2.3 Packing list for pump
(Optional - Required where the gas or air sample is below 10 psi)
2.4 Packing list for dryer
(Optional - Required for monitoring ultra-volatile compounds in humid
atmospheres)
Note that the Air Server Nafion dryer requires a pressure regulated (~15 psi)
supply of around 200 ml/min dry gas (air or nitrogen) with a dew point below
-35°C (as required for UNITY).
Note also that appropriate fittings will be required to connect the regulated dry
gas supply to the 1/8” PTFE Air Inlet tubing provided.
3.0 Installation
Note: It is strongly recommended that the installation of the Air Server is carried
out by a qualified (fully trained) engineer.
If the Air Server has been purchased as part of a complete UNITY-Air Server
system it is recommended that the UNITY(e) system is installed and tested first
(see UNITY Operators Manual Section Section 4.0). After successful completion
of the UNITY system the Air Server should be installed as detailed below.
The Air Server must sit to the immediate left of UNITY(e) (as you look at the
system from the front), see Figure 1. At least 15 cm of free bench space is
Part number Description Quantity
SERASU-5023 Nafion Dryer Assembly 1
SERZ-0036 PTFE tubing 1/8” (for Air inlet) 2 m
Part number Description Quantity
U-ASPMP1
or
U-ASPMP2
Pump 115V
or
Pump 230V
1
SERASU-5025 Copper Tube Adaptor 1
SERZ-0206 Tubing Silicone Rubber x 500 mm 2
SERZ-0207 Pump Power Cord (connects to Air Server) 1
-11-
QUI-0004 V6.1
Aug 06
Air Server / MCS User Manual Markes International
www.markes.com
Markes International Ltd. T: +44 (0) 1443 230935 F: +44 (0) 1443 231531 E: enquiries@markes.com