Marco ECOBOILER T5, ECOBOILER T10, ECOBOILER PB5, ECOBOILER PB10 User guide

Marco Beverage Systems Ltd.
INSTRUCTIONS FOR MODELS
ECOBOILER T5
ECOBOILER T10
ECOBOILER PB5
ECOBOILER PB10
Water pressure : 5 - 50 psi (min.-max.)35 - 345 kPa (min.-max.)
Marco Beverage Systems Limited.
63d Heather Road, Sandyford Industrial Estate, Dublin 18.
MARCO is an
ISO9001:2000
Registered
Company.
Marco Beverage Systems Limited.
Shire House, Strixton Manor, Strixton, Wellingborough, Northants, NN29 7PA
Ireland Tel: +353 (0)1 295 2674 Ireland Fax: +353 (0)1 295 3715 email: sales@marco.ie
www.marco.ie
UK Tel: +44 (0)2072 744 577 UK Fax: +44 (0)2079 788 141 email: sales@marco-bev.co.uk
www.marco-bev.co.uk
SAFETY:
This appliance must be earthed. If the moulded plug supplied is not used then ensure that the green/yellow cable is connected to a suitable earth.
Risk of flooding. The hose supplied with this unit is non-toxic food quality tested to 190psi. However, a hose is not
a permanent connection. It is, therefore, advisable to switch off
boiler and close the stopcock valve when boiler is not in use, e.g. overnight, weekends etc.
Risk of scalding. Beware of accidentally operating the water drawoff tap or push button especially when cleaning the front of the boiler.
The utmost care has been taken in the manufacture and testing of this unit. Failure to install, maintain and / or operate this boiler according to the manufacturer’s instructions may result in conditions that can cause injury or damage to property. If in any doubt about the serviceability of the boiler always contact the manufacturer or your own supplier for advice.
INSTALLATI ON DETAILS:
Ele ctr ica l i nst al lat ion :
Electrical specification: 2.8kW-230V-50Hz
A moulded 13A plug is factory fitted. A suitable 13A outlet is all that is required.
Plu mbi ng in s ta l la tio n p roc edu re:
Mains water pressure required (limits): 5-50psi (35-345kPa)
Fit a stop Valve on a cold water line and attach a 3/4" BSP male fitting,
(e.g. 3/4" x 1/2" 311 or washing machine type stop valve).
Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached
sealing washer is fitted.
Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several gallons through.
Connect right-angled tailpiece of the hose to the inlet valve of the boiler (again 3/4" BSP). Make sure the sealing washer is fitted here also.
Turn on water and check for leaks.
Ope rat ing bo ile r for th e f irs t t ime :
Check that all installation procedures have been carried out.
Ensure water valve is on.
Plug boiler into 13A socket and press power button on the front of the machine marked
‘Power’. Refer to Figure 1.
NOTE: On a 5L machine the ‘Power’ button light also acts as the “Ready/Status” indicator.
The “power on” light will glow green and the machine will fill to a safe level, above the elements, before heating.
The “Ready/Status” light will cycle two red flashes while the machine is filling to the safe level.
After this amount of water has heated to about 96ºC the boiler will draw more water in until the
temperature drops by 1 or 2 degrees. The boiler will then heat again. This heat fill cycle continues until the boiler is full.
On a 5L machine, whilst the machine is above the safe level and filling, the “Ready/Status” light will glow orange.
On a 10L machine, whilst the machine is above the safe level and filling, the “Ready/Status” light will remain blank.
The “Ready/Status” light will glow green when the machine is both full and up to normal operating temperature. For 5L allow approx. 15 minutes. For 10L machines allow approx 30 minutes.
The boiler is now ready for use.
Loading...
+ 2 hidden pages