Market Forge EJ-10E Service Manual

ECOJET EJ-10E & EJ-7E
ELECTRIC CONVECTION STEAMER W/TWIN GENERATORS
PARTS AND SERVICE MANUAL
EFFECTIVE JULY 31, 2014
The Company reserves the right to make substitution in the event that items specied are not available.
ERRORS: Descriptive and/or typographic errors are subject to correction.
44 Lakeside Avenue, Burlington, Vermont 05401 USA Telephone: (802) 658-6600 Fax: (802) 860-3732
MARKET FORGE INDUSTRIES
www.mi.com
P/N 14-0282 Rev A (7/14)
TABLE OF CONTENTS
SERVICE ADJUSTMENTS ..............................................................3
WIRING DIAGRAMS ...................................................................4
ILLUSTRATED PARTS LIST
STEAMER EXPLODED VIEW ......................................................... 10
CABINET BASE EXPLODED VIEW .................................................... 15
JULY 31, 2014 2 EJ-7E & EJ-10E
SERVICE ADJUSTMENTS
ADJUSTMENT FOR HIGH ALTITUDE LOCATIONS
NOTICE
Contact the factory, the factory representative or local service company to perform mainte­nance and repairs.
The steamer has been factory set so that when it is ON and during the READY phase, it will maintain water tem­perature in the steam generator tank at approximately 205 degrees Fahrenheit (just below water boiling point). However, for high altitude locations, an authorized ser­vicer must adjust the steamer to achieve this tempera­ture. To adjust:
1. Remove side panel and turn control panel power switch to ON.
2. Open compartment door, and after about 15 minutes, steam will be seen, entering the cooking compart­ment.
3. Turn thermostat shaft counterclockwise to lower tem­perature until steam just ceases to enter cooking compartment and READY light goes on.
4. Replace side panel.
5. Follow TESTING PROCEDURES in this manual.
WATER FLOWS INTO DRAIN DURING SHUTDOWN
When steamer is shut down and cold water is running continuously into the open drain, either or both solenoid valves did not close when steamer was turned off.
1. Disassemble solenoid valve(s) and examine for scale or foreign particles lodged in diaphragm or core tube.
2. Clean valve(s) thoroughly and reassemble, or replace valve(s).
WATER OVERFLOWS INTO COOKING COMPART­MENT
When steamer is rst turned on for the day, and the fol­lowing conditions occur: - READY light does not come on after about 15 minutes,
Water begins to overow into cooking compartment,
Water ll solenoid valve is open, then any or all of
these symptoms may indicate a problem with the operating probe due to either:
1. A short between the operating probe terminal and body of the steamer. Call your authorized servicer.
2. Excessive scale build-up on the operating probe. This acts as an “insulation” and prevents the probe from sensing the water level. It is therefore unable to close
the water ll (solenoid) valve to shut off the water.
As a temporary solution, with power OFF, unscrew probes, check visually, and clean or chip off scalant. Re­place probe.
This problem is an indication of severe harmful water con­ditions which should be corrected immediately to avoid damage to the components and ultimate malfunction of the steamer.
HEATER ELEMENTS DO NOT COME ON
When the steamer is turned ON and heater elements do not activate, and therefore, the READY light does not come on, then the contactors may be burned out. If a con­siderable amount of “chattering” of contactors has been previously experienced, then the thermostat bulb may be coated with scalant and unable to sense water tempera­ture in the boiler accurately, and therefore unable to con­trol the contactors.
1. Replace contactors.
DRAIN WATER TEMPERATURE TOO LOW OR TOO HIGH
Cooling solenoid valves are adjustable with ne adjust­ment screw on the bottom of the valve.
1. Run cooking compartment empty until drain tempera­ture stabilizes.
2. Turn ne adjustment screw on cooling solenoid valve out to decrease drain temperature and in to increase drain temperature.
JULY 31, 2014 3 EJ-7E & EJ-10E
2. Unscrew operating thermostat bulb, clean off scal­ants and screw thermostat bulb back in.
This problem is an indication of inadequate water qual­ity and is not covered under warranty. Have water quality analysed and corrected immediately to avoid complete malfunction of the steamer.
WIRING DIAGRAMS
JULY 31, 2014 4 EJ-7E & EJ-10E
WIRING DIAGRAMS
JULY 31, 2014 5 EJ-7E & EJ-10E
Loading...
+ 11 hidden pages