WARNING: Improper installation, adjustment, alternation,
service or maintenance can
cause property damage, injury or death. Read the installation, operation and maintenance instructions thoroughly
before installing or servicing
this equipment.
FOR YOUR SAFETY
Do not store or use gasoline or
other ammable vapors or liquids in the vicinity of this or any
other appliance.
The information contained in this
manual is important for the proper installation, use, and maintenance of this oven. Adherence
to these procedures and instructions will result in satisfactory
baking results and long, trouble free service. Please read
this manual carefully and retain
it for future reference.
Adequate clearances must be
maintained for safe and proper
operation.
INSTALLATION
Service Connections ..................................................... 2
ERRORS: Descriptive, typographic or pictorial errors are
subject to correction. Specications are subject to change
without notice.
Page 4
Service Connections
ELECTRICAL REQUIREMENTS
PHASE
208V220V240V380V416V480V
kWAMPkWAMPkWAMPkWAMPkWAMPkWAMP
330.083.330.078.730.072.230.045.630.041.630.036.1
Electrically heated steam generator operating at 0 PSI (0kg/
cm2) with field replaceable elements rated at: 15kW per
generator, 30kW total. The generator shall be equipped for
operation on:
Connection for incoming power supply wire on
terminal block.
CW1
DDrain Connection - 1” ø(25mm) IPS to open
floor drain. NO SOLID CONNECTION! 24”
length before open air gap opening. NO BENDS
OR ELBOWS!
CW1Cold Generator Water - 3/8” (10mm) tubing at
25-50 PSI.
CW2Cold Condensing Water - 3/8” (10mm) tubing
16.75
[425]
1.38
[35]
EC
2.62 [67]
at 25-50 PSI.
DRAIN LINE INSTALLATION:
The drain ports of the unit are marked with a colored tag
and are located at the lower rear left side of the boiler as
viewed from the front. Two 2” (51mm) NPT drain lines must
be connected to divert the exhaust to the floor drain. If it is
necessary to use more than three elbows, increase the size
of the waste line accordingly.
CAUTION: Before connecting water to this unit, water supply should be analyzed to make sure hardness is no greater
than 2.0 grains and pH level is within the range of 7.0-8.5.
Water which fails to meet these standards should be treated
by installation of water conditioner. EQUIPMENT FAILURE
CAUSED BY INADEQUATE WATER QUALITY IS NOT
COVERED UNDER WARRANTY.
19.88
[505]
1
[25]
28
[711]
CW1
CW2
[127]
1.5
[38]
68.5
[1740]
5
INSTALLATION
2
Page 5
Installation Instructions
This steamer was inspected before leaving the factory.
The transportation company assumes full responsibility
for safe delivery upon acceptance of the shipment. Immediately after unpacking the steamer, check for possible
damage. If the steamer is found to be damaged after unpacking, save the packaging material and contact the carrier within 15 days of delivery.
Prior to installation, verify that the electrical service agrees
with the specications on the machine data plate which is
located on the left side panel.
LOCATION
Allow space for plumbing and electrical connections.
Allow adequate access for operating and servicing the
steamer, 36” (915 mm) at the front of the steamer and 15”
(381 mm) above the steamer.
LEVELING AND ANCHORING
1. Using a spirit level or pan of water in the bottom of the
steamer, adjust the levelling feet to level the steamer
front-to-back and side-to-side.
2. Mark hole locations on the oor through the anchoring holes provided in the anged adjustable feet. Remove the steamer and drill holes at marked locations
on the oor. Insert proper anchoring devices.
PLUMBING CONNECTIONS
WARNING
Plumbing connections must comply with applicable sanitary, safety, and plumbing codes.
The water supply inlets are provided with 3/8” (10 mm)
compression ttings for 3/8” O.D. copper tubing. The water supply line pressure should be 25 - 50 psi (170 - 345
kPa) for each line. The water supply to the generator tank
is separate from the water supply to the cooling system
where steam is condensed before entering the drain line.
Install line strainers (not provided). A manual shutoff valve
for each supply line must be provided convenient to the
steamer.
We recommend treated water feeding the boiler inlet supply, and untreated water feeding the cooling system inlet.
Hook-ups are labeled on the back of the steamer.
ADJUSTMENT FOR HIGH ALTITUDE LOCATIONS
The steamer has been factory set so that when it is ON,
and during the READY phase, it will maintain water temperature in the steam generator tank at approximately
205°F (96°C) (just below water boiling point). However,
for high altitude locations, an authorized service agency
must adjust the steamer to achieve this temperature.
3. Set steamer back in proper position.
4. Install bolts through anchoring holes and into anchors
to secure the steamer to the oor. Seal bolts and
anged feet with Silastic.
5. After the drain is connected, check for level by pour-
ing water onto the oor of the compartment. All water
should drain through the opening at the back of the
compartment cavity.
