactor – if found defective. Measure amperage at terminal block check to be sure there is an even draw on all three phases - see wiring diagrams for correct AMP draw. If uneven or zero amperage draw is found on one of the three phases, check for blown fuse. If fuse is OK, shut off power, remove wires from heating elements and run continuity check - replace if defective.
GENERAL TROUBLE SHOOTING
8
TROUBLE
POSSIBLE CAUSE
REMEDY
Water enters boiler very slowly.
a. Dirty Strainer screen in
solenoid valve.
a. Clean or replace strainer screen,
part no. 08-4871.
Water level in gauge glass fluctuates up and down.
a. Top shut off on water gauge is
closed.
a. Open.
Contactor chatters.
a. Incorrect supply voltage. b. Dirty or worn contactor points. c. Weak coil.
a. Check to see that it matches it
with coil contactors.
b. Clean or replace contactor. c. Replace with correct voltage
coil.
15 lbs. safety valve blows off prematurely.
a. Pressure set too high. b. Pressure gauge reads
incorrectly.
c. Mineral build-up or dirt on
seat of valve.
d. Weak spring valve.
a. Readjust. b. Replace. c. Clean. d. Replace valve.
Boiler build up to pressure, shuts down and fails to come on.
a. High limit switch set too low
or operating pressure control switch set too high.
a. Follow instructions for
readjusting, (see page 6), or replace if defective.
Air vent leaking.
a. Not closing.
a. Replace.
Cold water condenser does not function.
a. Main water line shut off. b. Thermostat defective. c. Tighten coil nut. d. Check solenoid coil for
continuity, if open replace.
a. Turn on. b. Replace if defective. c. Tighten coil nut. d. Check coil for continuity, if
open replace.
Product in cooker does not cook properly on first cycle, but cooks alright after first cycle is exhausted.
a. Air vent is closing.
a. Replace.
Contactor chatters.
a. Low voltage. b. Defective or incorrect coil.
a. Check voltage condition. Check
momentary voltage dip during starting. Low voltage prevents magnet sealing. Check coil voltage rating.
b. Replace coil, rating of coil must
match the line voltage.
Welding or freezing.
a. Abnormal spike in current. b. Low voltage preventing
magnet from sealing.
c. Short circuit.
a. Check for grounds or shorts in
system.
b. Correct voltage condition. c. Remove short fault and check
to be sure fuse or breaker size is correct
Loading...