Market Forge EJ-10E Installation Manual

ECO-JET
CONVECTION STEAMER W/TWIN GENERATORS
INSTALLATION - OPERATION - MAINTENANCE
MODELS
44 Lakeside Avenue, Burlington, Vermont 05401 USA
Telephone: (802) 658-6600 Fax: (802)864-0183
www.mi.com PN 14-0274 Rev A (7/14)
© 2014 - Market Forge Industries Inc.
Your Service Agency’s Address:
Model
Serial number
Oven installed by
Installation checked by
IMPORTANT
TABLE OF CONTENTS
WARNING: Improper installa­tion, adjustment, alternation, service or maintenance can cause property damage, in­jury or death. Read the instal­lation, operation and mainte­nance instructions thoroughly before installing or servicing this equipment.
FOR YOUR SAFETY
Do not store or use gasoline or other ammable vapors or liq­uids in the vicinity of this or any other appliance.
The information contained in this manual is important for the prop­er installation, use, and mainte­nance of this oven. Adherence to these procedures and instruc­tions will result in satisfactory baking results and long, trou­ble free service. Please read this manual carefully and retain it for future reference.
Adequate clearances must be
maintained for safe and proper operation.
INSTALLATION
Service Connections ..................................................... 2
Installation Instructions ................................................... 3
Location ............................................................ 3
Leveling and Anchoring ............................................... 3
Electrical Connection ................................................. 3
Plumbing Connections ................................................ 3
Adjustment for High Altitude Locations ................................. 3
Adjustment for Drain Water Temperature ............................... 3
Drain Connections .................................................... 4
Water Quality ........................................................ 4
Vent Hood ........................................................... 4
Start-Up Test ............................................................ 5
OPERATION
Control Panel ............................................................ 6
Operating Instructions .................................................... 7
Before First Use ...................................................... 7
Preheat ............................................................. 7
Cook ................................................................ 7
Constant Steam Cooking ............................................. 7
Shutdown ........................................................... 7
Cooking Hints ....................................................... 7
Suggested Cooking Guidelines ............................................ 8
MAINTENANCE
Cleaning ............................................................... 10
ERRORS: Descriptive, typo­graphic or pictorial errors are subject to correction. Speci­cations are subject to change without notice.
Service Connections
ELECTRICAL REQUIREMENTS
PHASE
208V 220V 240V 380V 416V 480V
kW AMP kW AMP kW AMP kW AMP kW AMP kW AMP
3 30.0 83.3 30.0 78.7 30.0 72.2 30.0 45.6 30.0 41.6 30.0 36.1
Electrically heated steam generator operating at 0 PSI (0kg/ cm2) with field replaceable elements rated at: 15kW per generator, 30kW total. The generator shall be equipped for operation on:
 208 VAC, 3 Phase, 60 Hz  240 VAC, 3 Phase, 60 Hz
DIMENSIONS ARE IN INCHES [MM]
9
[229]
1/2” NPT Delime Inlet
24 [610]
1.12 [29]
3.94 [100]
3 [76]
1.75 [45]
Additional voltages available as an option.
SERVICE CONNECTIONS
EC Electrical Connection - ø1-1/8” (29mm)
33
[838]
D
CW2
EC
Connection for incoming power supply wire on terminal block.
CW1
D Drain Connection - 1” ø(25mm) IPS to open
floor drain. NO SOLID CONNECTION! 24” length before open air gap opening. NO BENDS OR ELBOWS!
CW1 Cold Generator Water - 3/8” (10mm) tubing at
25-50 PSI.
CW2 Cold Condensing Water - 3/8” (10mm) tubing
16.75 [425]
1.38 [35]
EC
2.62 [67]
at 25-50 PSI.
DRAIN LINE INSTALLATION:
The drain ports of the unit are marked with a colored tag and are located at the lower rear left side of the boiler as viewed from the front. Two 2” (51mm) NPT drain lines must be connected to divert the exhaust to the floor drain. If it is necessary to use more than three elbows, increase the size of the waste line accordingly.
CAUTION: Before connecting water to this unit, water sup­ply should be analyzed to make sure hardness is no greater than 2.0 grains and pH level is within the range of 7.0-8.5. Water which fails to meet these standards should be treated
by installation of water conditioner. EQUIPMENT FAILURE
CAUSED BY INADEQUATE WATER QUALITY IS NOT COVERED UNDER WARRANTY.
19.88 [505]
1
[25]
28
[711]
CW1
CW2
[127]
1.5
[38]
68.5
[1740]
5
INSTALLATION
2
Loading...
+ 8 hidden pages