ELECTRICAL CONNECTION
WARNING
Electrical and grounding connections must
comply with applicable portions of the national electrical code and/or other local electrical
codes.
WARNING
Disconnect the power supply to the appliance
before cleaning or servicing.
Make electrical connection through the 1-1/8” (29 mm) diameter hole provided using 3/4” (19 mm) trade size conduit. Refer to the wiring diagram located inside the right
side panel. Use 90°C minimum insulated wire.
ADJUSTMENT FOR DRAIN WATER TEMPERATURE
Cooling solenoid valves have been adjusted to yield drain
temperatures of 140°F. This will vary depending on install location water supply temperature and pressure. A
qualied service person should adjust the cooling solenoid valves should the drain temperature be other than
desired.
3
INSTALLATION
Page 6
Installation Instructions
DRAIN CONNECTIONS
The drain connection must be 1” (25 mm) IPS down, preferably with one or two elbows only, maximum length 6
feet (1830 mm) and piped to an open gap type drain (Figure 1). Drain pipe should be either iron or copper. DO
NOT use PVC pipe – PVC pipe may lose its rigidity or
glue may fail.
CAUTION
To avoid injury or damage to the steamer, do
not connect solidly to any drain connection.
WATER QUALITY
The water supply connected to the steam generator
should meet the following guidelines: Failure to comply
with water quality statement on page 2 may void the warranty.
Water supplies vary from one location to another. Other
factors affecting steam generation are iron content, chlorides, and dissolved gasses. A local water treatment specialist should be consulted before installing any steam
generating equipment.
Untreated water contains scale producing minerals which
can precipitate onto the surfaces in the boiler. Due to the
temperatures in the boiler, the minerals can bake onto the
surfaces and components. This can result in early component failure and reduced product life.
Mineral scale on components causes several problems:
1. The surfaces of the heating devices become coated
with scale, reducing the heat transfer efciency. This
can produce hot spots on the heating elements and
result in premature failure.
2. The water level probes become coated with scale.
Scale will bridge across the probe insulator from the
metal extension which senses the water level in the
boiler shell. Once this scale becomes wet, the water
level control is unable to maintain the proper water
level in the boiler. This situation may cause an electric
heating element to fail if the element is not adequately covered by water.
Figure 1
Strainers and lters will not remove minerals from the water. Refer to REMOVAL OF LIME SCALE DEPOSITS.
VENT HOOD
Some local codes may require the steamer to be located
under an exhaust hood. Information on the construction
and installation of ventilating hoods may be obtained from
NFPA Standard No. 96, Vapor Removal from Cooking
Equipment, (latest edition).
INSTALLATION
4
Page 7
WARNING
The steamer and its parts are hot. Use care
when operating, cleaning or servicing the
steamer. The cooking compartment contains
live steam. Stay clear while opening the door.
Once the steamer is installed and all mechanical connections have been made, thoroughly test the steamer before
operation.
1. Check that proper water, drain, and electrical connections have been made.
2. Turn main power switch ON. After approximately 15
minutes, the READY light should come on, indicating
that the water temperature is 205°F (96°C).
3. When the READY light comes on, set the timer at 5
minutes. With door open, observe that no steam is
entering the compartment and the COOKING light is
OFF.
4. Close compartment door. The COOKING light should
now be lit and steam should be heard entering the
compartment after about 45 seconds (5 minutes if
boiler is empty).
Start-Up Test
5. Check drain line to ensure that water from the cold
water condenser is owing through the drain line.
6. Open compartment door and observe that steam
supply to the chamber is cut off (READY light should
again come on and COOKING light goes off).
7. Close compartment door and let cooking cycle nish.
When the timer returns to the “O” position, a buzzer
will sound, signalling the end of the cooking cycle. To
silence the buzzer, turn the dial timer to OFF.
8. Complete the above steps for each cooking compartment.
9. To shut the steamer down, turn the main power switch
OFF and leave the compartment doors slightly open
to allow the inside to dry out.
5
INSTALLATION
Page 8
Control Panel
WARNING
An obstructed drain can cause personal injury
or property damage.
1. Ready Plot Light - When lit, indicates steam generator has reached 200º Fahrenheit (93º Celsius) and is
ready for the cooking cycle.
2. Cooking Pilot Light - When lit, indicates that a cooking cycle is in progress.
3. Timed Cooking/Constant Cooking Mode - Set the
cooking time (0 to 60minutes) - steam cooking will
begin after the door is closed. The cooking cycle will
be interrupted if the door is opened during the cooking cycle; resume cooking by closing the door. Select
“Constant Steam” for continuous cooking.
4. Main Power Switch
ON - The steam generator will automatically ll and
begin heating to the pre-set temperature for standby.
Red light will illuminate on the main power switch.
