Manner MES, MSS, MHS, MMS, MIS Technical Information

...
TECHNICAL INFORMATION
HOT RUNNER SYSTEMS
Start-up Instructions
for männer Hot Runner Valve Gate Systems
Please note: use dehumidified air only. Minimum air pressure required for pin actuation: 6 bar.
MES
1 2 3 4
Turn on mold cooling and gate cooling before heating up the hot runner system.
During the heating cycle, the compressed air for pin operation must be switched off.
In general, use the “soft-start“ function of the control system. Heat the main manifold with the sprue bushing to approx. 80-90% of the required pro­duction temperature.
Turn on the submanifolds (cylinder blocks) and nozzles. Heat up the entire system to production temperature.
5 6 7
Maintain the system at production temperature for approx. 5 -10 min. prior to operating valve pins.
air for pin 6 bar).
operation
(min.
MSS / MMS / MHS / MIS / MXS / MZS
1
Turn on mold cooling and gate cooling before heating up the hot runner system.
4
Maintain the system at production temperature for approx. 5-10 minutes prior to operating valve pins.
2 3
In general, use the “soft-start“ function of the hot runner control system. Heat up manifold to approx. 80-90% of the required production temperature.
5
After the system is fully heated, start production.
Start production.Turn on the compressed
Turn on the nozzles, and heat up the entire system to production temperature.
When starting up after a production stop, purge the barrel of all remaining resin before restarting. For start-up, reduce the injection volume to 70% of the required amount.
IMPORTANT!
When starting up after a pro­duction stop, purge the barrel of all remaining resin before restarting. For start-up, re­duce the injection volume to 70% of the required amount.
IMPORTANT!
FILLING
Several injection cycles may be required to fill the hot runner system the first time the unit is used. Continually check the cavities after each cycle and remove all short shots until ultimately all parts are completely filled.
EMPTYING THE INJECTION UNIT
To prevent the gate orifices and valve pin s from be ing dam aged by co ld
material, do not actuate the valve pins while setting up the injection molding machine or while emptying the injection unit of any remaining material.
PRODUCTION STOP
Re duce the tempera ture of t he hot runner heating system to standby tem­perature (100° C to 150° C, depending on the resin). The valve pins should be in closed position.
SYSTEM SHUTDOWN
When shuttin g down th e hot r unner system, switch off all control circuits at the same time. To prevent the hot runner system from being damaged by heat accumulation, allow the mold cooling system to run for another 20-30 minutes at approx. 30° C.
REMOVING THE MOLD INSERTS
Before removing the mold inserts, make sure that the hot runner is switched off (temperature not exceeding 60° C) and the valve pins are in open position.
Maintenance Tips
for männer Hot Runner Valve Gate Systems
Polyolefins (f.e. PP/PE)
Approx. 2 million cycles*
Insulating ring
Check for leaks.
If any leaks are detected, please contact the männer service team.
Melt flow from manifold to hot runner nozzle
Check for leaks.
Always replace seals whenever the components are disassembled.
Polyesters (f.e. PC/PBT/PET)
Approx. 1 million cycles*
Engineered resins (f.e. PA)
Approx. 0.5 million cycles*
Gate
If the surface quality is not satisfactory, ensure that the valve pin and gate orifice are not damaged.
If any damage is detected, please contact the männer service team.
Nozzles
Clean off any dirt or deposits.
NOTE: Do not clean heating ele­ments in high-temperature sand baths or pyrolysis furnaces.
Pneumatic unit
Only use dehumidified air to operate the pneumatic unit of männer hot runner systems.
Remove heavy dirt buildup using cleaning fluid, and apply pneumatic grease to the contact surfaces.
Replace any brittle seals.
* The mai nte nan ce inte rva ls spec ifi ed here ar e only a n approximation. Actual intervals may vary, depending on the resins used, the injection parameters, and the part geometry. We will be happy to provide you with maintenance information for your specific hot runner system and application upon request.
Valve pin guide bushing and valve pin
Use an ultrasonic cleaning system or similar equipment to clean off any dirt or deposits produced as a result of outgassing.
NOTE: Do not use any abrasives to clean the valve pin guide bushing or valve pin.
If any damage is detected, please contact the männer service team.
We recommend that you check your männer hot runner system regularly to ensure optimum perfor­mance and long life.
Pl ease con tact the männer servic e team if any damage to the parts is detected.