ECO-JET
CONVECTION STEAMER W/TWIN GENERATORS
INSTALLATION - OPERATION - MAINTENANCE
MODELS
EJ-10E
44 Lakeside Avenue, Burlington, Vermont 05401 USA
Telephone: (802) 658-6600 Fax: (802)864-0183
www.mi.com PN 14-0274 Rev A (7/14)
© 2014 - Market Forge Industries Inc.
Your Service Agency’s Address:
Model
Serial number
Oven installed by
Installation checked by
IMPORTANT
TABLE OF CONTENTS
WARNING: Improper installation, adjustment, alternation,
service or maintenance can
cause property damage, injury or death. Read the installation, operation and maintenance instructions thoroughly
before installing or servicing
this equipment.
FOR YOUR SAFETY
Do not store or use gasoline or
other ammable vapors or liquids in the vicinity of this or any
other appliance.
The information contained in this
manual is important for the proper installation, use, and maintenance of this oven. Adherence
to these procedures and instructions will result in satisfactory
baking results and long, trouble free service. Please read
this manual carefully and retain
it for future reference.
Adequate clearances must be
maintained for safe and proper
operation.
INSTALLATION
Service Connections ..................................................... 2
Installation Instructions ................................................... 3
Location ............................................................ 3
Leveling and Anchoring ............................................... 3
Electrical Connection ................................................. 3
Plumbing Connections ................................................ 3
Adjustment for High Altitude Locations ................................. 3
Adjustment for Drain Water Temperature ............................... 3
Drain Connections .................................................... 4
Water Quality ........................................................ 4
Vent Hood ........................................................... 4
Start-Up Test ............................................................ 5
OPERATION
Control Panel ............................................................ 6
Operating Instructions .................................................... 7
Before First Use ...................................................... 7
Preheat ............................................................. 7
Cook ................................................................ 7
Constant Steam Cooking ............................................. 7
Shutdown ........................................................... 7
Cooking Hints ....................................................... 7
Suggested Cooking Guidelines ............................................ 8
MAINTENANCE
Cleaning ............................................................... 10
ERRORS: Descriptive, typographic or pictorial errors are
subject to correction. Specications are subject to change
without notice.
Service Connections
ELECTRICAL REQUIREMENTS
PHASE
208V 220V 240V 380V 416V 480V
kW AMP kW AMP kW AMP kW AMP kW AMP kW AMP
3 30.0 83.3 30.0 78.7 30.0 72.2 30.0 45.6 30.0 41.6 30.0 36.1
Electrically heated steam generator operating at 0 PSI (0kg/
cm2) with field replaceable elements rated at: 15kW per
generator, 30kW total. The generator shall be equipped for
operation on:
208 VAC, 3 Phase, 60 Hz
240 VAC, 3 Phase, 60 Hz
DIMENSIONS ARE IN INCHES [MM]
9
[229]
1/2” NPT Delime Inlet
24 [610]
1.12
[29]
3.94 [100]
3 [76]
1.75 [45]
Additional voltages available as an option.
SERVICE CONNECTIONS
EC Electrical Connection - ø1-1/8” (29mm)
33
[838]
D
CW2
EC
Connection for incoming power supply wire on
terminal block.
CW1
D Drain Connection - 1” ø(25mm) IPS to open
floor drain. NO SOLID CONNECTION! 24”
length before open air gap opening. NO BENDS
OR ELBOWS!
CW1 Cold Generator Water - 3/8” (10mm) tubing at
25-50 PSI.
CW2 Cold Condensing Water - 3/8” (10mm) tubing
16.75
[425]
1.38
[35]
EC
2.62 [67]
at 25-50 PSI.
DRAIN LINE INSTALLATION:
The drain ports of the unit are marked with a colored tag
and are located at the lower rear left side of the boiler as
viewed from the front. Two 2” (51mm) NPT drain lines must
be connected to divert the exhaust to the floor drain. If it is
necessary to use more than three elbows, increase the size
of the waste line accordingly.
CAUTION: Before connecting water to this unit, water supply should be analyzed to make sure hardness is no greater
than 2.0 grains and pH level is within the range of 7.0-8.5.
Water which fails to meet these standards should be treated
by installation of water conditioner. EQUIPMENT FAILURE
CAUSED BY INADEQUATE WATER QUALITY IS NOT
COVERED UNDER WARRANTY.
19.88
[505]
1
[25]
28
[711]
CW1
CW2
[127]
1.5
[38]
68.5
[1740]
5
INSTALLATION
2