OFF - The steam generator will drain. No lights.
DELIME - Closes the drain valve while CLR liquid
is being poured into the steam generator during the
Delime procedure. Amber light will illuminate on the
main power switch.
5. Buzzer - Signals end of cooking period (not shown).
OPERATION
Figure 2
6
Page 9
Operating Instructions
BEFORE FIRST USE
Clean the protective oils from all surfaces of the steamer. Use a non-corrosive, grease dissolving commercial
cleaner, following manufacturer’s directions. Rinse thoroughly and wipe dry with a soft clean cloth.
PREHEAT
Turn the main power switch ON. When the READY light
comes on, set the timer to 1 minute to preheat the com-
partment. This should be done when the steamer is rst
used for the day or whenever the chamber is cold. The
door should be closed during the preheat cycle. The
COOKING light will be lit. When the buzzer sounds, set
the timer to the OFF position. The steamer is now ready
to cook.
COOK
With compartment preheated and READY light ON, place
pans of food into the compartment and close the door.
Set timer to desired cooking time. (The cooking cycle may
be interrupted at any time by opening the door. To resume
operation, close the door.) Steam will ow into the compartment and the COOKING light will be lit.
At the end of the cooking cycle, the buzzer will sound, the
COOKING light will go off and steam
supply to the compartment will cease. Turn the timer to
the OFF position to silence the buzzer.
CONSTANT STEAM COOKING
This mode will give continuous steam to the cooking
chamber until the operator turns power OFF to the steamer.
When cooking is complete, or not in use, the constant
steam cooking feature should be shut off. This prevents
the boiler from running unnecessarily. This will help conserve water, and will reduce boiler maintenance.
COOKING HINTS
Your steamer efciently cooks vegetables or other foods
for immediate serving. Steam cooking should be carefully
time controlled. Keep hot food holding-time to a minimum
to produce the most appetizing results. Prepare small
batches, cook only enough to start serving, then cook additional amounts to meet demand.
Preparation
Prepare vegetables, fruits, meats, seafood, and poultry normally by cleaning, separating, cutting, removing
stems, etc. Cook root vegetables in a perforated pan.
Other vegetables may be cooked in a perforated pan un-
less juices are being saved. Liquids can be collected in a
solid pan placed under a perforated pan.
Perforated pans are used for frankfurters, wieners, and
similar items when juices do not need to be preserved.
Solid pans are good for cooking puddings, rice and hot
breakfast cereals. Vegetables and fruits are cooked in solid pans in their own juice. Meats and poultry are cooked in
solid pans to preserve their juice or return broth.
Canned foods can be heated in their opened cans (cans
placed in solid pans), or the contents may be poured into
solid pans. DO NOT place unopened cans in the steamer.
Frozen Food Items
Separate frozen foods into smaller pieces to allow more
efcient cooking.
Use a pan cover for precooked frozen dishes that cannot
be cooked in the covered containers in which they are
packed if they require more than 15 minutes of cooking
time. When a cover is used, approximately one-third additional cooking time is necessary. Cooking time for fro-
zen foods depends on the amount of defrosting required.
If time permits, allow frozen foods to partially thaw overnight in a refrigerator. This will reduce their cooking time.
SHUTDOWN
Turn main power switch OFF. The boiler will automatically blow down. Leave the compartment door open to
allow the inside to dry out. For an extended shutdown,
turn the main power switch OFF; turn power and water
supply OFF.
Drain the boiler after each day’s use to ush out minerals
and minimize scale build-up. The boiler drains automatically for approximately 4 - 6 minutes after the main power
switch is turned off.
7
OPERATION
Page 10
Suggested Cooking Guidelines
PRODUCT
Eggs10 - 128 dozen
Scrambled154 dozen
Hard Cooked252 lb
Rice, Long Grain (Cover with 4 cups water/lb.)252 lb
Pasta (Place perforated pan inside solid pan, cover with cold water.)
