
MPG460G
Malone MicroSport Trailer
01-2010
Model MPG460G Assembly Instructions
Take a few moments now and read through these instructions.
Familiarize yourself with the step by step assembly process before you
begin turning wrenches. Un-pack and sort the components into groups as
shown in the following photos. Then you will assemble each group in order.
Lets get started !!
Required Tools:
• 3/4” wrenches (2) • 9/16” wrenches (2) a 9/16” deep socket is very handy.
• Large at blade screw driver • 7/16” wrench (1)
• Razor knife • Pliers
• Wire stripping tool • Electrical connector crimping tool
• Lug wrench • Small hammer
Visit us at
maloneautoracks.com
for more ne products and accessories.
800-295-0042 ext 206
1
technical@maloneautoracks.com

MPG460G
Group 1:
Frame
Components
01-2010
Bag 11462
Group 2:
Axle / Spring
Components
Bag 11467
800-295-0042 ext 206
2
technical@maloneautoracks.com

MPG460G
01-2010
Group 3: Lighting Components
Group 4:
Bag 11464
Fender Components
Bag 11468
Group 5: Coupler Components
800-295-0042 ext 206
Bag 11494
3
technical@maloneautoracks.com

MPG460G
Group 6:
Load Bar
Components
01-2010
Bag 11497
800-295-0042 ext 206
4
technical@maloneautoracks.com

MPG460G
FRAME ASSEMBLY (Group 1)
1. We assemble the frame on its back to make it easier to install the springs
and axle. Once the springs and axle assembly is installed we will ip the trailer
over to complete the assembly. So rst, layout the frame components upside
down as shown. The spring bracket mounting holes should be facing up. All
the decals should be upside down.
01-2010
2. Attach the spring
hanger brackets
to the frame. The
U shaped shackle
bolt brackets mount
to the front and the
C shaped “slipper”
brackets mount to the
rear as shown. Use
3/8” x 1” bolts and
nuts. Assemble with the nuts on the inside of the frame rails. Fully tighten all 8 bolts now.
3. Identify the hitch end of the
tongue by the 3 holes on the left
side. Insert the small wire protection grommet into the lower
hole where shown, then push it
all the way in till it snaps in place.
800-295-0042 ext 206
5
technical@maloneautoracks.com

MPG460G
4. Pass the wiring harness into the grommet and out the front end of
the tongue as shown. Stretch out the white wire and leave an equal
length of the green/
brown/yellow wire
outside the grommet as shown. This
length of wires will
be the connector to
your tow vehicle.
5. Roll this wire so it
doesn’t get accidentally
pulled inside the tongue.
01-2010
6. Now its time to pass the wire ends thru the
tongue. Make sure the wires are tangle free, then
attach a weight to the end of the wires. A large
socket works great as shown or you could tape
a big bolt to the wires. Tip the tongue up and let
gravity work for you. Feed the wire and let
the weight slide through the tongue pulling
the wires with it.
800-295-0042 ext 206
6
technical@maloneautoracks.com

MPG460G
7. Installing the rear tongue support
bracket. First we lay the tongue back in
its place making sure its upside down.
Push the large wire protection grommet
into the rear tongue support bracket hole,
then pass the wires through the grommet.
Install the 4-1/2” long x 1/2” bolt up from
the bottom through the tongue support and tongue. Be careful not to pinch
the wires. Add a washer and nut. Hand tighten only.
01-2010
8. Bolt the tongue support to the frame
rails using 3/8” x 1” carriage head bolts.
Note the square heads go on the outside with the square holes in the frame.
Assemble with washers and nuts on the
inside. Hand tighten only.
800-295-0042 ext 206
7
technical@maloneautoracks.com