Spaghetti, Regular/Vermicelli12 -15
Macaroni, Shells/Elbows15 - 18
Lasagna Noodles15 - 18
Frozen Casseroles, Lasagna35Full Pan
Meat Loaf, 3 - 5 lb each4015 lb
Beef
Ground Chuck20 - 2510 lb
Beans
Baked/Refried910 lb can
Chicken - Breasts, Legs, Thighs2015 lb
TIMER SETTING
(minutes)
WEIGHT
PER PAN
Turkey, Frozen
Breasts (2)906 - 7 lb each
Hot Dogs380 - 100
SEAFOOD
Clams
Frozen10 - 123 dozen
Fresh, Cherrystone5 - 63 dozen
King Crab, Frozen
Claws42-1/2 lb
Legs4 - 64-1/2 lb
Shrimp, Frozen, 10 per lb.54 lb
Lobster Tail, Frozen610 lb
Lobster, Live, 10” - 12”54 per pan
Scallops, Fresh43 lb
Scrod Fillets, Fresh3 - 54 lb
OPERATION
8
Page 11
Suggested Cooking Guidelines
PRODUCT
VEGETABLES
Asparagus Spears
Frozen10 - 123 dozen
Fresh55 lb
Beans
Green, 2” Cut, Frozen/Fresh65 lb
Lima, Frozen85 lb
Broccoli
Spears, Frozen84 lb
Spears, Fresh65 lb
Florets, Frozen65 lb
Carrots
Baby Whole, Frozen87 lb
Crinkle Cut, Frozen7 - 84 lb
Sliced, Fresh119 lb
TIMER SETTING
(minutes)
WEIGHT
PER PAN
Cauliower, Florets
Frozen64 lb
Fresh7 - 85 lb
Corn
Yellow Whole Kernel, Frozen55 lb
Cobbettes, Frozen827 ears
Corn-on-Cob, Fresh10 - 1218 ears
Peas, Green65 lb
Potatoes, Whole Russet5540 lb
Zucchini, Slices810 lb
Canned Vegetables610 lb can
Frozen Mixed Vegetables6 - 75 lb
9
OPERATION
Page 12
Cleaning
CAUTION
Do not use cleaning agents that are corrosive.
WARNING
Disconnect the power supply to the appliance
before cleaning or servicing.
At the end of each day, or between cooking cycles if
necessary...
1. Turn main power switch OFF.
2. Remove pans and racks from compartment and wash
in sink.
3. Wash compartment interior with clean water. Never
use steel wool or abrasive scouring pads as they will
scratch and ruin the general surface appearance of
the steamer.
Avoid rubbing with steel pads, wire brushes, or scrapers
that can leave iron deposits on stainless steel; instead,
use plastic scouring pads or soft cloths. For stubborn
stains, use products such as Cameo, Talc, or Zud First
Impression. Always rub parallel to polish lines or with the
grain.
Hard water can leave deposits that promote rust on stain-
less steel. Treated water from softeners or certain lters
can eliminate these mineral deposits. Other deposits from
food or lubrication must be properly removed by cleaning. Use mild detergent and non-chloride cleaners. Rinse
thoroughly. Wipe dry. If using chloride containing cleaners
or sanitizers, rinse repeatedly to avoid stainless steel corrosion. Where appropriate, apply a polish recommended
for stainless steel (such as Benet or Super Sheen) for
extra protection and lustre.
REMOVAL OF SCALE DEPOSITS
4. Use warm soapy water with a cloth or sponge to
clean the exposed bead of the door gasket. Rinse
with warm clear water and wipe dry with a dry cloth.
5. Wipe surfaces which touch the door gasket with a
cloth or sponge and warm soapy water. Rinse with
warm clear water and wipe with a dry cloth. CAU-
TION: Do not allow the door gasket to come in
contact with food oils, petroleum solvents, or lubricants. Wipe all solids away from the drain open-
ings in the compartments to prevent clogging.
6. Remove drain screens from inside compartment
drains. Using a plastic bottle brush and mild detergent, clean inside the drain opening ensuring there is
no food residue or blockage. Clean the drain screen
and replace in its original position.
7. Leave the door slightly open when the steamer is not
in use to allow the inside to dry out.
Weekly, or more often if necessary...
Clean exterior with a damp cloth and polish with a soft
dry cloth. Use a non-abrasive cleaner to remove discolorations.
GUIDELINES FOR MAINTAINING STAINLESS STEEL
SURFACES
There are three things that can break down stainless steel
and allow corrosion to develop:
1. Abrasion;
WARNING
Read and follow instructions on the CLR
bottle. Use plastic or rubber gloves to avoid
skin contact. If CLR comes in contact with
skin, rinse with clear water.
1. Drain steam generator tank by setting ON/OFF switch
to off. Set cooking timer to “OFF”.
2. Set switch to de-lime. This closes drain valve.
3. Unscrew plug in deliming port at rear of unit. Insert
hose in delime tting. Pour 28 ounces of solution into
generator slowly to avoid spillage. Remove hose.
Screw plug into deliming tting so it seals tightly.
4. Allow steamer to remain in ready cycle for 1 1/2 hours
then turn ON/OFF switch off and allow generator to
drain.
5. Flush cycle. Turn ON/OFF switch to on. When ready
light comes on, switch to off to ush generator. Repeat this step three times to completely ush genera-
tor.
6. Clean exterior and interior. Use a mild solution of
soap and water. Rinse with clean water. Dry with a
soft clean cloth. Leave compartment door open when
not in use.
The steamer is now ready for use or turn off for overnight
shutdown.
2. Deposits and water;
3. Chlorides.
MAINTENANCE
10